Laserfiche WebLink
► <br /> I <br /> The site is bound by apartment buildings to the north, Elm Street to the west, Olympic Boulevard to <br /> I <br /> the east, and W Mukilteo Boulevard to the south with a gas station occupying the southeast corner <br /> of the lot. It is zoned B-2, Community Business. The surrounding zoning is B-2 to the south and east, I <br /> R-1 to the west, and R-3 to the north. <br /> Per the Geotechnical Engineering Report by Terracon, dated May 15, 2020, existing fill wasI <br /> observed at the exploration locations to depths of 6 to 15 feet below ground surface (bgs); loose to <br /> medium dense sand silt to about 15 bgs; and very stiff to hard sand with silt below about 15 bgs. <br /> The groundwater table ranges from approximately 5 to 10 feet bgs. I <br /> EXISTING STORMWATER RUNOFF <br /> The project site is divided into two on-site storm drainage sub-basins and two off-site tributary sub- I <br /> basins as shown in Figure 5 below. Please see further below for a general description of the two on- <br /> site basins and the off-site tributary basins. <br /> (kJ .....- <br /> -----j f., ,e ' / -, - <br /> -1/(5P/ ,.---‘----. I <br /> EXISTING BASINS 1 /�r.�/� 1: <br /> 105,741 SF (2.42 ACRES) ` / <br /> SOUTH BASIN ,7 f <br /> 34.951 SF (0.80 ACRES) ;,-�'.. �� <br /> 1 ', 1' ,,', § I <br /> NORTH BASIN 3,, ' - /_ 4, ,; <br /> 63,496 SF (1.45) ACRES) .��, � I <br /> OLYMPIC BASIN: / /, 1 <br /> 2,928 SF (0.07 ACRES) 4 �w <br /> MUKILTEO/ELM BASIN: �, f <br /> 4,366 SF (0.10 ACRES) .. 111 <br /> \, -tr . <br /> - � , . tot,. <br /> ti 7LO IV" <br /> y <br /> Figure 5: Existing Sub-Basins Map <br /> I <br /> South Basin: Drainage from the southern portion of project site (South Basin) is conveyed through I <br /> catch basins and closed conveyance pipes to the basin's connection point to the existing municipal <br /> conveyance system in Elm Street. From there, the stormwater runoff flows southerly to the <br /> intersection of Elm Street and Mukilteo Boulevard. The runoff is then conveyed easterly to an <br /> existing stormwater manhole on the southeast corner of the project site where it converges with <br /> I <br /> NAVIX Everett VA Clinic— Everett, WA 16 <br /> I <br />