My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> 2 8-22.5 Payment I <br /> 3 <br /> 4 Section 8-22 is supplemented read as follows: <br /> 5 <br /> 6 "4-inch Paint Line", per Linear Foot <br /> 7 "4-inch Plastic Line", per Linear Foot <br /> 8 "8-inch Plastic Line", per Linear Foot <br /> 9 "12-inch Plastic Crosswalk Ladder Line", per Linear Foot <br /> 10 "24-inch Plastic Crosswalk Line", per Linear Foot <br /> 11 "24-inch Plastic Stop Line", per Linear Foot <br /> 12 "Plastic Sharrow Straight", per Each <br /> 13 "Plastic Right Turn Sharrow", per Each <br /> 14 "Plastic Left Turn Sharrow", per Each <br /> 15 "Plastic Jog Right Sharrow", per Each <br /> 16 "Plastic Jog Left Sharrow", per Each <br /> 17 "Plastic Sharrow Straight with brackets", per Each <br /> 18 "Plastic Sharrow Straight with green background", per Each I <br /> 19 "Plastic Left Turn Sharrow with green background", per Each <br /> 20 "Plastic Right Turn Sharrow with green background", per Each <br /> 21 "Plastic Bicycle Lane Symbol", per Each <br /> 22 "Plastic Bicycle Lane Symbol with green background", per Each <br /> 23 <br /> 24 <br /> 25 8-26 Polymer Cement Surfacing.docx <br /> 26 <br /> 27 8-26 POLYMER CEMENT SURFACING WITH HEXAGON PATTERN FOR GREEN <br /> 28 COLORED BICYCLE LANES <br /> 29 (...«.) <br /> 30 <br /> 31 Section 8-26 is vacant and is replaced by the following: <br /> 32 <br /> 33 8-26.1 Description <br /> 34 This work consists of installing a polymer cement surface system (PCSS) on a prepared <br /> 35 substrate in accordance with these specifications and with the plans established by the <br /> 36 engineer for the purposes of delineating dedicated or shared bicycle lanes. The resulting <br /> 37 surface shall be patterned with a hexagon pattern as required by the design plans. <br /> 38 <br /> 39 Approved materials shall have proven in-place history over asphalt and/or concrete and <br /> 40 should meet all the material properties and be installed in accordance with this <br /> 41 specification. <br /> 42 <br /> 43 8-26.2 Materials <br /> 44 <br /> 45 Material submitted for pre-approval shall meet the requirements of Sections 8-26.2.01. <br /> 46 The color shall be green and will comply with FHWA standards for daytime and <br /> 47 nighttime chromaticity values. <br /> 48 <br /> 49 a. The daytime chromaticity coordinates for the color used for green colored <br /> 50 pavement shall be as follows: <br /> I <br /> FLEMING BICYCLE CORRIDOR 76 <br /> PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.