Laserfiche WebLink
City of Everett 01 1100 - 1 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> SECTION 01 1100 - SUMMARY OF WORK <br /> 1.1 WORK COVERED BY THIS CONTRACT <br /> IA. Water Pollution Control Facility (WPCF) <br /> I 1. The City of Everett owns a Water Pollution Control Facility (WPCF) located <br /> near Everett, WA. The City is seeking a Contractor to dredge, dewater, and <br /> place for storage submerged solids within the operation ponds at the <br /> I WPCF. Approximately 2,000 dry tons of biosolids will be removed from the <br /> Recirculation Channel at this facility. <br /> 2. The Water Pollution Control Facility is located at 4027 4th Street Southeast, <br /> IEverett, WA. The solids removed from the Recirculation Channel at the <br /> WPCF will be placed on the adjacent City's Biosolids Pad for future use. <br /> The Contractor must conduct their operations and manage the dewatered <br /> I biosolids on the City's Biosolids Pad. See site map in Appendix A. <br /> 3. The successful bidder shall be solely responsible for providing all <br /> equipment, labor, tools and supplies necessary to successfully dredge, <br /> Idewater, temporarily store, and transport the biosolids to the designated <br /> location on the City's Biosolids Pad in accordance with the terms of this <br /> Contract. <br /> IB. The successful bidder shall keep accurate records of all transactions connected <br /> to this Contract and provide them to the City's representative. This shall include <br /> Ibut not be limited to correspondence, invoices, transaction tickets, or receipts <br /> issued to the Contractor. <br /> I <br /> 1.2 JOB DESCRIPTION <br /> IA. The following is a general outline and is not intended to be a complete listing of <br /> the work to be accomplished nor is it intended to be used to indicate the order <br /> I the work is to be completed. The items listed below represent a general list of <br /> items included in the work and should be verified prior to bidding. The Work <br /> includes but is not limited to the supply and installation of all materials, equipment, <br /> Iand labor necessary to perform the Work in full. <br /> IB. Base Bid includes the following items: <br /> 1. Mobilization to WPCF. <br /> I 2. Decontamination of Equipment at WPCF Biosolids Pad. <br /> 3. City approval of Decontamination efforts. <br /> 4. Make temporary connections to utilities. <br /> I <br /> I01 1100 - 1 SUMMARY OF WORK <br />