My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3529 - 3 <br /> 2023 Biosolids Removal UT 3752-30 <br /> SECTION 01 3529 - HEALTH AND SAFETY <br /> I <br /> 1.1 SECTION INCLUDES <br /> A. This Section covers the requirements for compliance with health and safety <br /> precautions and controls for projects without hazardous waste operations. <br /> ' B. Safety plan. <br /> C. Protection of equipment, public and City staff. <br /> 1.2 REFERENCES <br /> A. General: The publications listed below form a part of these specifications to the <br /> extent referenced. The publications are referred to in the text by basic <br /> designations only. <br /> B. Code of Federal and State Regulations <br /> 1. OSHA General Industry Safety and Health Standards (29 CFR 1910), <br /> Publication V2206; OSHA Construction Industry Standards (29 CFR 1926.) <br /> 2. National Emission Standards for Hazardous Air Pollutants (40 CFR, part <br /> 61). <br /> 3. Washington State Department of Labor and Industries (WISHA) 49.17- <br /> 49.26 RCW <br /> 4. Washington Administration Code (WAC) 296-155 Safety Standards for <br /> Construction Work <br /> I <br /> 1.3 SUBMITTALS <br /> A. The following submittals are required to be delivered within 5 days after Notice to <br /> Proceed has been received. <br /> 1. Health and Safety Plan (specific to this project) <br /> 2. Copies of all minutes/notes from daily safety meetings. <br /> 1.4 ACCIDENT REPORTING <br /> A. Serious accidents such as those resulting in treatment of an injury at a medical <br /> facility, response to the site by emergency medical personnel or damage to <br /> property other than that of the Contractor shall be reported to the Project Manager <br /> as soon as possible, but in no event later than within twenty-four (24) hours of <br /> the occurrence. <br /> 01 3529 - 3 HEALTH AND SAFETY <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.