Laserfiche WebLink
�F\ <br />rE1_ <br />2 3 4 5 6 7 8 <br />{ <br />FIRST FLOOR HVAC PLAN <br />1" = 20'-0" <br />HVAC GENERAL NOTES <br />1. DRAWING IS INTENDED TO PROVIDE A GUIDELINE FOR THE EXTENT OF NEW WORK REQUIRED. CONTRACTOR <br />SHALL BE RESPONSIBLE FOR FIELD MEASUREMENTS AND COORDINATION WITH ALL STRUCTURES, UTILITIES <br />AND FIRE PROTECTION. CONTRACTOR SHALL VISIT THE SITE AND FIELD VERIFY THE EXTENT OF NEW WORK <br />PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL NOTIFY ENGINEER OF RECORD OF ANY CHANGES <br />REQUIRED FOR PROPER INSTALLATION AND OPERATION OF THE AFFECTED MECHANICAL SYSTEMS. <br />2. ALL WORK SHALL COMPLY WITH 2O18 INTERNATIONAL MECHANICAL CODE WITH WASHINGTON AMENDMENTS <br />AND 2018 WASHINGTON STATE ENERGY CODE. <br />3. SEE CIVIL, ARCHITECTURAL, STRUCTURAL, GENERAL ARRANGEMENT, AND ELECTRICAL PLANS FOR <br />DIMENSIONED LOCATION OF BUILDING, UTILITY PIPING, AND EQUIPMENT ITEMS REFERENCED ON THIS SHEET. <br />4. CONTRACTOR SHALL PROVIDE START-UP AND COMMISSIONING FOR CONTRACTOR -INSTALLED EQUIPMENT TO <br />ENSURE PROPER OPERATION IN COMPLIANCE WITH MANUFACTURER'S REQUIREMENTS AND DESIGN <br />DOCUMENTS FOR THIS PROJECT, <br />5. CONSULT OWNER REGARDING SITE ACCESS, WORK SCHEDULE, AND MATERIAL DISPOSAL. <br />6. INCLUDE CUTTING, PATCHING AND RESTORATION OF FINISHES NECESSARY FOR THIS WORK. SURFACES <br />DAMAGED BY THIS WORK AND SPACES AROUND DUCTWORK PASSING THROUGH FLOORS AND WALLS SHALL <br />BE NEATLY PATCHED AND FINISHED TO MATCH THE ADJACENT CONSTRUCTION, INCLUDING PAINTING AND <br />OTHER FINISHES <br />7. PROVIDE CONTROL WIRING, INSTRUMENTATION, AND CONTROLLERS SHOWN ON HVAC FLOW DIAGRAMS. <br />PROVIDE HVAC SYSTEM CONTROLS DESIGN, INSTALLATION, PROGRAMMING, AND COMMISSIONING, <br />PERFORMED BY A CERTIFIED CONTROLS SUB -CONTRACTOR. COMMISSIONING PER WASHINGTON ENERGY <br />CODE SECTION C408 IS REQUIRED FOR ALL APPLICABLE MECHANICAL SYSTEMS. INCLUDE GENERAL SUMMARY <br />WITH A MINIMUM OF ITEMS 1 THRU 4 OF THE COMMISSIONING PLAN PER C408.1.2 INCLUDING: NARRATIVE <br />DESCRIPTION OF ACTIVITIES, RESPONSIBILITIES OF THE COMMISSIONING TEAM, SCHEDULE OF ACTIVITIES <br />INCLUDING VERIFICATION OF PROJECT CLOSE OUT DOCUMENTATION PER C103.6, AND CONFLICT OF INTEREST <br />PLAN (IF REQUIRED). INCLUDE IN GENERAL SUMMARY THAT A COMMISSIONING PROJECT REPORT OR <br />COMPLIANCE CHECKLIST SHALL BE COMPLETED BY THE CERTIFIED COMMISSIONING PROFESSIONAL AND <br />PROVIDED TO THE OWNER PRIOR TO THE FINAL MECHANICAL INSPECTION. <br />8. INDUSTRIAL CONTROL PANELS, HVAC UNITS, ELEVATOR CONTROL PANELS, EMERGENCY SYSTEM TRANSFER <br />SWITCHES, AND OTHER APPLICABLE ELECTRICAL APPARATUS SHALL BE MARKED AND HAVE DOCUMENTATION <br />STATING THE INTERRUPTING RATING (IR) OF THE APPARATUS, WHICH SHALL BE GREATER THAN THE <br />CALCULATED AVAILABLE FAULT CURRENT (AIC) RATING INDICATED SUCH THAT THE EQUIPMENT IS DESIGNED <br />TO SAFELY HANDLE PER NATIONAL ELECTRICAL CODE (NEC) ARTICLES 110.3, 110.9 AND 110.10. <br />9. PROJECT CLOSE OUT DOCUMENTATION AND TRAINING OF BUILDING OPERATIONS PERSONNEL IS REQUIRED <br />FOR ALL MECHANICAL COMPONENTS, EQUIPMENT, AND SYSTEMS GOVERNED BY THE WASHINGTON ENERGY <br />CODE. CLOSE OUT DOCUMENTATION SHALL INCLUDE: RECORD DOCUMENTS, O&M MANUALS, APPLICABLE <br />WSEC COMPLIANCE FORMS AND CALCULATIONS. <br />KEYNOTES <br />OCARBON MONOXIDE/NITROGEN DIOXIDE DETECTORS. EACH ANALYTICAL INSTRUMENT TRANSMITTER (AIT) <br />CONSISTS OF AN INTEC CONTROLS MODEL DT6 WITH CO AND NO2 DETECTORS OR APPROVED EQUALS. <br />DETECTORS TO BE WIRED SO THAT ALL EXHAUST FANS RAMP UP TOGETHER. CO DETECTORS SHALL BE <br />LISTED PER UL 2075 AND INSTALLED IN ACCORDANCE WITH THEIR LISTING AND THE MANUFACTURER'S <br />INSTRUCTIONS. MOUNT AT 5'-0" AFF. <br />PROVIDE ONE (1) INTEC CONTROLS MODEL DGC6 CONTROLLER FOR EVERY 48 AITs. SEE CONTROLS DEVICE <br />LIST ON SHEET MO.10 FOR EXHAUST FAN CONTROLS. MOUNT ON COLUMN AT 5'-0" AFF. COORDINATE <br />LOCATION WITH CM. <br />VAA, LLC 763.559.9100 <br />2300 Berkshire Lane N, Suite 200 www.vaaeng.com <br />Plymouth, MN 55441 <br />WA Firm Reoistration No. 3035 <br />1 <br />NOTICE THE DESIGN SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL <br />DRAWINGS, DETAILS. DEVELOPMENTS. GRAPHICS AND MODELS THEREOF, ARE THE <br />EXCLUSIVE PROPERTY OF VAA LLC, AND CAN'T BE COPIED, DUPLICATED, REPRODUCED <br />OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOR CAN ANY DERIVATIVE <br />WORK BE MADE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, LLC: <br />COPYRIGHT VAA, LLC 2020 - ALL RIGHTS RESERVED. <br />DSE4_E1 <br />6611 ASSOCIATED BLVD. <br />EVERETT, WA 98203 <br />LLJ <br />2 <br />LU <br />• <br />ry <br />F- <br />0 <br />Z <br />< <br />Uj <br />F- <br />U) <br />ry <br />Uj <br />w <br />1>1111 <br />0 <br />Uj <br />rn cv) <br />U) <br />W <br />. <br />C) c) <br />IN <br />w •• <br />Q <br />• <br />F- <br />1 <br />0�: <br />0wo <br />- <br />< <br />W <br />< W <br />75 <br />> <br />�:w <br />< <br />•• <br />REVISION 0 DATE <br />ISSUED FOR PERMIT 0 05/05/21 <br />05/05/2021 <br />JOB NUMBER <br />205013 <br />DRAWN BY CHECKED BY <br />ASH VJD <br />SHEET TITLE <br />FIRST FLOOR HVAC PLAN <br />SHEET NUMBER <br />M 1 1. 10 <br />