My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4937 EVERGREEN WAY QFC FUELING STATION Geotech Report 2023-02-17
>
Address Records
>
EVERGREEN WAY
>
4937
>
QFC FUELING STATION
>
Geotech Report
>
4937 EVERGREEN WAY QFC FUELING STATION Geotech Report 2023-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2023 9:02:42 AM
Creation date
2/17/2023 8:30:03 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4937
Tenant Name
QFC FUELING STATION
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> I I MI <br /> RILEYGROUP ,... <br /> January 7, 2020 <br /> Mr. Brian Peterson <br /> The Kroger Co. <br /> 3701 South Norfolk Street,Suite 301 <br /> Seattle, Washington 98115 <br /> Subject: Geotechnical Engineering Report <br /> QFC 852 Fuel Station <br /> 4919 Evergreen Way <br /> Everett,Washington 98203 <br /> RGI Project No.2019-258A <br /> Dear Mr. Peterson: <br /> As requested,The Riley Group, Inc. (RGI) has prepared this Geotechnical Engineering Report(GER) <br /> for the above-referenced site. Our services were completed in accordance with our proposal <br /> PRP2019-272A dated December 4, 2019 and authorized by The Kroger Co. on December 6, 2019. <br /> The information in this GER is based on our understanding of the proposed construction, and the <br /> soil and groundwater conditions encountered in the borings completed by RGI at the site on <br /> December 18, 2019. <br /> RGI recommends the project plans and specifications be submitted for a general review so that <br /> RGI may confirm that the recommendations in this GER are interpreted and implemented <br /> properly in the construction documents. RGI also recommends that a representative of our firm <br /> be present on site during portions of the project construction to confirm that the soil and <br /> groundwater conditions are consistent with those that form the basis for the engineering <br /> recommendations in this GER. <br /> If you have any questions or require additional information, please contact us. <br /> Respectfully submitted, <br /> THE RILEY GROUP,INC. <br /> �e of Wash/ <br /> RUNQr <br /> w� /o Grp As w`11,c <br /> ,� A it�J�i,�` dir 0) �v r�, fl <br /> -A <br /> Onyttr---::,`-7- �1 0 , ` / <br /> V06) 2698 ;may / ,�, ► <br /> ) �° /�Zoeo �f° �,35013 : ,Ec <br /> S Ge° A, cisisR <br /> aft - <br /> SStONAL D <br /> ERIC L. WOODS / 7/24,iv <br /> Eric L. Woods, LG Ricky R. Wang, PhD, PE <br /> Project Geologist Principal Engineer <br /> Corporate Office <br /> 17522 Bothell Way Northeast <br /> Bothell,Washington 98011 <br /> Phone 425.415.0551• Fax 425.415.0311 <br /> www.riley-group.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.