My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 8 1 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> 2.3.3.2 Known Utilities <br /> The Contractor shall provide at its sole expense all labor,equipment,materials and services necessary to <br /> remove,relocate,or maintain utilities specified on the Drawings. The work on each utility shall be <br /> performed in a manner satisfactory to the utility owner. The utility owner has the option of doing such <br /> work with its own forces at the Contractor's expense, or permitting the work to be performed by the <br /> Contractor. I <br /> 2.3.3.3 Service Connections <br /> Locations of service connections are not identified on the Drawings. The Contractor shall provide at its <br /> sole expense all labor, equipment and material to remove,relocate or maintain service connections. Work <br /> on service connections shall be performed in a manner satisfactory to the service connection owner. The <br /> service connection owner has the option of doing such work with its own force at the Contractor's <br /> expense, or permitting the work to be performed by the Contractor. <br /> 2.3.3.4 Unknown Utilities <br /> When a utility interferes with the Work and is either(1)not identified on the Drawings or(2)located in a <br /> position significantly different from that specified on the Drawings, Contractor shall follow the <br /> procedures of ARTICLE 11.DIFFERING SITE CONDITIONS. Interference with the Work is <br /> defined as a utility that crosses or projects into the plane of the Work at an elevation between the top and <br /> bottom of the Work. If it is necessary to remove,relocate, or temporarily maintain the utility,that work <br /> shall be included in a Change Order. The utility owner has the option of doing such work or permitting <br /> the work to be performed by the Contractor. In either case,the cost of the work incurred by or charged to <br /> the Contractor will be included in a Change Order. , <br /> 2.4. SUBMITTALS <br /> Where required by the Contract Documents,the Contractor shall submit information which will enable , <br /> the Owner's Representative to advise the Owner whether the Contractor's proposed materials,Equipment <br /> or methods of work are in general conformance to the design concept and in compliance with the <br /> Drawings and Specifications, such as catalog cuts and shop,working or detail drawings. In its <br /> Submittals,the Contractor shall expressly and explicitly notify the Owner's Representative of any and all <br /> deviations from the Specifications.Without express and explicit Notice of a deviation from the Contract <br /> requirements, approval of a Submittal does not relieve Contractor from complying with Contract <br /> requirements. The Owner's approval of a Submittal does not constitute a waiver of the Contract <br /> requirements. The Owner or Owner's Representative shall respond to a Submittal within thirty(30) days <br /> of receipt. The Owner or Owner's Representative may extend this time for good cause by notifying the <br /> Contractor. The Owner will not be obligated to accept or pay for Work performed by the Contractor that <br /> may be affected by materials,Equipment, or methods of work not submitted in a timely manner so that <br /> final review can be accomplished before the affected Work is complete. The Owner shall not be <br /> responsible for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part by <br /> Contractor's failure to submit required information in sufficient time for review, comment, and <br /> correction. Contractor's failure to submit required information in sufficient time for review, comment <br /> and correction shall be deemed a waiver of any and all Contract Claims for adjustment of Contract Sum I <br /> or Contract Time arising out of,or related to, such a Submittal. Contractor acknowledges and agrees that <br /> it may not rely upon receiving the Owner's response to a Submittal in less than thirty(30) days,unless the <br /> Owner explicitly changes this section by a signed Change Order. Requests for information or <br /> clarification from the Contractor to the Owner shall be treated as a Submittal. <br /> 2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br /> The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br /> full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> 1 <br /> 00 7200 - 8 GENERAL CONDITIONS 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.