Laserfiche WebLink
I <br /> I <br /> TABLE OF CONTENTS <br /> I <br /> IPage No. <br /> 1.0 SITE AND PROJECT DESCRIPTION 1 <br /> 2.0 EXPLORATORY METHODS 2 <br /> I2.1 Test Pit Procedures 2 <br /> 3.0 SITE CONDITIONS 3 <br /> I 3.1 Surface Conditions 3 <br /> 3.2 Soil Conditions 3 <br /> 3.3 Groundwater Conditions 4 <br /> I 3.4 Seismic Conditions 4 <br /> 3.5 Liquefaction Potential 5 <br /> 4.0 CONCLUSIONS AND RECOMMENDATIONS 6 <br /> 4.1 Site Preparation 7 <br /> 4.2 Subsurface Utilities 9 <br /> 4.2.1 Excavation Methods 9 <br /> 4.2.2 Open Cut Slopes 9 <br /> 4.2.3 Lateral Pressures on Shoring Walls 9 <br /> I 4.2.4 Pipe Bedding and Manhole Support 10 <br /> 4.2.5 Backfill 10 <br /> 4.3 Spread Footings 11 <br /> 4.4 Slab-On-Grade Floors 12 <br /> 4.5 Truck-Scale Pits and Concrete Wet Pond 13 <br /> 4.6 Asphalt Pavement 13 <br /> I4.7 Structural Fill 14 <br /> 5.0 RECOMMENDED ADDITIONAL SERVICES 15 <br /> :I 6.0 CLOSURE 16 <br /> List of Tables <br /> Table 1. Approximate Lcations and Depths of Explorations :Table2seismicDesigniar:meters <br /> .ListofFiguresFigure1. Topographcadocation Map <br /> Figure 2. Site and Exploration Plan <br /> APPENDIX A <br /> I <br /> Soil Classification Chart and Key to Test Data A-1 <br /> Log of Test Pit Explorations TP-1 through TP-4 A-2...AI <br /> -5 <br /> i <br />