My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-17
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2023 8:23:59 AM
Creation date
2/17/2023 8:17:12 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATECONSTRUCTION OF PROBABLECOSTS <br /> SITTS & HILL ENGINEERS, INC. <br /> DATE: May 14, 2019 CIVIL • STRUCTURAL • SURVEYING <br /> ESTIMATE BY: VMS <br /> STATUS: Permit Resubmittal <br /> JOB No.: 17,754 <br /> PROJECT: RAILWAY AVENUE IMPROVEMENTS, EVERETT,WA <br /> ...,. r <br /> ITIuSCRIPTION Qty. Unit Unit Price Sub-Total <br /> DEMOLITION <br /> Remove asphalt pavement 270 SY $11 $2,970 <br /> Remove storm piping 350 LF $33 $11,550 <br /> Catch basin removal 3 EA $500 $1,500 <br /> Remove Fencing 270 LF $5 $1,350 <br /> Remove Concrete Debris 270 CY $75 $20,250 <br /> Remove Force Main Piping 270 LF $19 $5,130 <br /> Remove Rail and Ties 150 LF $14 $2,100 <br /> Remove Water Vaults 1 LS $9,000 $9,000 <br /> Remove Water Piping 290 LF $38 $11,020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.