My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3529 - 4 <br /> 2023 Biosolids Removal UT 3752-30 <br /> B. A copy of each accident report, which the Contractor or subcontractors have <br /> submitted to their insurance carriers, shall be forwarded to the Project Manager <br /> as soon as possible, but in no event later than seven (7) calendar days after the <br /> accident occurred. <br /> 1.5 PLAN I <br /> A. The Contractor shall develop a Site-Specific Health and Safety Plan addressing <br /> health and safety management methods specific to the project. The Plan shall, <br /> at a minimum, include: <br /> 1. The name of the individual at the jobsite responsible for implementation and <br /> compliance with this Plan. <br /> 2. If work requires the use of Fall Restraint or Fall Arrest, a Fall Protection work <br /> plan meeting the requirements set forth in WAC 296-155-24505 shall be <br /> included. <br /> 3. If applicable, the Plan shall include the name and qualifications of any I <br /> electrical safety observer to be provided by the Contractor. <br /> 4. Steps taken to provide protection of the public and City employees. This <br /> includes protection from falling objects. Indicated type of overhead safe I <br /> guards and protection to be installed and safeguards from equipment <br /> damage due to debris (including nails) on the ground. <br /> 5. A description of tasks to be undertaken, and equipment mobilized for this I <br /> project. <br /> 6. A list of all known and expected safety or health hazards, problems, and <br /> proposed control mechanisms. I <br /> 7. Safety Data Sheets (SDS) of and procedures for using, disposing of, or <br /> storing for all chemicals, products, or materials regulated by WAC 296-62 <br /> to be used by the Contractor. <br /> 8. A list of personal protective equipment, monitoring devices, and hazard- <br /> specific plans or permits as appropriate and required by State and Federal <br /> regulations. <br /> 9. A description of emergency response measures, equipment available for <br /> emergency response to address accidents and releases of materials, <br /> including, but not limited to, first aid, eye wash/showers, and fire <br /> extinguishing equipment, and location of this equipment at the jobsite. <br /> 10. Emergency phone numbers contacts, and location of the nearest medical <br /> facility. <br /> 11. A monitoring and inspection plan and record keeping measures to ensure <br /> that equipment and work practices comply with this Plan. 111 <br /> 12. Personnel names, training, and notification procedures as appropriate to <br /> ensure that all jobsite personnel are familiar with the Plan elements. Include <br /> copies of training certificates. <br /> 13. Procedures for safe storage and handling of flammable liquids, in <br /> accordance with WAC 296-24-330. <br /> 111 <br /> 01 3529 - 4 HEALTH AND SAFETY <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.