Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through this project's Public Works <br />Reviewer Abiy Tsegaye with City of Everett Permit Services (ATsegaye@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />basin or area drain that is open to the ground surface is <br />acceptable; this ensures that air from the downspout is not <br />pushed into the downstream conveyance system. <br />Submit maintenance covenant, per DCSS 6-10.1(2). <br />In Utility Plan, Sheet C6.0, revise alignment of water line around <br />fueling pad to not encroach into the existing sewer easement. <br />• <br />Pale 3 of 3 <br />