My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City _of Everett 01 1100 5 <br /> ' 2023 Biosolids Removal UT 3752-30 <br /> D. Centrate Return and Effects on Wastewater Treatment <br /> ' 1. Contractor shall return Biosolids centrate to the wastewater treatment <br /> process stream using the 10-inch centrate return line. This line runs from <br /> ' the Biosolids Pad to the north end of Aeration Cell #1. <br /> 2. Contractor is responsible for providing equipment to connect with the <br /> 10-inch centrate return line. <br /> 3. Contractor shall monitor and minimize any scum mat, foaming or other <br /> effects from dewatering chemical side-streams. Scum mats that form at the <br /> Recirculation Pump Station or the Aeration Cells in excess of 100 square <br /> ' feet in surface area shall be the responsibility of Contractor to collect and <br /> dispose of in dumpster(s) provided by the City for this purpose. Any costs <br /> of controlling, adjusting, or remediating effects of dewatering side-streams <br /> shall be incidental to the costs of dredging and dewatering. <br /> 1.8 BIOSOLIDS WEIGHING AND TRANSPORTATION <br /> A. Transportation Equipment <br /> ' 1. The Contractor shall provide all labor, equipment, and appurtenances <br /> necessary to perform and support the loading, transportation, and <br /> placement of the biosolids to the dewatering operations staging area. <br /> 2. Trucks shall be thoroughly cleaned after dumping the material with minimal <br /> solids left in the truck from the previous load. It shall be the Contractor's <br /> responsibility to clean up any biosolids on a daily basis that are deposited <br /> on the Pad between the dewatering staging area, the storage area, and the <br /> ' scale. <br /> B. Safety & Spills <br /> ' 1. Drivers must have current licenses for the vehicles they operate and <br /> suitable for the material hauled. <br /> ' 2. Any spillage of biosolids, fuel, or any debris or materials associated with the <br /> Contractor's activities or operations must be reported to the City's Project <br /> Manager as soon as possible. <br /> ' 3. The Contractor shall clean up any spills immediately per the Contractor's <br /> Spill Prevention Plan in a manner approved of by the City's Project Manager. <br /> Spill response and cleanup shall be at the Contractor's expense. See <br /> Section 01 5000 Temporary and Environmental Controls, 1.10 Spill <br /> Prevention. <br /> 01 1100 - 5 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.