Laserfiche WebLink
Contractor: Northwest Construction <br />Project: Port of Everett Combined Sewer Main Improvements <br />W.O.# UP3768 <br />Notice to Proceed <br />75% Completion <br />Substantial Completion <br />Substantial Completion of work achieved within <br />1/31/2022 <br />5/23/2022 <br />6/30/2022 <br />150 <br />Reviewed By Keith Alewine Keith Alewine Keith Alewine <br />Date 3/9/2022 4/1/2022 5/10/2022 <br />Keith Alewine <br />8/23/2022 <br />Est 1 1 Est 2 <br />Est 3 <br />Est 4 <br />Est 5 <br />Est 6 <br />Est 7 <br />Est 8 <br />Est 9 <br />Est 10 <br />Schedule <br />ITEM <br /># <br />ITEM <br />DESCRIPTION <br />UNIT <br />CONTRACT <br />QUANTITY <br />QUANTITY <br />TOTAL <br />L3/4/2022 <br />_ <br />/30/2022 <br />�.6J.����/ .�n:��. <br />8/19/202Z <br />Dat <br />�; <br />Date10 <br />A <br />1 <br />Mobilization <br />LS <br />1.00 <br />1.0000 <br />0.5000 <br />0.5000 <br />0.0000 <br />0.0000 <br />0.0000 <br />A <br />2 <br />Surveying <br />LS <br />1.00 <br />1.0000 <br />0.0000 <br />0.0000 <br />0.3800 <br />0.4700 <br />0.1500 <br />A <br />3 <br />S <br />P <br />CC <br />Plan <br />LS <br />1.00 <br />1.0000 <br />1.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />A <br />4 <br />Force <br />Account <br />FA <br />100,000.00 <br />32,858.4600 <br />0.0000 <br />0.0000 <br />2,935.1900 <br />15,575.1100 <br />14,348.1600 <br />A <br />5 <br />Removal <br />of <br />Structures <br />and <br />Obstructions <br />TON <br />100.00 <br />2,296.5800 <br />0.0000 <br />229.6100 <br />1,123.1200 <br />0.0000 <br />943.8500 <br />A <br />6 <br />Structure <br />Excavation <br />and <br />Stockpiling, <br />Incl. <br />Haul <br />CY <br />14,900.00 <br />11,515.4000 <br />0.0000 <br />0.0000 <br />3,995.0000 <br />7,301.7000 <br />218.7000 <br />A <br />7 <br />-_ <br />Clean <br />Haul <br />Fill <br />and <br />Native <br />Exc., <br />Backfill, <br />and <br />Compaction, <br />Incl. <br />CY <br />3,200.00 <br />2,881.6000 <br />0.0000 <br />0.0000 <br />1,001.5000 <br />1,825.5000 <br />54.6000 <br />A <br />8 <br />Select <br />Borrow, <br />Incl. <br />Haul <br />TON <br />17,710.00 <br />24,830.5400 <br />0.0000 <br />2,852.5700 <br />5,444.0200 <br />0.0000 <br />16,533.9500 <br />A <br />9 <br />Gravel <br />Backfill <br />for <br />Pipe <br />Zone <br />Bedding, <br />Incl. <br />Haul <br />TON <br />9,110.00 <br />7,680.7900 <br />0.0000 <br />494.8600 <br />2,421.8800 <br />4,764.0500 <br />0.0000 <br />A <br />10 <br />Remove <br />Unsuitable <br />Pipe <br />Foundation <br />Material <br />CY <br />500.00 <br />242.2400 <br />0.0000 <br />0.0000 <br />0.0000 <br />_ <br />121.1200 <br />121.1200 <br />A <br />11 <br />Replace <br />Unsuitable <br />Pipe <br />Foundation <br />Material <br />TON <br />900.00 <br />526.1600 <br />0.0000 <br />0.0000 <br />90.1200 <br />436.0400 <br />0.0000 <br />A <br />12 <br />Disposal <br />of <br />Inert <br />Fill <br />and <br />Debris, <br />Including <br />Haul <br />CY <br />14,600.00 <br />11,012.7000 <br />0.0000 <br />0.0000 <br />1,230.5300 <br />0.0000 <br />9,782.1700 <br />A <br />13 <br />pecial <br />Industial <br />Waste <br />TON <br />450.00 <br />7,962.9201 <br />0.0000 <br />0.0000 <br />4,380.8100 <br />416.3701 <br />3,165.7400 <br />A <br />14 <br />Hazardous <br />Waste <br />Disposal <br />FA <br />50,000.00 <br />1,517.6000 <br />0.0000 <br />0.0000 <br />0.0000 <br />1,517.6000 <br />_ <br />0.0000 <br />A <br />15 <br />Health <br />and <br />Safety <br />Plan <br />LS <br />1.00 <br />1.0000 <br />0.4000 <br />0.2000 <br />0.0000 <br />0.0300 <br />0.3700 <br />A <br />16 <br />Gravel <br />Pad <br />Construction <br />SY <br />1,350.00 <br />1,350.0000 <br />0.0000 <br />0.0000 <br />1,350.0000 <br />0.0000 <br />0.0000 <br />A <br />17 <br />Trench <br />Cutoff <br />Wall <br />EA <br />1.00 <br />1.0000 <br />0.0000 <br />0.0000 <br />1.0000 <br />0.0000 <br />0.0000 <br />A <br />18 <br />Decommission <br />Monitoring <br />Well <br />_ <br />EA <br />5.00 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />A <br />19 <br />Manhole <br />72-In. <br />Diam. <br />Type <br />3 <br />EA <br />6.00 <br />6.0000 <br />0.0000 <br />0.0000 <br />3.0000 <br />3.0000 <br />0.0000 <br />A <br />20 <br />Air <br />Vacuum <br />Valve <br />Assembly, <br />2-In. <br />EA <br />1.00 <br />1.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />1.0000 <br />0.0000 <br />A <br />21 <br />LS <br />1.00 <br />1.0000 <br />0.0000 <br />0.0000 <br />0.3800 <br />0.0300 <br />0.5900 <br />Trench <br />Excavation <br />Safety <br />Systems <br />A <br />22 <br />PVC <br />Sanitary <br />Sewer <br />Pipe, <br />12 <br />In. <br />Diam. <br />LF <br />2,300.00 <br />2,307.0000 <br />0.0000 <br />14.0000 <br />893.0000 <br />0.0000 <br />1,400.0000 <br />A <br />23 <br />FFRP <br />Sanitary <br />Sewer <br />Pipe, <br />42 <br />In. <br />Diam. <br />LF <br />2,270.00 <br />2,270.0000 <br />0.0000 <br />20.0000 <br />850.0000 <br />0.0000 <br />1,400.0000 <br />A <br />24 <br />Not <br />Used <br />_ <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />A <br />25 <br />Trench <br />Dewatering <br />LS <br />1.00 <br />1.0000 <br />0.0000 <br />0.2500 <br />0.1300 <br />0.0000 <br />0.6200 <br />A <br />26 <br />Temporary <br />Erosion <br />and <br />Sediment <br />Control <br />Plan <br />LS <br />1.00 <br />_ <br />1.0000 <br />0.0000 <br />1.0000 <br />_ <br />0.0000 <br />0.0000 <br />0.0000 <br />A <br />27 <br />Erosion <br />and <br />Sediment <br />Control <br />Lead <br />LS <br />1.00 <br />1.0000 <br />0.0000 <br />0.2000 <br />0.1800 <br />0.6200 <br />0.0000 <br />A <br />28 <br />Erosion/Water <br />Pollution <br />Control <br />FA <br />21,000.00 <br />19,139.9900 <br />0.0000 <br />4,559.4800 <br />6,068.0500 <br />8,512.4600 <br />0.0000 <br />A <br />29 <br />Chain <br />Link <br />Fence <br />6 <br />Ft. <br />Tall <br />LF <br />50.00 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />- <br />A <br />30 <br />Baseline <br />Covid <br />Requirements <br />LS <br />1.00 <br />1.0000 <br />0.2000 <br />0.2000 <br />0.0000 <br />0.6000 <br />0.0000 <br />A <br />100 <br />Provide <br />and <br />Install <br />12-Inch <br />PVC <br />Sewer <br />Main <br />Pipe <br />Restraints <br />EA <br />26.00 <br />_ <br />_ <br />26.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />26.0000 <br />A <br />101 <br />Provide <br />and <br />Install <br />Tensar <br />TX7 <br />Geogrid <br />at <br />Gravel <br />Pad <br />SY <br />1,350.00 <br />1,350.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />1,350.0000 <br />A <br />102 <br />Contaminated <br />Water <br />Treatment <br />LS <br />1.00 <br />1.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />1.0000 <br />A <br />103 <br />Encase <br />42"x42"x24" <br />Tee <br />in <br />Concrete <br />LS <br />1.00 <br />1.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />1.0000 <br />A <br />104 <br />Manhole <br />#6 <br />Lid <br />Replacement <br />LS <br />1.00 <br />1.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />1.0000 <br />A <br />105 <br />Crushed <br />Surfacing <br />Base <br />Course <br />TON <br />277.00 <br />277.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />0.0000 <br />277.0000 <br />