Laserfiche WebLink
Permit #: PW2111-007 <br />Additional Notes: <br />Project Address: 4937 EVERGREEN WAY <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: QFC FUEL STATION <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />�a ei n�i. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: Abiy Tsegaye Date: 6/6/2022 <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: B2111-008 Type of Construction: Existing Development Adding <br />New +Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />- SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2111-007 Type of Construction: Existing Development Adding <br />New +Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />22,740 SF <br />Stormwater System Dev Fee: <br />$6,089.77 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />2022 Stormwater System Development Fee Calculations <br />�a <br />e�:eo.o.eii.v,o.u.�.,m�i..�e,on na.a:..na<eres�waiea or Building <br />ns (Required): <br />• <br />• <br />