Laserfiche WebLink
I <br /> 1 information available. The Project Engineer's determination of the cost of work shall be <br /> I2 final. <br /> 3 <br /> 4 Progress payments for completed work and material on hand will be based upon <br /> I5 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 6 established at the preconstruction conference. <br /> 7 <br /> 1 8 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 9 commences the work, and successive progress estimates will be made every month <br /> 10 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 11 work are tentative, and made only for the purpose of determining progress payments. <br /> 12 The progress estimates are subject to change at any time prior to the calculation of the <br /> 13 final payment. <br /> I 14 <br /> 15 The value of the progress estimate will be the sum of the following: <br /> 16 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> I <br /> 17 work completed multiplied by the unit price. <br /> 18 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> 19 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 20 determination. <br /> 21 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 22 or other storage area approved by the Engineer. <br /> I23 4. Change Orders— entitlement for approved extra cost or completed extra work as <br /> 24 determined by the Engineer. <br /> 25 <br /> I26 Progress payments will be made in accordance with the progress estimate less: <br /> 27 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> I 28 2. The amount of progress payments previously made; and <br /> 29 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 30 Contract Documents. <br /> I 31 <br /> 32 Progress payments for work performed shall not be evidence of acceptable performance <br /> 33 or an admission by the Contracting Agency that any work has been satisfactorily <br /> I 34 completed. The determination of payments under the contract will be final in accordance <br /> 35 with Section 1-05.1. <br /> 36 <br /> ii <br /> I 37 Failure to perform any of the obligations under the Contract by the Contractor may be <br /> 38 decreed by the Contracting Agency to be adequate reason for withholding any payments <br /> 39 until compliance is achieved. <br /> I40 <br /> 41 Upon completion of all Work and after final inspection (Section 1-05.11), the amount due <br /> 42 the Contractor under the Contract will be paid based upon the final estimate made by the <br /> I 43 Engineer and presentation of a Final Contract Voucher Certification to be signed by the <br /> 44 Contractor. The Contractor's signature on such voucher shall be deemed a release of all <br /> 45 claims of the Contractor unless a Certified Claim is filed in accordance with the <br /> I 46 requirements of Section 1-09.11 and is expressly excepted from the Contractor's <br /> 47 certification on the Final Contract Voucher Certification. The date the Contracting Agency <br /> I <br /> FLEMING BICYCLE CORRIDOR 65 <br /> I <br /> PW 3767 November 15,2022 <br />