Laserfiche WebLink
MINIMUM REQUIREMENTS SUMMARY <br /> IMinimum requirements for the proposed project have been determined as shown Figures 2.4.1 and <br /> 2.4.2 from the 2019 Manual below. <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 111 <br /> Figure 1-3.1: Flow Chart for Determining Requirements for New <br /> Development <br /> Start Here <br /> 1 <br /> Ooes the Site have 35% Thresholds and the Figure'lbw <br /> or more of existing hardSee Redevelopment Project <br /> • <br /> Chart <br /> C71 <br /> surface coverage? Requdrs rrwnts <br /> No <br /> = Does the Project oonvert'Y4 tcy.Determining <br /> acres or more of vegetation to <br /> Does the Project resuh in lawn or landscaped areas,or <br /> 5,000 square feet,or NO convert 2.5 acres or more of <br /> greater,of new phis native vegetation to pasture? <br /> replaced hard surface <br /> area? <br /> Yoe <br /> Yes 10 <br /> Does the Project result i 2,000 <br /> \PM <br /> * square bet.or greater,of new plus <br /> All Minimum Requirements replaced hard surface arse? <br /> apply to the new and replaced <br /> herd surfaces and converted <br /> vegetation areas. <br /> YD: <br /> • <br /> Does the Project have lend <br /> No <br /> Minimum Requirements ti'1 disturbing activities of 7,000 <br /> through fill apply to the new q Ye3 square feet or greeter? <br /> and replaced hard surfaces <br /> and the land disturbed NO <br /> Minimum Requirement 02 <br /> applies. <br /> Flow Chart for Determining Requirements for <br /> New Development <br /> DEPARTMENT OF Revised March 2010 <br /> ECOLOGY Pi.a..«.hapiNsateaswoomtopyrighthimiox coprgl+t notlo,inowanp„minions, <br /> State of Washington Mnffhtion he illibillY.and disdsinw- <br /> NAVIX Everett VA Clinic— Everett, WA 7 <br />