My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1100 - 7 <br /> 2023 Biosolids Removal UT 3752-30 <br /> Iwill be conducted by appropriate City Staff under the supervision of Everett <br /> Environmental Laboratory, which is co-located at the WPCF. All samples required <br /> by City will be analyzed at City's expense. <br /> I <br /> 1.13 SOLIDS ANALYTICAL DATA <br /> A. Biosolids data is provided in Appendix C. Data was taken in 2022 per the WPCF's <br /> I NPDES permit from Washington State Department of Ecology. The biosolids <br /> have been analyzed in-situ for pollutants in accordance with 40 CFR 503 as <br /> required by coverage under the General Permit for Biosolids. Each prospective <br /> I bidder must determine what evaluations of the in-situ solids characteristics are <br /> necessary and shall coordinate with the City's Project Manager if additional solids <br /> information is needed. Time is given at each pre-bid meeting for Contractors to <br /> I take additional sampling. It is the Contractor's responsibility to determine how the <br /> characteristics of the City's biosolids may influence the performance and <br /> efficiency of their equipment. Solids concentration will vary horizontally and <br /> vertically within the City's Recirculation Channel. <br /> I1.14 CITY OF EVERETT BUSSINESS LICENSE <br /> A. Contractor must obtain a City of Everett business license prior to performing any <br /> IWork pursuant to this Contract. <br /> I1.15 PERMITS <br /> I <br /> A. The Contractor shall be responsible to obtain and pay the cost of any applicable <br /> permits and connection fees required to do the Work, and such costs shall be <br /> included in the Bid. <br /> I <br /> 1.16 CODES AND STANDARD SPECIFICATIONS <br /> IA. All construction shall be in accordance with the International Building Code, <br /> Current Adopted Edition. <br /> I <br /> B. All construction shall be in accordance with the Uniform Mechanical Code, and <br /> Ithe Uniform Plumbing Code, latest editions. <br /> I C. All construction shall be in conformance with the WSDOT/APWA Standard <br /> Specifications and Standard Plans, latest edition. <br /> ID. All construction shall be in conformance with the City of Everett Design and <br /> 01 1100 - 7 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.