Laserfiche WebLink
ESTIMATE OF PROBABLE <br /> CONSTRUCTION COSTS <br /> SITTS & HILL ENGINEERS, INC. <br /> DATE: May 14, 2019 CIVIL ■ STRUCTURAL ■ SURVEYING <br /> ESTIMATE BY: VMS <br /> STATUS: Permit Resubmittal <br /> JOB No : 17,754 <br /> PROJECT: RAILWAY AVENUE IMPROVEMENTS, EVERETT,WA <br /> EM DESCRIPTION Qty. Unit Unit Price Sub-Total <br /> WATER AND FIRE PROTECTION SYSTEM IMPROVEMENTS <br /> New Fire Hydrant Assembly with 6" Gate Valve 3 EA $11,500 $34,500 <br /> 12" DIP 2503 LF $150 $375,450 <br /> 2" Copper Tubing 63 LF $50 $3,150 <br /> 1-1/2" Copper Tubing 21 LF $35 $735 <br /> Fire Water Fitting 14 EA $1,300 $18,200 <br /> (includes thrust block&restrained joints) <br /> Fire Water Gate Valve 7 EA $5,600 $39,200 <br /> (includes thrust block&restrained joints) <br /> Fire Meter and Vault 2 $40,000 $80,000 <br /> Water Connection 3 EA $1,500 $4,500 <br /> 2" Meter and Vault 3 EA $4,000 $12,000 <br /> 1-1/2" Meter and Vault 1 EA $3,800 $3,800 <br /> Pressure Testing 1 LS $2,500 $2,500 <br /> SUB-TOTAL (this page) r $574,035 1 <br />