Laserfiche WebLink
Interwest Construction Co.-Everett Contractor Yard Site Improvements,Everett,WA March 12,2021 <br /> Geotechnical Engineering Report P2184-T20 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Subgrade Observation and Compaction Testing: Regardless of material or location,all structural <br /> fill should be placed over firm, unyielding subgrades prepared in accordance with the Site <br /> I Preparation section of this report.The condition of all subgrades should be observed bygeotechnical <br /> eP P g <br /> personnel before filling or construction begins. Also, fill soil compaction should be verified by <br /> means of in-place density tests performed during fill placement so that adequacy of soil compaction <br /> efforts may be evaluated as earthwork progresses. <br /> Soil Moisture Considerations: The suitability of soils used for structural fill depends primarily on <br /> their grain-size distribution and moisture content when they are placed. As the"fines"content(that <br /> soil fraction passing the U.S.No.200 Sieve)increases,soils become more sensitive to small changes <br /> in moisture content. Soils containing more than about 5 percent fines (by weight) cannot be <br /> consistently compacted to a firm,unyielding condition when the moisture content is more than 2 <br /> I <br /> I <br /> I <br /> percentage points above or below optimum. For fill placement during wet-weather site work,we <br /> I recommend using"clean"fill,which refers to soils that have a fines content of 5percent or less <br /> (by <br /> weight)based on the soil fraction passing the U.S. No. 4 Sieve. <br /> 5.0 RECOMMENDED ADDITIONAL SERVICES <br /> Because the future performance and integrity of the structural elements will depend largely on <br /> proper site preparation, drainage, fill placement, and construction procedures, monitoring and <br /> testing by experienced geotechnical personnel should be considered an integral part of the <br /> construction process. Subsequently,we recommend that MGI be retained to provide the following <br /> I <br /> I <br /> post-report services: <br /> I .I <br /> Review all construction plans and specifications to verify that our design criteria presented <br /> in this report have been properly integrated into the design; <br /> I . Prepare a letter summarizing all review comments (if required); and <br /> 1 • <br /> Prepare a post-construction letter summarizing all field observations,inspections,and test <br /> results (if required). <br /> Migizi Group, Inc. Page 15 of 16 <br /> MIGIZI IIitil ,I <br />