Laserfiche WebLink
While the locations show landscaping features potentially obstructing the placement of the display, <br />the space will be cleared after the award for installation. <br />1. Display qualitative requirements for the preferred and optional display placement are as follows: <br />• Double -sided display. <br />• Portrait orientation. <br />• Display in a cabinet -style enclosure. Display viewing screen maximum size of 80" wide and 64" <br />tall. <br />• Maximum full display enclosure height of 100". <br />• The proposer may offer an integrated speaker with a configurable volume for announcements <br />such as emergency messages. <br />H. Bus Platforms D/E — Alternative Placement <br />\t1`r <br />-,111111444: -.MEW <br />The alternative placement option for two displays is shown in Appendix 4C and 4D. <br />2. Display qualitative requirements for the alternative display placement are as follows: <br />• Double -sided display. <br />• Portrait or landscape orientation. <br />• Display in a cabinet -style enclosure. Display viewing screen maximum size of 80" wide and 64" <br />tall. <br />W <br />• Maximum full display enclosure height of 100". <br />2.8 FUTURE DIGITAL INFORMATION DISPLAYS LOCATIONS <br />Over the next three years, Everett Transit anticipates adding real-time information displays at Mall <br />Station, located at 1330 SE Everett Mall Way, and College Station, located at 2200 Tower Street. The <br />specifications of the future displays would be like the Great Hall, CSC, or bus platforms D/E. <br />The supplier agrees to sell additional units at the price provided in their proposal response for the <br />remaining term of the contract. In addition, the City reserves the right to make changes, additions to, or <br />deductions from these specifications, provided that they conform to the general specifications. The <br />Supplier shall not affect any change without the written approval of the City of Everett. <br />PART B — CONTENT MANAGEMENT SOFTWARE <br />2.9 BACKGROUND <br />The supplier will be responsible for completing the integration of the Digital Information Display signage <br />system with regional agencies for receiving real-time transit information and will serve as a systems <br />integrator for all components and interfaces, both internal and external. Successful completion of Digital <br />Display System Integration must be achieved upon the successful completion of the thirty -day System <br />Acceptance Testing period, as defined in Section 2.12. <br />The displays shall integrate data as provided by the regional transit providers at Everett Station GTFS or <br />other schedule formats, and GTFS-RT feeds: <br />Page 11 of 42 <br />