Laserfiche WebLink
_v <br />11 <br />CrNz <br />4A <br />Q - <br />It It 91 <br />re --j <br />EVE EIT A T <br />NTS <br />a <br />Ikl <br />ICI <br />IIl <br />FILL (TYP..) <br />'a <br />UTILITY CONFLICT NOTE: <br />CAUTION: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALI_ EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR. TO CONSTRUCTION, THIS SHALL INCLUDE CALLING <br />UTILITY LOCATE 0 1 (800) 424-5555 AND THEN POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY <br />WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON <br />THEE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE <br />SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL <br />CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS <br />PRIOR TO PROCEEDING WITH CONSTRUCTION, <br />CAUTION! POTEN IIAL UTILITY CONFLICT. CONTRACTOR SHALL <br />FIELD VERIFY ALL EXISTING AND NEW UTILITIES PRIOR TO <br />CONSTRUCTION, SEE UTILITY CONFLICT NOTE <br />THE EXISTING WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS <br />APPROXIMATE, BASED ON FIELD SURVEYS AND "AS -BUILT" RECORDS. THE <br />GENERAL CONTRACTOR SHALL "POTHOLE" THE EXISTING UTILITIES TO VERIFY <br />THE DIAMETER AND LOCATION (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION, <br />ANY DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR <br />INCOMPATIBILITY OF THE DEIGN SHALL BE BROUGHT TO THE IMMEDIATE <br />ATTENTION OF THE OWNERS REPRESENTATIVE, AND BARGHAUSEN CONSULTING <br />ENGINEERS (425-251-6222). <br />(2) 2" DIA. (GAS) & (1) 2" DIA. (DIESEL) <br />BLACK STEEL VENT RISERS CATHODICALLY <br />PROTECTED TO GRADE. PAINT SHERWIN <br />WILLIAMS "ESSENTIAL GRAY" SW#6002 <br />INSTALL OVERFILL ALARM, <br />ACKNOWLEDGMENT SWITCH <br />D MONITORING WELL <br />(TYP. OF 2) <br />TANK SLAB <br />0 <br />[ 1-1/2" <br />INSIDE <br />(TYP.) <br />n <br />r <br />"FRP <br />(TYP.) <br />20,000 GALLON (UNLEADED) <br />TURBINE/LEVEL GAUGE (TYP) <br />FILL (TYP..) <br />VENT & STAGE I & II <br />VAPOR. RETURN (TYP.) <br />ANNULAR SPACE <br />(TYP. OF 2) <br />INCON ALARM <br />MONITOR SYSTE <br />WATERGROUND LEVEL NOTE: <br />TANK EXCAVATION NOTE: <br />A, SOILS REPORT OF THIS SITE LOCATION HAS REVEALED THAT GROUNDWATER <br />TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED <br />WAS NOT ENCOUNTERED BELOW GROUND SURFACE DURING TEST BORINGS <br />FOLLOWING THE RECOMMENDATIONS OF THE SOILS REPORT. TANKS <br />TANKS SHALL BE ANCHORED WITH CONCRETE DEADMEN AND INSTALLED WITH <br />EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED <br />FILTER FABRIC PER MANUFACTURERS' GUIDELINES. TANK EXCAVATIONS SHALL <br />SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING <br />BE PER OSHA REQUIREMENTS AND BE PERFORMED FOLLOWING THE <br />CONTRACTOR, <br />RECOMMENDATIONS OF THE SOILS REPORT. TANKS EXCAVATIONS THAT <br />REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED SEPARATELY AND <br />FIRS-( FUEL DROP REQUIREMENT: <br />SHALL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR. <br />PRIOR TO FUEL DROP„ THE G.C. SHALL HAVE THE MONITORING SYSTEM <br />GEOTECHNICAL ENGINEER: <br />OPERATIONAL. OWNER WILL NOT SCHEDULE FUEL FOR DELIVERY UNTIL THE <br />JURISDICTION HAS AUTHORIZED THE SITE FOR FIRST FUEL DROP, MONITORING <br />THE RILEY GROUP, INC. <br />SYSTEM IS OPERATIONAL AND MONITORING THE TANKS/LINES AND THE SITE IS <br />17522 BOTHELL WAY NORTHEAST <br />ACCESSIBLE FOR FUEL TRUCKS <br />BOTHELL, WASHINGTON 98011 <br />PHONE: (425) 821-7777 <br />FAX: (425) 415-0311 <br />CONTACT: RICKY R. WANG, P.E. <br />DEWATERING NOTE <br />THE GENERAL CONTRACTOR SHALL REVIEW PLANS, NOTES, AND <br />GEOTECHNICAL. ENGINEER RECOMMENDATIONS FOR IF DEWATERING <br />MEASURES REQUIRED FOR EXCAVATIONS. COSTS FOR PROVIDING AND <br />IMPLEMENTING THESE MEASURES ON THIS PROJECT SHALL BE <br />SPECIFICALLY INCLUDED IN THE CONTRACTOR'S BID PROPOSAI-S. <br />1-1/'2" ( 7 KI <br />8,000 GALLON (PREMIUM) INSIDE 4"��- <br />DRIVE SLAB <br />2>n EMERGENCY U <br />17 3+1 DISPENSER PUMP SHUTOFF Q <br />(TYP. OF 5) SWITCH. <br />6 j 2" FRP I <br />2" FRP <br />3" FRP <br />El 1-1/2 7 ® E <br />INSIDE 4' - <br />k (TYP.) <br />-- <br />- - - -- <br />21)U-SHAPE o <br />BOLLAR (TYP.) <br />3" FRP�r_6_- <br />-— <br />-m-- --o--( pP---00-0---------� <br />VENT MANHOLE <br />2" FRP 6 <br />(TYP.) <br />RBINE/LEVEL GAUGE (TYP) <br />10,000 GALLON <br />(DIESEL) <br />SHEET <br />INDEX <br />T1.0 <br />UNDERGROUND TANK AND PIPING SITE PLAN <br />T2,0 <br />TANK AND PIPING MATERIAL LIST <br />T2e 1 <br />TANK AND PIPING MATERIAL LIST <br />T10 <br />20,000 GALLON TANK DETAILS <br />T3.1 <br />8K-10K GALLON TANK € ETA:ILS <br />T4.0 <br />TANK SLAB ANCHORING DETAILS <br />T5.0 <br />TANK TURBINE SKIMP DETAILS <br />MO <br />TANK TURBINE SKIMP AND DETAILS <br />T7,0 <br />TANK FILL SKIMP AND DETAILS <br />�ANDPIPING�DCILS <br />T-r <br />DISPENSE WAYNE OVATION 3+ 1 <br />E 1 e0 <br />ELECTRICAL PLAN AND DETAILS <br />E2,0 <br />ELECTRICAL PANELS AND DETAILS <br />E3.0 <br />TANK AND DISPENSED LEAK DETECTION WIRING <br />PIPING LEGEND <br />1-1/2" FLEXIBLE SINGLE WALL PRODUCT PIPING IN 4" ACCESS DUCT <br />2" OR 3" F.G. SINGLE WALL FIBERGLASS VAPOR RECOVERY'PIPING <br />- - - - - - - - - - - - 2" SINGLE WALL FIBERGLASS VENT PIPING <br />TANK AND PIPING INSTALLATION NOTES <br />�1 j INSTALL ONE 20,000 GALLON AND ONE (10,000 + 3,000) DUAL COMPARTMENT XERXES DOUBLE WALL <br />FIBERGLASS TANKS WITH HYDROSTATIC ANNULAR SPACE MONITORED BY "INCON" TS-550 TANK AND PIPING <br />MONITORING AND .ALARM SYSTEM. TANKS TO BE SET MIN. 60" BELOW FINISH GRADE. SE DRAWINGS T3.0, <br />T3.1, & T4.O FOR ADDITIONAL INFORMATION AND FOR TANK ANCHORING REQUIREMENTS. TANK INSTALLATION PER <br />MANUFACTURER'S INSTRUCTIONS, <br />INSTALL 8" MIN. REINFORCED CONCRETE SLAB OVER TANKS. SET MANHOLE COVERS ABOVE SLAB. SEE CIVIL <br />DRAWINGS FOR INSTALLATION DETAILS <br />2A INSTALL 6" MIN. REINFORCED CONCRETE DRIVE SLAB. SEE CIVIL DRAWINGS FOR INSTALLATION DETAILS <br />Q INSTALL THREE (3) DIRECT BURY FILL SPILL BUCKET 5 GALLON WITH ADAPTERS AND CAPS. SEE SHEET T7.0 <br />INSTALL TWO (2) DIRECT BURY VAPOR. SPILL BUCKET 5 GALLON WITH ADAPTERS AND CAPS. SEE SHEET T7.0 <br />4A INSTALL ONE (1) 12" VENT MANHOLE COVER AT DIESEL TANK SEE SHEET T7.0 <br />INSTALL ONE (1) F.E. PEROO IST 4 HP VARIABLE SPEED TURBINES IN THE 20,000 GALLON 87 OCTANE <br />UNLEADED TANK (TANK #1). INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 8,000 GALLON 92 OCTANE <br />PREMIUM TANK (TANK #2). INSTALL (1) 1 1/2 HP VARIABLE SPEED TURBINE IN THE 10,000 GALLON DIESEL <br />TANK (TANK #3). TURBINES TO BE EQUIPPED WITH 1. GPH PRESSURE LINE LEAK DETECTION. SET TURBINE <br />INTAKES AT 6" FROM BOTTOM OF TANKS, TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. <br />INSTALL 3" SINGLE WALL FRP STAGE II VAPOR RECOVERY HEADER FOR "BALANCE" VAPOR RECOVERY SYSTEM. <br />SLOPE 1/8" PER FOOT MINIMUM TO TANKS, INSTALL 3" TO 2" REDUCING TEES FOR WHERE HEADERS BRANCH <br />TO DISPENSERS. INSTALL 2" SINGLE WALL FRP STAGE II HEADERS TO DISPENSERS. SLOPE 1/8" PER FOOT <br />MINIMUM TO 3" HEADER. <br />7) INSTALL 1-1/2" "OPW/FLEXWORKS" FLEXIBLE DOUBLE WALL PRODUCT LINES FOR GASOLINE SERVICE, LINES TO <br />BE INSTALLED IN 4" ACCESS PIPE. LINES TO BE EQUIPPED WITH LIQUID LEAK MONITOR SENSOR IN PIPING SUMP <br />ATTACHED TO TANK AND WIRED FOR TURBINE SHUT DOWN, NO SLOPE REQUIRED BETWEEN DISPENSERS. NO <br />LIQUID TRAPS OR HIGH SPOTS ALLOWED IN PIPE RUN. SLOPE DOWN 1/8" PER FOOT MINIMUM FROM CLOSEST <br />DISPENSER TO TANK,SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATION AND INSTRUCTIONS WITH <br />CONTINUOUS RUNS BETWEEN DISPENSER AND TANK SUMPS, INSTALL PIPING CROSSOVER SUPPORTS WHERE <br />LINES INTERSECT, <br />`a INSTALL "INCON" TANK AND LINE ALARM CONTROL PANEL MODEL # TS-550 IN KIOSK ENCLOSURE BUILDING. <br />SEE ELECTRICAL DRAWINGS FOR EXACT LOCATION, <br />INSTALL TWO (2) 2" (GAS) AND ONE (1) 2" (DIESEL) SINGLE WALL FIBERGLASS VENT LINES, SLOPE 1/4" PER <br />FOOT MINIMUM TO TANKS. <br />10 TERMINATION POINT OF TANK VENT TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY <br />BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN <br />ACCORDANCE WITH INTERNATIONAL FIRE CODE REQUIREMENTS. <br />11 INSTALL THEE (3) 3/4" CONDUITS FOR SUBMERSIBLE PUMP POWER AS FOLLOWS: ONE CONDUIT AT EACH <br />TURBINE SUMP, <br />12 INSTALL TWO (2) ANNULAR SPACE DUAL FLOAT HYDROSTATIC MONITORING SENSORS. SEE SHEET T-6_ <br />13 INSTALL BALL FLOAT VALVE/EXTRACTOR ASSEMBLIES FOR VENT, STAGE 1 & 2 VAPOR RECOVERY. SEE SHEET T-7 <br />13A INSTALL BALL FLOAT VALVE/EXTRACTOR ASSEMBLIES FOR VENT SEE SHEET T-7. <br />14 INSTALL ,1 GPH MAG PROBE TANK LEVEL GAUGES AT LOCATIONS SHOWN, SEE SHEET T6.0 <br />:l 5D TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AND BRASS <br />TAGS AT FILL MANHOLES. <br />i6 INSTALL TWO (2) 4" MONITORING WELLS AT LOCATIONS SHOWN ON SHEET T4.0 <br />QD INSTALL (5) FIVE WAYNE OVATION B-23, DUAL HOSE PER SIDE, BLENDING MULTI -PRODUCT DISPENSERS <br />W/DANDESEL UNDER SD SPENSERISPENSERS CONTAIINMENOT INCLUDINGE FITTED WITH PRODUCTPRODUCT AND VAPORC STAGE It OSES SHEARDALVVESLAND MONITORING <br />AWAY VALVES <br />SENSORS. SEE SHEETS T-8.1 FOR TYPICAL INSTALLATION DETAILS. SUMPS MUST BE FIELD ADJUSTED TO <br />ACCOUNT FOR 1/8" PER FOOT PIPING SLOPE REQUIREMENTS FROM DISPENSER SUMP TO DISPENSER SUMP, <br />START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE <br />MINIMUM. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING <br />THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. <br />18 INSTALL TANK OVERFILL ALARM AND ACKNOWLEDGMENT SWITCH AT 5-0" ABOVE FINISHED GRADE. LOCATE TO <br />PROVIDE UNOBSTRUCTED VIEW FOR DELIVERY VEHICLE OPERATOR SE SHEET T4.0 <br />19 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION <br />INSTRUCTIONS. CONTRACTOR SHALL USE FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE VAPOR <br />RECOVERY MANIFOLD, MAIN PRODUCT LINES AND SIPHON PIPING OR SHALL PROVIDE AT LEAST 4 FEET OF <br />STRAIGHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES. <br />20 INSTALL EMERGENCY STOP BUTTON. ALL DISPENSERS MUST BE WITHIN 100' OF AN EMERGENCY STOP BUTTON. <br />21 INSTALL U SHAPED PIPE BOLLARD (TYP.). <br />COMPLIANCE NOTES <br />1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY <br />LINES, ELEVATIONS AND EQUIPMENT LOCATIONS <br />2, ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE. FIELD BEFORE STARTING ANY WORK, <br />ANY DISCREPANCY SHALT_ BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR DECISION BEFORE <br />PROCEEDING WITH THE WORK. <br />3, GENERAL CONTRACTOR SHALL OBTAIN! NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF <br />TRENCHES 5-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND, <br />4. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK <br />INSTALLATION. <br />5. TANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT FOUR (4) SEPARATE <br />CONSTRUCTION PHASES AS REQUIRED: <br />A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST. <br />B, TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR NOT LESS THAN 1 HOUR <br />C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH <br />MANUFACTURER'S GUIDELINES. <br />D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.. <br />6. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE <br />TEST) WITH STANDING WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. <br />7, TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY <br />GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION, <br />8, AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY <br />PRIOR TO TANK OPERATIONS. <br />9, EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY. <br />10. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED <br />CODES, LOCAL CODES AND GOVERNING AUTHORITIES. <br />11. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. ALL <br />CONTINUOUS MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. TANK TEST <br />METHOD: UNDERFILL WITH ULLAGE TANK TIGHTNESS TEST METHODS: PRODUCT LEVEL IN THE TANK TIGHTNESS <br />TEST METHOD IS RAISED TO THE OVERFILL PREVENTION DEVICE SET POINT - 95% (HIGH LEVEL TO WHICH A <br />0 10` 20' PRODUCT CAN BE ADDED TO THE TANK) OR THE TANK TIGHTNESS TEST METHOD CERTIFICATION LEVEL, OR IN <br />ANOTHER METHOD THE PRODUCT LEVEL IN THE TANK IS RAISED TO THE REGULATORY LEVEL OR THE TEST <br />--- EQUIPMENT CERTIFICATION LEVEL, WHICH EVER IS HIGHER, AND THEN THE CERTIFIED VOLUMETRIC TEST IS <br />CALF- 1"= 10' CONDUCTED, THIS TEST SHALL BE FOLLOWED BY THE ULLAGE TEST METHOD, WHICH IS THIRD PARTY CERTIFIED <br />TO DETECT LEAKS FROM THE PORTION OR THE TANK WHICH DOES NOT CONTAIN LIQUID. PAYMENT OF ALL <br />APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION WITHIN 30 DAYS OF <br />THE FINAL INSPECTION. <br />Barghausen <br />Consulting Engineers, Inca <br />Coo <br />a i <br />00 <br />OZ <br />D/28/2 1 <br />m <br />17 <br />0 <br />Lul <br />V) <br />z <br />Z <br />Ld <br />0 <br />Ld <br />1= <br />U <br />C) <br />Ld <br />f� <br />tfi <br />0 <br />L <br />a <br />ca <br />Z <br />0 <br />(D <br />0 <br />Project #: 20996 <br />Store , 00852 <br />chi <br />=e <br />G-) <br />Designed <br />By. <br />N TP <br />Drawn By, <br />NTP <br />Checked <br />By. <br />OV <br />Date: <br />- <br />6-10-2021 <br />a <br />J <br />Scale: <br />' <br />® <br />o <br />Disk File: <br />Model: <br />Ores: <br />c' <br />4919 EVERGREEN WAY <br />EVERETT, WA 98203 <br />r� <br />UNDERGROUND TALK <br />AND PIPING SITE PLAN <br />Q0 <br />ming No.. <br />ry <br />Tj <br />d <br />0 <br />0 <br />cv <br />s <br />