Laserfiche WebLink
Geotechnical Engineering Report i January 7,2020 <br /> QFC 852 Fuel Station,Everett, Washington RGI Project No.2019-258A <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION 1 <br /> 2.0 PROJECT DESCRIPTION 1 <br /> 3.0 FIELD EXPLORATION AND LABORATORY TESTING 1 <br /> 3.1 FIELD EXPLORATION 1 <br /> 3.2 LABORATORY TESTING 2 <br /> 4.0 SITE CONDITIONS 2 <br /> 4.1 SURFACE 2 <br /> 4.2 GEOLOGY 2 <br /> 4.3 Solis 2 <br /> 4.4 GROUNDWATER 2 <br /> 4.5 SEISMIC CONSIDERATIONS 3 <br /> 4.6 GEOLOGIC HAZARD AREAS 4 <br /> 5.0 DISCUSSION AND RECOMMENDATIONS 4 <br /> 5.1 GEOTECHNICAL CONSIDERATIONS 4 <br /> 5.2 EARTHWORK 4 <br /> 5.2.1 Erosion and Sediment Control 4 <br /> 5.2.2 Excavations 5 <br /> 5.2.3 Stripping and Site Preparation 6 <br /> 5.2.4 Structural Fill 6 <br /> 5.3 UST EXCAVATION AND BACKFILL 8 <br /> 5.4 FOUNDATIONS 9 <br /> 5.5 RETAINING WALL 9 <br /> 5.6 SLAB-ON-GRADE CONSTRUCTION 10 <br /> 5.7 DRAINAGE 10 <br /> 5.7.1 Surface 10 <br /> 5.7.2 Infiltration 11 <br /> 5.8 UTILITIES 11 <br /> 5.9 PAVEMENTS 11 <br /> 6.0 ADDITIONAL SERVICES 12 <br /> 7.0 LIMITATIONS 12 <br /> LIST OF APPENDICES <br /> Figure 1 Site Vicinity Map <br /> Figure 2 Geotechnical Exploration Plan <br /> Figure 3 Retaining Wall Drainage Detail <br /> Appendix A Field Exploration and Laboratory Testing <br /> 1- <br /> RILEYGROUP <br />