Laserfiche WebLink
ig tang, otor an• ectrica -equirements 1st, pg 11 o 11 <br /> 20181NSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by©2022 NEEA,All rights reserved <br /> The following information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> Page 11/11 <br />