Laserfiche WebLink
1 <br /> the culverted Dogwood Elm Creek flowing under the project site.After flowing under the project <br /> site, the culverted creek daylights northwest of the site.The runoff eventually outfalls to Possession <br /> Sound. See downstream analysis section of this report for more details. <br /> Mukilteo/Elm Basin: Drainage from portions of Mukilteo Boulevard and Elm Street is conveyed <br /> Ithrough catch basins and closed conveyance pipes to the basin's connection point to the existing <br /> municipal conveyance system at an existing stormwater manhole on the southeast corner of the <br /> project site where it converges with the culverted Dogwood Elm Creek flowing under the project <br /> Isite. After flowing under the project site, the culverted creek daylights northwest of the site.The <br /> runoff eventually outfalls to Possession Sound. See downstream analysis section of this report for <br /> more details. <br /> North Basin: Drainage from the northern portion of project site (North Basin) is conveyed through <br /> I catch basins and closed conveyance pipes to the basin's connection to the culverted Dogwood Elm <br /> Creek at the manhole in the middle of the eastern parking lot. The stormwater runoff combines <br /> with the runoff from the southern portion of the project site in the culverted creek and is conveyed <br /> I northwest of the project site where it daylights. See downstream analysis section of this report for <br /> more details. <br /> I Olympic Basin: Off-site runoff from Olympic Boulevard to the east enters the project site from <br /> the roadway as seen in Figure 5. As it traverses westerly across the property, it combines with the <br /> runoff from the southern and northern on-site basins at the existing culverted creek under the <br /> I project site as described above.This off-site conveyance system will be rerouted to be collected in <br /> the existing Olympic Boulevard system as described in the Proposed Conditions below. <br /> IPROPOSED CONDITIONS <br /> The proposed project will consist of a two-story+/-29,066 sf outpatient medical clinic, a <br /> Ireconfigured surface parking lot, landscaping improvements, and associated underground utilities. <br /> Main access to the site will be provided by two driveways, one off of Mukilteo Boulevard and the <br /> I second off of Olympic Boulevard. An additional service access will be provided off Elm Street to a <br /> parking lot in the northwest corner of the site. Anticipated frontage improvements include adding <br /> or replacing curb and gutter and sidewalk on the Elm Street, Mukilteo Boulevard, and Olympic <br /> IIBoulevard frontages. See Figure 6 below for the proposed conditions map. <br /> I <br /> I <br /> I <br /> NAVIX Everett VA Clinic— Everett, WA 17 <br />