Laserfiche WebLink
STEP 1. STEP 2. INSTALL WAVEGUIDE RUN FOR RFS MICROWAVE ANTENNA,AS LISTED IN THE ANTENNA SCHEDULE. ( SNO 911 <br /> ' SLOT FOR EXTEND THE WAVEGUIDE RUN INTO THE EQUIPMENT SHELTER AND TERMINATE THE WAVEGUIDE RUN DOTE <br /> DISTANCE BETWEEN TOWER GROUND BARS ADJUSTABLE ABOVE THE RACK DESIGNATED FOR THE A MICROWAVE RADIO EQUIPMENT.PROJECT MANAGER EXCEED <br /> GROUNDING CLAMP MUST NOT EXCEED 100'-0"-CONTRACTOR TO SNOHOMISH COUNTY <br /> BAND CLAMP WILL PROVIDE THE EQUIPMENT LOCATION,ALLOW FOR ADDITIONAL LENGTH.TERMINATE THE PLACE GROUND BARS AT THE TOP,THE <br /> WAVEGUIDE AT THE MICROWAVE ANTENNA AND CONNECT THE WAVEGUIDE DIRECTLY TO THE <br /> Ya'-20 HARDWARE ANTENNA MID-POINT AND THE BOTTOM OF THE TOWER 911 <br /> • GROUNDING STRAP ASSEMBLY #6GROUND LEADEVERETT WAVEGUIDE INSTALLATION NOTE 1121 SE SUITE 200 MALL WAY <br /> REMOVE CABLE --- ---- .— ,—....."... ..�...--.�.,",..._........_. EVERETT, WA 98208 <br /> INSULATION �����"�-�� <br /> 425.407.3911 <br /> STEP 3: STFP 4: <br /> III ELECTRICAE O VER <br /> TAP <br /> MASTIC TAPE <br /> m. PUTTY TAPE <br /> ._y <br /> MIL <br /> /EXISTING 2/0 ,\'``��� <br /> FLYING LEAD TO _` --; - <br /> I� BE CONNECTED k _�,_\ <br /> COAXIAL CABLE GROUNDING SCALE NTS 1 TO BUS BAR i� \ k \ �=\ <br /> 1 \ k _ 8v of s. <br /> V <br /> \ QJ@ <br /> n I \�\ \\\\ x------------- <br /> X i X X X / tL c° <br /> II U II _ II I I \ \ GROUND ANTENNA COAX WITH COAXIAL S p <br /> I 1 TI- -IT--? -f--1-- \ GROUNDING KIT PER MANUFACTURER'S <br /> I -. .¢nta. � . <br /> I \ \\\ INSTRUCTIONS,TYP I IGNALVO <br /> u 6 -i \ \\ \ x 2)S <br /> \ <br /> \ EX.TOWER GROUND RING I ! <br /> eh EX.GROUND BAR JUST ABOVE CABLE \ \ \ +„ THIS DRAWING IS THEIGHTED AND IS THE <br /> BRIDGE GROUN ALL COAX BEFORE \ \\ x II SOLE PROPERTY OF OWNER. IT IS <br /> ® \ \ PRODUCED SOLELY FOR USE BY THE OWNER <br /> TURNING TOWARDS THE SHELTER \ \\ • \\ I AND ITS AFFlUATES. REPRODUCTION OR USE <br /> \ OF THIS DRAWING AND/OR THE INFORMATION <br /> f <br /> aakalb, \ CONTAINEFOR W1OUTTHE <br /> \\ x WRITTENEOFOWN\I <br /> I I <br /> EX.TOWER/ANTENNA GROUND BAR / x 1 <br /> / I l <br /> ��i x 11 <br /> I NorthWest <br /> !I''\! <br /> Tower Engineering <br /> PPP.: <br /> x <br /> I <br /> xTYPE TA TYPE VN TYPE NC TYPE SS -RElEA9E - <br /> i I DATE <br /> J I �i' x I 26FEB21 PERMIT RENEW SET <br /> It) \it 23MAR21BUILDINGPERMITSET\\\ --_�// I <br /> + x <br /> TYPE VV TYPE VS TYPE VB TYPE PT x \\1 <br /> X X X X� ,_.X. X • X X X - X X - X --�X <br /> LJ f k <br /> ' eir <br /> r 'Nt <br /> '� 1 91E NAME <br /> TYPE GT TYPE GY TYPE OR TYPE GL NORTH CAMPUS ANTENNA ADDITION PROJECT <br /> CADWELD CONNECTION PRODUCTS SCALE: NTS 3 NORTH CAMPUS COMMUNICATION FACILITY <br /> p �Z SHE ADDRESS <br /> f/, bar 0 1121 SE EVERETT MALL WAY <br /> 7:!e _:`��i EVERETT, WA 98208 <br /> ✓ I <br /> BOLT GRND 2 BOI T PARAI I Fl UNIVERSAL PIPE MASTER GROUND BAR(MOB) <br /> ROD CLAMP aP_LLC,E 0 AMPS 75/1.25 ----- COPPER GROUND WIRE <br /> I Ilk rx4'x24"COPPER <br /> GROUND BAR(GB)Y'x4"x12' <br /> Mk Tr OR Y"z4"x20"COPPER 4 CADWELD <br /> �� V ~/ W X 10'COPPER CLAD <br /> STEEL GROUND ROD ■ MECHANICAL CONNECTION <br /> 2 HOLE LUG CAST 1-SPUCE CROSS RUN <br /> CLAMP WET 1111E <br /> UNIVER Al XIT GROUND ROD(LYNCOLE) O TEST WELL <br /> PIPE CI AMPS. GROUNDING PLAN <br /> ETA GROUNDING DETAILS <br /> `_% ' :�; lll,il.' NOTES: GROUNDING SYMBOLS ry <br /> SHEET M HER <br /> 1.DIAGRAM REPRESENTS IDEAL CONDITIONS.ADDITIONS OR UPGRADES MAY BE REQUIRED; <br /> "U"BOLT 1 BOI T PARALI FI 1 BOLT PARAI I FI VERIFY WITH CONSTRUCTION MANAGER. <br /> PIPE CLAMP CI AMP CLAMP <br /> G—1 <br /> MECHANICAL CONNECTIONS SCALE: NTS 4 GROUNDING PLAN ° �-16 SCALE: 16'= 1'-O' 120 PLOT SCALE: 1:1 0 24"x36% 1:2 0 n'x17' <br /> C\110 <br />