Laserfiche WebLink
Below is a description of each of the site drainage sub-basins. <br /> East Basin Conveyance System <br /> Photo Description <br /> ''' View from NE corner of <br /> site looking southwest. <br /> ,.�.� ------ Drainage from the <br /> _ A pr ,,`" -' eastern basin of the <br /> 1 di`�' project site is captured in <br /> ,...4 - the drive aisle east of the <br /> building and conveyed <br /> through pipes to the <br /> existing culverted creek. <br /> 4. • <br /> o ,r• . <br /> lr <br /> • <br /> r _ View from Olympic <br /> 6 Boulevard looking north. <br /> ,. Drainage from the west <br /> 2fikki° <br /> �.. <br /> side of Olympic <br /> Boulevard currently <br /> drains east onto the <br /> project site. <br /> 1 <br /> I <br /> NAVIX Everett VA Clinic- Everett, WA 24 <br /> I <br />