My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 2113 - 1 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> SECTION 00 2113 - INSTRUCTIONS TO BIDDERS <br /> I <br /> 1.1 GENERAL DESCRIPTION AND LOCATION OF PROJECT <br /> IA. The Work to be performed will include furnishing all labor, materials, and <br /> equipment necessary to perform all Work as required by the Contract in <br /> Iaccordance with the Contract Documents. <br /> B. The Project Site is located at 4027 4th Street Southeast, Everett WA. See <br /> I <br /> Appendix A. <br /> I1.2 PROJECT MANAGER <br /> A. Questions and inquiries about the Contract Documents should be directed to the <br /> I attention of Hanna Lintukorpi, City of Everett Project Manager at (425) 257-8946 <br /> or email hlintukorpi@everettwa.gov. <br /> I1.3 STANDARD SPECIFICATIONS <br /> A. The following other Specifications and Standard Plans shall apply to the extent <br /> Ito which they are called out in the Contract Documents. <br /> 1. WSDOT "Standard Specifications for Road, Bridge and Municipal <br /> IConstruction", as amended by the APWA Supplements, hereinafter referred <br /> to as the "Standard Specifications", current edition as of bid date. <br /> 2. City of Everett "Design and Construction Standards and Specifications" <br /> Icurrent edition as of bid date, as found online on the City's Website at: <br /> https://everettwa.gov/1531/Design-Construction-Standards <br /> 3. "Standard Plans for Road and Bridge Construction," current edition as of <br /> Ibid date prepared by WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD), current edition as <br /> of bid date. <br /> I5. APWA Standards, current edition as of bid date. <br /> 6. AWWA Standards, current edition as of bid date. <br /> I <br /> 7. American Concrete Institute (ACI), current edition as of bid date. <br /> 1.4 EXAMINATION OF SITE CONDITIONS, CONTRACT DOCUMENTS AND <br /> I <br /> REGULATIONS <br /> A. Bidders shall inspect the Site of the Work and carefully review the Contract <br /> IDocuments to satisfy themselves, by personal examination, physical testing, or <br /> by such other means as they may prefer, of the location of the proposed Work, <br /> the actual physical conditions of and at the Site, surface and subsurface <br /> I00 2113 - 1 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.