Laserfiche WebLink
City of Everett 00 7200 - 45 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> v. Overhead(general and administrative). <br /> vi. Subcontractor's contract claims (in the same level of detail as specified herein is <br /> ' required for all Subcontractor's contract claims); and <br /> vii. Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the following <br /> language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> 1 <br /> ' (name) (title) <br /> of <br /> ' (company) <br /> hereby certifies that the Contract Claim for an adjustment to the Contract Sum and/or <br /> Contract Time,if any,made herein for Work on this Contract is a true and complete <br /> statement of the factual basis of the Contract Claim and all actual costs incurred and time <br /> sought, and is fully documented and supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> 1 Notary Public <br /> My Commission Expires: <br /> 12.3 FALSE OR OMITTED INFORMATION <br /> The Contractor waives each Contract Claim for which it presents material information that it knows, or in <br /> the exercise of reasonable care should know, is false,or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees <br /> and expenses incurred in investigating any such Contract Claim. <br /> 12.4 REMEDIES <br /> 12.4.1 General <br /> If a Contract Claim has merit in whole or in part,then Contractor's sole remedies shall be those provided <br /> in this subsection. Contractor must timely and strictly comply with the requirements of 10.NOTICE TO <br /> OWNER, 11.DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and all other General <br /> Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to <br /> 5.2.2.2 Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of <br /> the Contract Claim. <br /> 12.4.2 Extra Work <br /> 12.4.2.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work,the adjustment shall <br /> be calculated and paid as provided in 9.5.ADJUSTMENT OF CONTRACT SUM. This amount <br /> includes jobsite and home office Overheads for such Work,including any schedule delays relating to such <br /> Work. Therefore,no compensation in addition to that provided in 9.6.FORCE ACCOUNT shall be <br /> paid for such things as extended Overhead or other costs or damages. <br /> 00 7200 - 45 GENERAL CONDITIONS <br />