Laserfiche WebLink
E EVERETT <br />Project title: Call for bids for the WPCF TFI Bar Screen Upgrades Project <br />City Council Agenda Item Cover Sheet <br />Council Bill # <br />Agenda dates requested: <br />02/08/23 <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />x No <br />Budget amendment: <br />Yes x No <br />PowerPoint presentation: <br />Yes x No <br />Attachments: <br />Department(s) involved: <br />Public Works <br />Contact person: <br />John Nottingham <br />Phone number: <br />425.257.8844 <br />Email: <br />inottingharn@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br />Administration <br />Council President <br />Consideration: Call for Bids <br />Water Pollution Control Facility —Trickling Filter Influent Bar Screen <br />Upgrades <br />Project: <br />Partner/Supplier: None <br />Location: Water Pollution Control Facility <br />Preceding action: Ordinance 3824-21 approved 10/6/21 <br />Fund: Fund 336 — Water & Sewer System Improvements Fund <br />Fiscal summary statement: <br />The programmed available funding, as established by Ordinance No. 3824-21, is <br />$2,000,000.00. <br />Project summary statement: <br />Staff requests authorization to call for bids for the Water Pollution Control Facility <br />(WPCF) Trickling Filter Influent (TFI) Bar Screen Upgrades project. <br />The TFI Bar Screen vault serves two purposes. The east chamber houses a mechanical <br />bar screen to remove debris from the trickling filter influent coming from the aerated <br />lagoons. The west chamber is used as a critical flow control structure which diverts a <br />portion of the secondary clarifier effluent back to the aerated lagoons. <br />The design has been completed for upgrades to the existing vault including the creation <br />of a bypass around the existing bar screen chamber to accommodate maintenance <br />without shutting the mechanical plant down, and modifications to the effluent diversion <br />chamber to provide improved reliability of the diversion controls. <br />The Engineers estimate for construction of this project is $1,700,000. <br />Recommendation (exact action requested of Council): <br />Authorize a Call for Bids for the completion of the WPCF TFI Bar Screen Upgrades <br />project. <br />