Laserfiche WebLink
ig ling, otor an• ectrica 'equirements ist, pg 1 I o 11 <br /> 2018'WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by©2022 NEEA,All rights reserved <br /> The following information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> � <br /> C405.9.3 I Regenerative drive Indicate all one-way down of reversible i <br /> 1 escalators are provided with a variable <br /> i frequency regenerative drive <br /> j DOCUMENTATION AND SYSTEM REQUIREMENTS TO SUPPORT COMMISSIONING(CX) <br /> NO C408.4 Scope of electrical Indicate that all electrical systems general switching <br /> power and lighting (receptacles,transformers,motors,vertical shown-final switching <br /> systems and horizontal transportation)for which the by electrical ' <br /> commissioning WSEC requires control functions and/or contractor under their <br /> configuration to perform specific functions permit <br /> are required to be commissioned <br /> NO I Where total building lighting load is>20 kW, general switching <br /> or where total lighting load of luminaires shown-final switching <br /> requiring daylight sensing and/or occupancy by electrical <br /> control>10 kW,indicate that all automatic contractor under their <br /> lighting control systems are required to be permit <br /> commissioned;or provide building lighting <br /> power calculation demonstrating eligibility for <br /> exception <br /> NO C405.13 Commissioning Indicate Cx requirements in plans and general switching <br /> C408.1.1 requirements in specifications for all applicable electrical and shown-final switching <br /> C408.1.2 construction lighting control systems per C408 by electrical <br /> C408.1.4.2 documents contractor under their <br /> C103.6.3 permit <br /> NO C408.1.2 Commissioning Include general summary of Cx plan per general switching <br /> C408.1.2.1 requirements in C408.1.2 including:1)Narrative description shown-final switching <br /> C408.1.4 construction of activities;2)Responsibilities of the Cx by electrical <br /> C103.6.3 documents team;3)Schedule of activities including contractor under their <br /> verification of project close out permit <br /> documentation per C103.6;4)Conflict of <br /> interest plan(if required) <br /> NO C408.1.2 Commissioning Include in general summary that a Cx project general switching <br /> C408.1.4 requirements in report and Compliance Checklist(Figure shown-final switching <br /> C103.6.3 construction C408.1.4.1)shall be completed by the by electrical <br /> documents Certified Cx Professional and provided to the contractor under their <br /> owner prior to the final electrical inspection permit <br /> NO C408.4.1 Functional Identify in plans and specifications the general switching <br /> performance testing intended operation of all equipment and shown-final switching <br /> criteria controls during all modes of operation, by electrical <br /> including interfacing between new and contractor under their <br /> existing-to-remain systems permit <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> NO C103.6.3 Project close out Indicate in plans that project close out general switching <br /> documentation documentation is required including WSEC shown-final switching <br /> requirements lighting compliance reports that document all by electrical <br /> interior and exterior lighting area and/or contractor under their <br /> surface types,lighting power allowances and permit <br /> installed densities <br /> If"no"is selected for any question,provide explanation. <br /> Page 10/11 <br />