My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Davey Resource Group, Inc. 11/28/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Davey Resource Group, Inc. 11/28/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 10:59:47 AM
Creation date
2/8/2023 12:02:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Davey Resource Group, Inc.
Approval Date
11/28/2022
End Date
12/18/2033
Department
Information Technology
Department Project Manager
Kim Moore
Subject / Project Title
RFP 2022-061 Tree Inventory Report & Software
Tracking Number
2022-061
Total Compensation
$784,580.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
Yes
Document Relationships
Davey Resource Group, Inc 9/10/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 20 of 31 <br />SECTION 4 – PROPOSAL SUBMITTAL REQUIREMENTS <br />4.1 SUBMITTAL REQUIREMENTS <br />Suppliers must provide a proposal which must demonstrate an understanding of the project requirements <br />as stated throughout this Request for Proposal. <br />Proposals in response to this RFP must be submitted in the order specified below. Proposal responses <br />must include: <br />1. Supplier Commitment and Information (included) <br />2. Price Sheet (included) <br />3. Narrative responses to the questions asked. Suppliers should re-type the heading, question <br />identifier and question. Then answer the questions and provide in the same order requested below. <br />Suppliers may emphasize in their narrative any areas of their proposal that they believe exceed our <br />requirements. <br />4. Certificate of Non-Debarment/Suspension (included) <br />5. Washington State Department of Natural Resources Clauses (included) <br />6. ARPA Clauses and Certifications (included) <br />4.2 SUGGESTED RESPONSE FORMAT <br />• Standard 8 1/2" x 11" paper <br />• Single or double sided, numbered pages <br />• Typed with a minimum of 12-point font <br />• Form 4.03 – re-type the question before responding <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.