My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1100 - 6 I <br /> 2023 Biosolids Removal UT 3752-30 <br /> C. WPCF Truck Scale <br /> 1. The City will provide a certified truck scale on the Biosolids Pad for the I <br /> Contractor to use. The scale will be used to weigh loads as they are moved <br /> to the storage area on the City's Biosolids Pad. I <br /> 2. Each truck will be weighed before and after loading biosolids to accurately <br /> calculate the weight of biosolids transported. This means that each truck <br /> load will have two scale tickets, one from the empty condition and one from 1 <br /> full. Both tickets are required for payment. <br /> 3. Upon completion of the work, the Contractor will be responsible for <br /> returning the truck scale to its original condition at the start of the project. I <br /> All damage to the truck scale will be the responsibility of the Contractor to <br /> repair to the satisfaction of the City's Project Manager. I <br /> 1.9 ADDITIONS TO, OR DEDUCTIONS FROM, THE CONTRACT I <br /> A. The authorization of all Additions to, or Deductions from, labor and materials, as <br /> called for in the Contract, shall be given only upon the Owner's printed change I <br /> order form bearing the signatures of the Owner, the Contractor, and the <br /> Architect/Engineer. <br /> 1.10 CHANGES IN THE WORK <br /> A. Change orders will be calculated based on the provisions in Section 00 7200. <br /> I <br /> 1.11 WORK BY OTHERS <br /> A. The Contractor is required to coordinate all their activities with the City's Project I <br /> Manager, or their designee. The City may have other construction projects in <br /> progress at the WPCF during the duration of this project and it is the Contractor's I <br /> responsibility to assure that adequate notice is given to the City's Project <br /> Manager regarding equipment or materials that may need to be relocated in order <br /> to perform the work. I <br /> 1.12 WORK BY THE OWNER I <br /> A. The Owner shall have the right to access the site 24/7 and execute work not <br /> included in this Contract and concurrent with the contract period. Contractor shall I <br /> cooperate with such Owner sponsored efforts. <br /> B. Sample testing and analysis required by the Owner under terms of this Contract I <br /> 01 1100 - 6 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.