My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cityof Everett 11 - I <br /> 01 00 8 <br /> 2023 Biosolids Removal UT 3752-30 I <br /> Construction Standards and Specifications, latest edition. <br /> E. All work shall comply with applicable requirements of Snohomish County. I <br /> F. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade <br /> association standard, or other similar standard, shall comply with the <br /> requirements of the latest revision thereof, and any amendment or supplement I <br /> thereto in effect on the date of Invitation for Bids, except as limited to type, class <br /> or grade, or modified in such references. All work shall conform to the standard <br /> referred to, except as modified in these specifications and the drawings. I <br /> 1.17 CONTRACTOR'S USE OF PREMISES <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of I <br /> products under this Contract. <br /> I <br /> B. The Contractor shall obtain and pay for use of additional parking, storage or work <br /> areas needed for his/her operations. i <br /> 1.18 CHECKING PLANS AND SPECIFICATIONS I <br /> A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discrepancies <br /> or omissions in the specifications to the Project Manager for a decision prior to I <br /> the Submission of Bids. <br /> I <br /> END OF SECTION 01 1100 I <br /> I <br /> I <br /> I <br /> I <br /> 01 1100 - 8 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.