My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 N BROADWAY REFINED COFFEE 2023-02-06
>
Address Records
>
N BROADWAY
>
902
>
REFINED COFFEE
>
902 N BROADWAY REFINED COFFEE 2023-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2023 8:34:19 AM
Creation date
2/6/2023 8:33:36 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
902
Tenant Name
REFINED COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Mr. Ge A Eim <br /> Plan Check Number: B1912-019, First Building Review <br /> January 24, 2020 <br /> 12. Details for an accessible restroom are provided in Elevation 2/A-6.0 and on Sheet A-8.0. See <br /> IBC Sections 107.2.1 and 1102.1. The following comments should be addressed: <br /> a. The elevation does not appear consistent with either the new Restroom 105 or the existing <br /> Restroom 103. For example, the water closet and sink are not located on the same wall in <br /> Restroom 105, and the relative position of the watercloset and sink in Restroom 103 is <br /> opposite of the elevation. The elevation should be referenced in the drawings and revised <br /> for consistency. <br /> b. The elevation shows the flush handle on the sidewall side of the watercloset. The handle <br /> should be located on the open side. See ICC A117.1-09 Section 604.6. <br /> c. Continuing with the previous comment, the flush handle for the existing watercloset in <br /> Restroom 103 should be relocated to the open side if not already located on this side. See <br /> IEBC Section 705.2. <br /> Miscellaneous: <br /> 13. Restrooms 103 and 105 on Floor Plan 1/A-2.0 are single-occupant compartments. The <br /> construction drawings should specify that the doors shall be provided with lockable hardware. <br /> See IBC Section 1210.3.1 Exception 1. <br /> 14. Exhaust fans should be specified in each of Restrooms 103 and 105 on Floor Plan 1/A-2.0. The <br /> fans should provide a minimum exhaust rate of 20 CFM continuously or 50 CFM intermittently <br /> per IMC Table 403.3.1.1. See IBC Section 1203.1. <br /> 15.The Kitchen may require the installation of a grease trap. These documents have not been <br /> reviewed for the treatment of oil or grease that may enter the City of Everett sewer system. <br /> Contact Industrial Pretreatment at (425)257-8240 regarding pretreatment or grease removal <br /> requirements. The drawings shall specify the requirement to install a grease trap if required. <br /> See Everett Municipal Code Chapter 14.42. <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Drew Martin, P.E., S.E. <br /> Associate Engineer/ Commercial Plans Examiner <br /> (425)257-8813 <br /> dmartin@everettwa.gov <br /> S:\BMartin\2019\B1912-019_R1.docx <br /> a <br /> 3200 Cedar Street 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 0 425.257.8857 fax everettwa.gov/permits <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.