Laserfiche WebLink
• <br />• <br />2022 System Development Fee Calculations <br />Permit #: PW2111-007 <br />Additional Notes: <br />Project Address: 4937 Evergreen Way (4919 Evergreen) <br />Project Name. QFC Fueling Station <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: Abiy Tsegaye Date: 4/8/2022 <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />lReviewed By: Date: <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />*Subject to Administrative Guidelines Proposed Building Use: Gas Station w/o Service Bay Previous Bldg Use #1: No Other Use Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposedUnit Measure: Flat Rate Unit Measure for Use #1: - None Unit Measure for Use #2: - None <br />Unit Measure for Use #3: <br />- lNone <br />Note: Meter Size Used for Proposed Meter Size: 3/4" Credited Meter #1 Size: None Credited Meter #2 Size: None <br />Credited Meter #3 Size: <br />None <br />Calculation Water Fee: $4,311.00 Water Credit #1: $0.00 Water Credit #2: $0.00 <br />Water Credit #3: <br />$0.00 <br />Sewer Fee: $5,580.00 Sewer Credit #1: $0.00 Sewer Credit #2: $0.00 <br />Sewer Credit #3: <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$4,311.00 <br />This fee reflects credit for existing water meter <br />$S,S80.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />Total: $9,891.00 <br />Irrigation Meter: Fee Calculation (Before Credit): Credit Calculations: <br />Proposed Meter Size: None Credited Meter Size: None <br />Water Fee: $0.00 Water Credit: $0.00 <br />No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br />Total: $0.00 <br />Fire Meter: Proposed Meter Size: <br />None <br />I For informational purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />IFire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit #: B2111-008 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: SF <br />Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit <br />Permit #: PW2111-007 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: 22,740 SF <br />Stormwater System Dev Fee: $6,089.77 Add this fee to the Public Works Permit <br />