My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 7 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> omission has been made,then he or she will determine the corrective actions and advise the Contractor <br /> accordingly. If the corrective work associated with an error or omission significantly increases or <br /> decreases the amount of Work called for in the Contract,the Owner will issue an appropriate Change <br /> Order. After discovery by the Contractor of an error or omission,related work performed by the <br /> Contractor shall be done at its risk unless authorized by the Owner's Representative and approved by the <br /> Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br /> manifestly necessary to carry out the intent of the Drawings and Specifications,or that are customarily <br /> performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the <br /> Work,but they shall be performed as if fully and correctly set forth and described in the Drawings and <br /> Specifications. <br /> 2.3.2. Conflicting Provisions <br /> ' Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br /> general drawings. In the event an item of Work is described differently in two or more locations on the <br /> Drawings and in the Specifications,the Contractor shall,upon request of the Owner's Representative, <br /> submit in writing to the Owner's Representative the description upon which the Contractor relied in <br /> preparing its Bid or laying out the Work. If the Owner's Representative directs the Contractor to perform <br /> Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br /> Work, Change Order procedures will be followed. In this event,the Contractor shall submit to the <br /> Owner's Representative such supporting information,including bidding or layout documents, as may <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract Sum is <br /> increased,decreased or unchanged by the Change Order. <br /> 2.3.3. Utilities <br /> 2.3.3.1 General <br /> The Owner has endeavored to determine the existence of utilities at the Site of the Work from the records <br /> of the owners of known utilities in the vicinity of the Work. The positions of these utilities as derived <br /> from such records are shown on the Drawings. No excavations were made to verify the locations shown <br /> for underground utilities. The service connections to these utilities are not shown on the Drawings. It <br /> shall be the responsibility of the Contractor to determine the exact location of utilities and service <br /> connections thereto. Such field verification must be performed in sufficient time so as not to impede the <br /> ' progress of the Work or fabrication of materials to be incorporated into the Work. The Contractor shall <br /> call the Utility Location Request Center(one call center) for location of utilities in the field not less than <br /> two (2)nor more than(10)ten business days before the scheduled date of commencement of excavation. <br /> The Contractor shall make its own investigations,including exploratory excavations,to determine the <br /> locations and type of existing utilities,including service connections,prior to commencing work that <br /> could result in damage to such utilities. The Contractor shall immediately notify the Owner's <br /> Representative as to any utility discovered by him in a different position than shown on the Drawings or <br /> which is not shown on the Drawings. No excavation shall begin until all known facilities in the <br /> excavation areas have been marked. Contractor shall coordinate its activities with the utility provider. <br /> Contractor shall bear the cost of maintaining utility service. <br /> The Contractor should be aware of, and comply with, Chapter 19.122 RCW,a law relating to <br /> underground utilities. The Owner shall not pay Contractor any of Contractor's cost of complying with <br /> this law,or repairing or indemnifying any damage or injury arising out of Contractor's failure to comply <br /> with this law. <br /> Owner does not represent or warrant who may be obligated to pay for the cost of relocation or temporary <br /> maintenance of the utility. Contractor shall investigate whether such cost must be borne by the owner of <br /> the utility. <br /> Governmental agencies and owners of utilities reserve the right to enter upon streets, alleys,rights-of- <br /> way, or easements for the purpose of making changes in their property made necessary by the Work and <br /> for the purpose of maintaining and making repairs to their property. <br /> t00 7200 - 7 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.