Laserfiche WebLink
Interwest Construction,Co.-Everett Contractor Yard Site Improvements,Everett,WA March 12,2021 <br /> Geotechnical Engineering Report P2184-T20 <br /> 6.0 CLOSURE <br /> The conclusions acid recommendations presented in this report are based, in part, on the <br /> explorations that we observed for this study;therefore,i variations in the subgrade conditions are <br /> observed at a later time,we may need to modify this report to reflect those changes. Also,because <br /> the future performance and integrity of the project elements depend largely on proper initial site <br /> preparation, drainage, and construction procedures, monitoring and testing by experienced <br /> geotechnical personnel should be considered an integral part of the construction process. MGI is <br /> available to provide geotechnical monitoring of soils throughout construction. <br /> We appreciate the opportunity to be of service on this project. If you have any questions regarding <br /> this report or any aspects of the project, please feel free to contact our office. <br /> Respectfully submitted, <br /> MIGIZI GROUP, INC,. o $RIB <br /> Zach L.Logan James E.Brigham, P.E. <br /> 1 <br /> Senior Staff Geologist: Senior Principal Engineer <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I Migizi Group,Inc. Page 16 of 16 <br /> r.vGtri W <br />