Laserfiche WebLink
E O <br /> CONSTRUCTION STIMATEF PROBABLE COSTS <br /> SITTS & HILL ENGINEERS, INC. <br /> DATE: May 14, 2019 CIVIL • STRUCTURAL • SURVEYING <br /> ESTIMATE BY: VMS <br /> STATUS: Permit Resubmittal - : <br /> JOB No.: 17,754 <br /> PROJECT: RAILWAY AVENUE IMPROVEMENTS, EVERETT,WA <br /> ITEM DESCRIPTION Qty. Unit Unit Price Sub-Total <br /> CONSTRUCTION PREPARATION <br /> Mobilization 1 L_S $25,000 $25,000 <br /> (main Civil related work) <br /> Construction staking/layout 1 LS $31,000 $31,000 <br /> TESC <br /> Maintain TESC Measures 1 LS $20,000 $20,000 <br /> Temporary stockpile protection 1 LS $5,000 $5,000 <br /> Catch Basin Protection and Cleaning 13 EA $500 $6,500 <br /> (existing off-site &proposed) <br /> Silt Fencing 7400 LF $5 $37,000 <br /> Vegetation and Topsoil Strippings and Haul Offsite 3,300 SY $4 $13,200 <br /> (assume 6"depth) <br /> Dewatering 1 LS $150,000 $150.000 <br /> (assume wellpoints in use for a month) <br /> NPDES Related Fees - Not Included <br /> SUB-TOTAL(this page)= $287,700 1 <br />