My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 information available. The Project Engineer's determination of the cost of work shall be <br /> I2 final. <br /> 3 <br /> 4 Progress payments for completed work and material on hand will be based upon <br /> I5 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 6 established at the preconstruction conference. <br /> 7 <br /> 1 8 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 9 commences the work, and successive progress estimates will be made every month <br /> 10 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 11 work are tentative, and made only for the purpose of determining progress payments. <br /> 12 The progress estimates are subject to change at any time prior to the calculation of the <br /> 13 final payment. <br /> I 14 <br /> 15 The value of the progress estimate will be the sum of the following: <br /> 16 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> I <br /> 17 work completed multiplied by the unit price. <br /> 18 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> 19 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 20 determination. <br /> 21 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 22 or other storage area approved by the Engineer. <br /> I23 4. Change Orders— entitlement for approved extra cost or completed extra work as <br /> 24 determined by the Engineer. <br /> 25 <br /> I26 Progress payments will be made in accordance with the progress estimate less: <br /> 27 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> I 28 2. The amount of progress payments previously made; and <br /> 29 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 30 Contract Documents. <br /> I 31 <br /> 32 Progress payments for work performed shall not be evidence of acceptable performance <br /> 33 or an admission by the Contracting Agency that any work has been satisfactorily <br /> I 34 completed. The determination of payments under the contract will be final in accordance <br /> 35 with Section 1-05.1. <br /> 36 <br /> ii <br /> I 37 Failure to perform any of the obligations under the Contract by the Contractor may be <br /> 38 decreed by the Contracting Agency to be adequate reason for withholding any payments <br /> 39 until compliance is achieved. <br /> I40 <br /> 41 Upon completion of all Work and after final inspection (Section 1-05.11), the amount due <br /> 42 the Contractor under the Contract will be paid based upon the final estimate made by the <br /> I 43 Engineer and presentation of a Final Contract Voucher Certification to be signed by the <br /> 44 Contractor. The Contractor's signature on such voucher shall be deemed a release of all <br /> 45 claims of the Contractor unless a Certified Claim is filed in accordance with the <br /> I 46 requirements of Section 1-09.11 and is expressly excepted from the Contractor's <br /> 47 certification on the Final Contract Voucher Certification. The date the Contracting Agency <br /> I <br /> FLEMING BICYCLE CORRIDOR 65 <br /> I <br /> PW 3767 November 15,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.