Laserfiche WebLink
I <br /> IDRAINAGE BASIN, SUBBASINS, AND SITE CHARACTERISTICS <br /> IDRAINAGE BASIN <br /> The project site is located within the Pigeon Creek No.1 drainage basin. There are no special <br /> stormwater management requirements for this drainage basin. See Figure 2 below for a map of the <br /> Idrainage basin. <br /> SUBBASINS <br /> IThere are two subbasins and one offsite tributary basin present in the existing conditions. See Pre- <br /> Development Stormwater Runoff section below. <br /> 1 '_ T <br /> a Z / <br /> i Pactec Ave <br /> a' <br /> IHnk'vo in- z <br /> q ISth St <br /> I ( <br /> g B,vy <br /> Ct .r ` ' slit 5t <br /> II <br /> PROJECT �u�s�� � \) <br /> SITE Frv.s:Parr r 's <br /> 11 <br /> d tlarberv+� Elm 4 $ <br /> 4 Pan ASssl <br /> Park Lomeli Park / <br /> I O. Johnston / <br /> K.Ily Park <br /> n <br /> o / <br /> IDow oDowPart �, Dninaee Basinr.PIGEON CR NO.1 , <br /> ;A:,M P:GEOy CF NO: tnor St — --e <br /> 4,. ManruDro � Rotary Park <br /> Park r'„ Area Deilera: eparate.Are3 <br /> Morro Gast SSSte' t�6 <br /> z <br /> 3,t t'_:.re bo\n aoX W OOID—to <br /> 7 � <br /> Mrtrl MMt1I Cr.. Pecks 0r s�4 _ <br /> ,Ia <br /> I 5 <br /> ICol say Para <br /> a aMadhoh St Mtsnrrrwn <br /> I 1 Park <br /> PM*sensor r <br /> BartlMas O •I <br /> y 7 1.01 .> <br /> I a a <br /> 7S1R C!O4 75.h CA cc <br /> Figure 2: Drainage Basin Map <br /> I <br /> 1 <br /> NAVIX Everett VA Clinic— Everett, WA 5 <br /> I <br />