CITY OF EVERETT TESC NOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES <br />NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN <br />(E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS <br />THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL <br />BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE <br />CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING <br />LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br />CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH <br />A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER <br />DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT <br />AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY <br />THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, <br />ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS <br />FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND <br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING <br />OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE <br />PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br />PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE <br />DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH <br />APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SEPTEMBER 30. <br />® EROSION CONTROL CALLOUTS: <br />1. CONTRACTOR TO INSTALL SILT FENCE AROUND PERIMETER OF SITE <br />AS NECESSARY TO PREVENT SILT -LADEN RUNOFF FROM LEAVING <br />SITE, AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL 1 /C2.2. <br />2. CONTRACTOR TO INSTALL TEMPORARY INLET SEDIMENT PROTECTION <br />AT ALL EXISTING AND PROPOSED CATCH BASINS AS NECESSARY <br />TO PREVENT SILT -LADEN WATER FROM ENTERING STORM DRAINAGE <br />SYSTEM. COORDINATE PLACEMENT AS DIRECTED BY CITY <br />INSPECTOR. SEE DETAIL 2/C2.2. <br />3. APPROXIMATE LOCATION OF CONSTRUCTION STAGING AREA. <br />CONTRACTOR TO USE THIS AREA FOR TEMPORARY STOCKPILE <br />STORAGE AND CONCRETE WASHOUT. ADJUST SIZE AND LOCATION <br />OF AREA AS NEEDED DURING CONSTRUCTION. <br />4. CONTRACTOR TO INSTALL TEMPORARY STABILIZED CONSTRUCTION <br />ENTRANCE ROCK PAD PER CITY STANDARDS. SEE DETAIL 3/C2.2. <br />5. INSTALL TEMPORARY CONSTRUCTION FENCE AND 20' WIDE <br />SITE ACCESS GATE (6' HIGH -CHAIN LINK WITH LOCKING DEVICE) <br />AT TEMPORARY CONSTRUCTION ENTRANCES; PER DETAIL 5/C2.2. <br />FIELD VERIFY AND CONFIRM EXACT LOCATION WITH OWNER. <br />6. FLOW ARROWS INDICATING DIRECTION OF STORMWATER RUNOFF <br />(TYP). <br />7. APPROXIMATE LIMITS OF DISTURBANCE. <br />8. APPROXIMATE LOCATION OF TEMPORARY "V" DITCH PER DETAIL 4/C2.2 <br />CONTRACTOR TO CONFIRM POSITIVE DRAINAGE. <br />9. APPROXIMATE LOCATION OF TEMPORARY SEDIMENT TRAP. <br />CONTRACTOR TO INSTALL TEMPORARY SEDIMENT TRAP. <br />CONTRACTOR TO GRADE TO SEDIMENT TRAP. MINIMUM REQUIRED <br />SURFACE AREA FOR SEDIMENT TRAP IS 675 SF. CONTRACTOR TO <br />ENSURE SEDIMENT TRAP LENGTH TO WIDTH RATIO OF 3:1 MIN. <br />SEE DETAIL 6/C2.2. <br />EROSION CONTROL NOTES: <br />DUST CONTROL NOTES: <br />1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE <br />1. <br />WATER ALL ACTIVE CONSTRUCTION AREAS AT <br />AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF <br />LEAST TWICE DAILY. <br />EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS <br />IMMINENT. <br />2. <br />WATER OR COVER STOCKPILES OF DEBRIS, <br />SOIL, SAND OR OTHER MATERIALS THAT CAN <br />2. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL <br />BE BLOWN BY THE WIND. <br />DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE <br />AUTHORITY HAVING JURISDICTION AFTER EACH RUN-OFF <br />3. <br />COVER ALL TRUCKS HAULING SOIL, SAND, <br />PRODUCING RAINFALL. <br />AND OTHER LOOSE MATERIALS OR REQUIRE <br />ALL TRUCKS TO MAINTAIN AT LEAST TWO <br />3. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION <br />FEET OF FREEBOARD. <br />CONTROL MEASURES AS MAY BE REQUIRED BY THE <br />AUTHORITY HAVING JURISDICTION DUE TO UNCOMPLETED <br />4. <br />SWEEP DAILY (PREFERABLY WITH WATER <br />GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES <br />SWEEPERS) ALL PAVED ACCESS ROADS, <br />WHICH MAY ARISE. <br />PARKING AREAS AND STAGING AREAS AT <br />CONSTRUCTION SITES. <br />4. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER <br />PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST <br />5. <br />SWEEP STREETS DAILY (PREFERABLY WITH <br />BE INSTALLED AND MAINTAINED. <br />WATER SWEEPERS) IF VISIBLE SOIL MATERIAL <br />IS CARRIED ONTO ADJACENT PUBLIC STREETS. <br />D. CONTRACTOR TO IMPLEMENT SLOPE STABILIZATION MEASURES <br />AS NECESSARY FOR EXPOSED SLOPES DURING <br />CONSTRUCTION. MEASURES CAN INCLUDE TEMPORARY AND <br />PERMANENT SEEDING PER DOE BMP C120. <br />THE CONTRACTOR SHALL PROTECT AND <br />PRESERVE <br />FROM DAMAGE, <br />INTERFERENCE AND <br />DESTRUCTION ALL PRIVATE AND PUBLIC <br />PROPERTY <br />ON OR IN THE <br />VICINITY OF THE WORK. IF <br />SUCH PROPERTY IS DAMAGED OR DESTROYED OR <br />ITS USE INTERFERED WITH BY THE CONTRACTOR <br />OR HIS OR HER AGENTS, IT SHALL BE <br />RESTORED <br />IMMEDIATELY TO <br />ITS FORMER CONDITION BY THE <br />CONTRACTOR AT HIS OR HER EXPENSE <br />AND SUCH <br />INTERFERENCE <br />TERMINATED. <br />THE LOCATION OF THE EASEMENTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE <br />COMPANY NO. NCS-1067959-OR1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT <br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE <br />ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS. <br />UTILITY PROTECTION NOTE: <br />APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON THESE PLANS. CONTRACTOR TO <br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON -SITE, UNTIL <br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER <br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK <br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES. <br />UTILITY CONFLICT NOTE: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH <br />OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS <br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT <br />CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON <br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD <br />OCCUR, THE CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE <br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />UST EXCAVATION NOTE: <br />Sec. 31, Twp. 29N, Rge. 5E, W.M. <br />TESC PLAN <br />0 <br />o P <br />PROPOSED CITY OF E I a <br />EVERETT WATER EASEMENT °. <br />7 <br />N /1 SEWER EASEMENT ( 4.• <br />f i -ti NO. 870076870077 <br />t <br />b �o 870078 ! 1 <br />2 870079 f <br />w QJ 4 <br />s`v <br />I TOP N } <br />5 / 4 <br />3 ,4 ° <br />j <br />ROCK PAD TYP i 4 <br />1 r <br />( 7 <br />N ry ° <br />3 <br />14 <br />c & -+ UTILITY EASEMENT <br />NO. 200811250386 <br />a a� <br />APPROXIMATE FOOTPRINT OF <br />f UNDERGROUND STORAGE TANK <br />EXCAVATION. CONTRACTOR TO <br />PROVIDE SHORING DESIGN AND <br />ASSOCIATED PERMITTING. SEE UST <br />EXCAVATION NOTE THIS SHEET. <br />P <br />PUBLIC TRANSPORTATION EASEMENT pc <br />NO. 200807250218 <br />f <br />STREET EASEMENT i <br />NO. 8806070036 <br />8806100156 <br />9205260230 <br />TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS. TANK <br />EXCAVATIONS WILL REQUIRE SHORING AND SHALL BE ENGINEERED <br />AND PERMITTED SEPARATELY AND SHALL BE THE RESPONSIBILITY OF <br />THE INSTALLING CONTRACTOR. <br />UTILITY POTHOLING_ NOTE: <br />THE CIRCLED LOCATIONS ARE REQUIRED TO BE POTHOLED TO <br />VERIFY VERTICAL AND HORIZONTAL LOCATION OF EXISTING UTILITY <br />AND/OR POTENTIAL CONFLICTS WITH EXISTING UTILITIES. POTHOLING <br />SHALL BE PERFORMED PRIOR TO INSTALLING ANY PROPOSED <br />UTILITIES. CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING <br />ENGINEERS, INC. OF ANY CONFLICTS. <br />5 `. 7 / <br />302. `` `� \Q V) <br />t <br />'--- -- <br />°° 46 y J <br />' 413 03n ( f' <br />a N80• J} <br />N80'25'46 _ <br />_ OT1y ST <br />Raab ctvnrr <br />ERLINE _ e : S <br />SS SS <br />FOUNDATION OVER -EXCAVATION NOTE: <br />CONTRACTOR TO OVEREXCAVATE TO REVEAL FIRM NON -YIELDING, NON -ORGANIC <br />SOIL. INSTALLATION OF STRUCTURAL FILL MAY BE REQUIRED TO PROVIDE A <br />SUITABLE SUBGRADE FOR BUILDING FOUNDATIONS. CONTRACTOR TO REFER TO <br />THE GEOTECHNICAL ENGINEERING REPORT PREPARED BY THE RILEY GROUP, INC. <br />DATED JANUARY 7, 2020 FOR FOUNDATION SUBGRADE PREPARATION <br />REQUIREMENTS. <br />TEMPORARY EXCAVATION SLOPE NOTE: <br />CONTRACTOR TO ENSURE TEMPORARY SLOPES HAVE A MAXIMUM SLOPE <br />INCLINATION OF 1.5H:1V. CONTRACTOR TO REFER TO THE GEOTECHNICAL <br />ENGINEERING REPORT PREPARED BY THE RILEY GROUP, INC. DATED JANUARY 7, <br />2020 FOR EXCAVATION AND SLOPE REQUIREMENTS. <br />N <br />0 10' 20' 40' <br />8�1 <br />SCALE: 1 "=20' <br />Know what's below. <br />Call before you dig. <br />Dial 811 <br />Barghausen <br />Consulting Engineers, Inc. <br />18215 72nd Avenue South <br />Kent, WA 98032 <br />425.2S1.6222 <br />barghausen.com <br />BCE #20996 <br />N <br />to <br />00 <br />I <br />W <br />Z <br />U <br />W <br />LL <br />U. <br />0 <br />z <br />O <br />V) <br />LL_l <br />ry <br />as <br />E <br />m <br />0 <br />V) <br />= <br />0 <br />V ° <br />z �r <br />C� <br />w I:� , <br />NNO)m <br />" <br />Cn W <br />10;0 <br />z 4;.:.: <br />tj <br />00< <br />LL°C <br />0 om0' <br />o; It <br />U -.n,a00oo <br />40 1 M <br />-0�Mr <br />�C(m CVI <br />IYo- ®M �Li �� - 0 <br />p°°9an <br />S'GR <br />�~ of wasti, <br />p <br />2$527 <br />A LT <br />10/15/211 <br />o <br />z <br />Project #: 20996 Store #00852 <br />Designed By. ADW <br />Drown By. ADW <br />Checked By. CJR <br />Dote: 10-15-2021 <br />Scale: 1" 20' <br />Disk File: 20996-EN.dwg <br />4919 EVERGREEN WAY <br />EVERETT, WA 98203 <br />TESC PLAN <br />OFC <br />FUS-M FAC M <br />Vo.: <br />C <br />8, <br />