Laserfiche WebLink
ESTIMATE OF PROBABLE <br /> CONSTRUCTION COSTS <br /> SITTS & HILL ENGINEERS, INC. <br /> DATE: May 14, 2019 CIVIL • STRUCTURAL ■ SURVEYING <br /> ESTIMATE BY: VMS <br /> STATUS: Permit Resubmittal <br /> JOB No.: 17,754 <br /> PROJECT: RAILWAY AVENUE IMPROVEMENTS, EVERETT,WA <br /> ITEM DESCRIPTION Qty. Unit Unit Price Sub-Total <br /> SITE SURFACING <br /> Heavy Duty Asphalt Pavement Section 6,000 SY $38 $228,000 <br /> (4"HMA over 6"CSBC over 6"Gravel) <br /> Sidewalk 986 LF $35 $34,510 <br /> (6'Wide) <br /> Concrete Curb and Gutter 986 LF $15 $14,790 <br /> Gravel Surfacing 950 SY $6 $5,700 <br /> Asphalt Wedge Curb 100 LF $3 $300 <br /> Pavement Markings 1590 LF $1 $1,590 <br /> Erosion Control Hydro-Seeding and Topsoil 3100 SY $10 $31,000 <br /> SUB-TOTAL(this page) r $315,890 <br />