Laserfiche WebLink
City of Everett 01 1100 - 2 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> 5. Dredge and dewater (with Contractor supplied dredge and dewatering <br /> equipment) of 2,000 dry tons of biosolids. <br /> 6. Managing dewatered biosolids on site. <br /> 7. Load, weigh, and transport all dewatered biosolids to the designated area <br /> on City's Biosolids Pad. <br /> 8. WPCF Biosolids Pad site cleanup and restoration. <br /> 9. Demobilization. <br /> C. Work under the Contract shall also include: 1 <br /> 1. Sampling in a representative manner, storing samples according to <br /> sampling protocols, and submitting samples for analysis as required by <br /> Owner. <br /> 1.3 SUBMITTALS <br /> A. Prior to mobilization, the following submittals shall be submitted to the City for <br /> review and approval: <br /> 1. Proposed dewatering agents and the estimated quantity. <br /> 2. Contractor's Spill Prevention Plan (See example in Appendix B). <br /> 3. Health and Safety Plan (See Section 01 3529 section 1.5). 111 <br /> 1.4 BUILDING ACCESS AND SECURITY <br /> A. Contractor access to the work site will be restricted as follows: ' <br /> 1. Entry & Exit: The Contractor will be given access into facility by City's <br /> representative. Contractor is expected to maintain site security and lock <br /> gates outside of established working hours. See Section 01 3553. <br /> B. Due to COVID Pandemic conditions contractors will not be allowed into any City <br /> building. <br /> 1.5 WORKING HOURS <br /> A. General Contractor will be required to provide a project schedule that clearly , <br /> defines each phase of work and the work hours associated with each phase. <br /> 01 1100 - 2 SUMMARY OF WORK <br />