My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4937 EVERGREEN WAY 2021 QFC FUELING STATION Plans 2023-02-27 (3)
>
Address Records
>
EVERGREEN WAY
>
4937
>
QFC FUELING STATION
>
Plans
>
4937 EVERGREEN WAY 2021 QFC FUELING STATION Plans 2023-02-27 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 7:59:51 AM
Creation date
2/16/2023 4:28:01 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4937
Tenant Name
QFC FUELING STATION
Permit
B2111-008
Year
2021
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q DEMOLITION CALLOUTS: <br />1. DEMOLISH EXISTING ASPHALT PAVEMENTS AND DISPOSE OF <br />OFF -SITE. <br />2. DEMOLISH EXISTING BARRIER CURB AND DISPOSE OF OFF -SITE. <br />3. REMOVE EXISTING UNDERGROUND POWER. DISPOSE OF OFF -SITE. <br />CONTRACTOR TO COORDINATE WITH PUGET SOUND ENERGY TO <br />SHUT OFF POWER. <br />4. REMOVE EXISTING LOT LIGHTS. DISPOSE OF OFF -SITE. <br />5. APPROXIMATE SAWCUT LINES (TYP). <br />6. REMOVE EXISTING STORM DRAIN AND CATCH BASIN. CAP AT <br />LOCATION SHOWN. CONTRACTOR TO LEAVE INTACT UNTIL ON SITE <br />STROMWATER CONVEYANCE IS OPERATIONAL TO ENSURE THAT SITE <br />HAS POSITIVE DRAINAGE DURING CONSTRUCTION. <br />7. DEMOLISH EXISTING LANDSCAPE ISLANDS AND DISPOSE OF <br />OFF -SITE. <br />8. REMOVE EXISTING WHEEL STOP AND DISPOSE OF OFF -SITE. <br />9. REMOVE EXISTING PAVEMENT STRIPING TO SAWCUT LINE AND <br />DISPOSE OF OFF -SITE. CONTRACTOR TO REPLACE PAVEMENT IF <br />DAMAGED DURING STRIPING REMOVAL. <br />10. PROTECT EXISTING UNDERGROUND POWER TO REMAIN. <br />11. PROTECT EXISTING STORM DRAIN AND CATCH BASIN TO REMAIN. <br />12. PROTECT EXISTING SEWER MAIN TO REMAIN. <br />13. PROTECT EXISTING ASPHALT PAVEMENT TO REMAIN. <br />14. PROTECT EXISTING LANDSCAPING TO REMAIN. REPLACE IN -KIND <br />PLANTINGS IF DAMAGED DURING CONSTRUCTION. <br />15. PROTECT EXISTING CURB WALL ADJACENT TO BACK OF BUS STOP <br />TO REMAIN. <br />16. PROTECT EXISTING PEDESTRIAN WALK WAY TO REMAIN. <br />17. PROTECT EXISTING WATER LINE TO REMAIN. <br />18. PROTECT EXISTING BUS STOP AND ALL ASSOCIATED PAVEMENTS <br />AND STRUCTURES. <br />19. APPROXIMATE LIMIT OF DISTURBANCE. <br />20. PROTECT EXISTING IRRIGATION SYSTEM TO REMAIN. <br />21. PROTECT EXISTING BARRIER CURB TO REMAIN. <br />22. PROTECT EXISTING UTILITY POLE. <br />23. REMOVE EXISTING TREE. <br />DEMOLITION NOTES: <br />1. ALL PAVEMENTS, SLABS, GROUND COVER, UTILITIES, ETC., <br />INSIDE LIMITS OF DISTURBANCE SHALL BE REMOVED UNLESS <br />OTHERWISE SHOWN ON THE PLANS. <br />2. CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE <br />VARIOUS UTILITY COMPANIES ON REQUESTING DISCONNECTIONS, <br />REMOVALS AND/OR RELOCATION OF EXISTING SERVICE. <br />3. CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS <br />AND CONSTRUCTION APPROVALS HAVE BEEN OBTAINED PRIOR <br />TO COMMENCING WORK. <br />4. CONTRACTOR SHALL REPLACE ALL EXISTING CURB, PAVEMENT <br />AND/OR LANDSCAPING DAMAGED AS A RESULT OF <br />CONSTRUCTION ACTIVITY. <br />5. CONTRACTOR SHALL, PRIOR TO CONSTRUCTION OR REMOVAL <br />OF IMPROVEMENTS, FIELD VERIFY AND CONFIRM LIMITS OF <br />DEMOLITION AS WELL AS EXISTING UTILITIES AND <br />IMPROVEMENTS TO REMAIN. <br />DEMO LEGEND: <br />11;1:�mnnomm, <br />• <br />EXISTING TREES TO REMAIN AND BE PROTECTED. CONTRACTOR TO ENSURE NO <br />DAMAGE TO TREE ROOT ZONES OCCURS. CONTRACTOR TO INSTALL/IMPLEMENT <br />TREE PROTECTION MEASURES AS NECESSARY. <br />IY <br />5 <br />�n <br />0 <br />1 <br />o <br />s <br />N <br />19" <br />to <br />z <br />{{� <br />fp <br />W <br />23 <br />� <br />I <br />�a <br />14 <br />ir <br />m <br />L <br />I W <br />z <br />22 a <br />/X�v <br />V <br />a <br />t 4 <br />t <br />!3 <br />�� f . , � 2 <br />1 <br />LU <br />N N � <br />on (d 40 <br />N n gyp. <br />t6 <br />o t8 8 <br />r ai <br />e 0: j I UTILITY EASEMENT J' 20 3 <br />NO. 200811250386 <br />a <br />Ja <br />;' •i 15 <br />a <br />1 20 <br />{ ..- 8 <br />t!J ASPHALT TO BE REMOVED <br />i <br />CURB TO BE REMOVED t` <br />I <br />------------------ SAWCUT LINE 1 20 / <br />2 f� <br />PUBLIC TRANSPORTATION EASEMENT �14 -� <br />N0. 200807250218 0- 14 <br />30...-- <br />PROPERTY PROTECTION NOTE <br />THE CONTRACTOR SHALL PROTECT AND PRESERVE FROM DAMAGE, INTERFERENCE AND <br />DESTRUCTION ALL PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK. IF I o <br />SUCH PROPERTY IS DAMAGED OR DESTROYED OR ITS USE INTERFERED WITH BY THE CONTRACTOR STREET EASEMENT <br />OR HIS OR HER AGENTS, IT SHALL BE RESTORED IMMEDIATELY TO ITS FORMER CONDITION BY THE NO. 8806070036 <br />CONTRACTOR AT HIS OR HER EXPENSE AND SUCH INTERFERENCE TERMINATED. 8806100156-- 4 . <br />9205260230 <br />EASEMENT NOTE: <br />THE LOCATION OF THE EASEMENTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE <br />COMPANY NO. NCS-1067959-OR1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT N80`Z5-46_W 47190' <br />SURVEYED THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE <br />ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS, <br />UTILITY PROTECTION NOTE: <br />APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON THESE PLANS. CONTRACTOR TO <br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON -SITE, UNTIL <br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER <br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK <br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES. <br />UTILITY CONFLICT NOTE: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH <br />A UTILITY POTHOLING NOTE- <br />OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS <br />THE CIRCLED LOCATIONS ARE REQUIRED TO BE POTHOLED TO <br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING <br />VERIFY VERTICAL AND HORIZONTAL LOCATION OF EXISTING UTILITY <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT <br />AND/OR POTENTIAL CONFLICTS WITH EXISTING UTILITIES. POTHOLING <br />CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON <br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD <br />SHALL BE PERFORMED PRIOR TO INSTALLING ANY PROPOSED <br />OCCUR, THE CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE <br />UTILITIES. CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING <br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />ENGINEERS, INC. OF ANY CONFLICTS. <br />Sec. 31, Twp. 29N, Rge. 5E, W.M. <br />DEMOLITION PLAN <br />a <br />o <br />O <br />1 <br />17' I PROPOSED CITY OF <br />EVERETT WATER EASEMENT <br />14 <br />21 ff l+ SEWER EASEMENT <br />1 NO. 870076 1 ' <br />11 870077 a a <br />870078 4' <br />I1 870079 ' <br />10 <br />t n 13 a. <br />� a <br />fff N <br />19 .4 <br />4� a <br />3 <br />En <br />C" <br />7 <br />1 y <br />4a 12 5 <br />7 A --'' <br />2 <br />en 2 0 <br />7 <br />21 <br />4 7 j <br />N <br />f 4' <br />19 4 + <br />N ) <br />13 9 ~� u <br />P <br />9 <br />�s <br />211 <br />10 <br />4 4N80'25 <br />d a a a<. 46"yy 41303` <br />4 a. ,l <br />da.a. <br />da a <br />ST S EF <br />.�_ <br />ROAD CENrERL�N� <br />�``-- - s <br />N <br />0 10' 20' 40' <br />C������•1;iTi <br />Barghausen <br />Consulting Engineers, Inc. <br />18215 72nd Avenue South <br />Kent, WA 98032 <br />425.251.6222 <br />barghausen.com <br />BCE #20996 <br />ig <br />Ci <br />N <br />LO <br />00 <br />H <br />W <br />U <br />W <br />LL. <br />LL <br />0 <br />tN <br />G/ <br />E <br />0 <br />m <br />0 <br />o <br />o) v <br />C <br />o <br />.W Wpm <br />m0,oge <br />zap: <br />-o <br />o+a <br />LL=2Z <br />0 0_1 U0 <br />O a a <br />10/15/21 <br />�I11' <br />�8■■1 <br />p Know what's below. <br />p Cali before you dig. <br />Dial 811 <br />®� <br />FEm <br />o <br />a <br />< <br />o <br />z <br />r <br />S <br />Project #: 20996 Store #00852 <br />Designed By. ADW <br />a <br />Drown By. ADW <br />r` <br />Checked By. CJR <br />0 <br />Dote: 10-15-2021 <br />0 <br />Scole: 1 " = 20' <br />Ln <br />Disk File: 20996-EN.dwg <br />o <br />Model: <br />3 <br />a <br />Address: <br />w <br />4919 EVERGREEN WAY <br />EVERETT, WA 98203 <br />rn <br />0 <br />N <br />CP <br />DEMOLITION PLAN <br />OFC <br />iT <br />Drowing No.: <br />o <br />/ <br />C2.0 Of <br />O <br />0 <br />0 <br />0 <br />®6 <br />/ <br />a: <br />
The URL can be used to link to this page
Your browser does not support the video tag.