American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1100 - 2 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> 5. Dredge and dewater (with Contractor supplied dredge and dewatering <br /> equipment) of 2,000 dry tons of biosolids. <br /> 6. Managing dewatered biosolids on site. <br /> 7. Load, weigh, and transport all dewatered biosolids to the designated area <br /> on City's Biosolids Pad. <br /> 8. WPCF Biosolids Pad site cleanup and restoration. <br /> 9. Demobilization. <br /> C. Work under the Contract shall also include: 1 <br /> 1. Sampling in a representative manner, storing samples according to <br /> sampling protocols, and submitting samples for analysis as required by <br /> Owner. <br /> 1.3 SUBMITTALS <br /> A. Prior to mobilization, the following submittals shall be submitted to the City for <br /> review and approval: <br /> 1. Proposed dewatering agents and the estimated quantity. <br /> 2. Contractor's Spill Prevention Plan (See example in Appendix B). <br /> 3. Health and Safety Plan (See Section 01 3529 section 1.5). 111 <br /> 1.4 BUILDING ACCESS AND SECURITY <br /> A. Contractor access to the work site will be restricted as follows: ' <br /> 1. Entry & Exit: The Contractor will be given access into facility by City's <br /> representative. Contractor is expected to maintain site security and lock <br /> gates outside of established working hours. See Section 01 3553. <br /> B. Due to COVID Pandemic conditions contractors will not be allowed into any City <br /> building. <br /> 1.5 WORKING HOURS <br /> A. General Contractor will be required to provide a project schedule that clearly , <br /> defines each phase of work and the work hours associated with each phase. <br /> 01 1100 - 2 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.