Laserfiche WebLink
1.2 - Proposed Construction Activities <br /> Description of site development: <br /> The final built-out, developed condition for the project site will consist of a driveway, a trail, <br /> concrete pavement, lawn areas, a parking lot, a future building for restrooms, and a picnic <br /> shelter. The west side of the parking lot, the restrooms building, and picnic shelter are to be <br /> constructed by the City of Everett in a future phase. <br /> Description of construction activities: <br /> Construction activities include site preparation, TESC installation, grade and fill, trenching and <br /> excavation for utility and building foundation installation, building construction, and asphalt and <br /> concrete paving. <br /> Description of site drainage including flow from and onto adjacent properties. Must be consistent <br /> with Site Map in Appendix A: <br /> During construction activities, the stormwater on-site will be routed to wattles in the southeast <br /> corner of the site. Catch basin inlets will be protected. The site will also have a silt fence along <br /> the perimeter to prevent sediment from leaving the site. <br /> For the developed site, runoff from the access road, parking lot, and a portion of the concrete <br /> pad sheet flows into four bioretention cells placed along the west side of the driveway. Runoff <br /> from the park entrances will be collected in catch basin structures equipped with cartridge filters <br /> to mitigate pollution generation areas. Runoff from the playground area situated at the northeast <br /> corner of the site is collected through a network of underdrains that connect to the storm drain <br /> conveyance system. Runoff from the landscaped areas to the east, the trail, and the eastern <br /> portion of the concrete pad sheet flows into a trail-side ditch for collection into catch basins <br /> placed at low points across the site. Flow from the bioretention cells, underdrains, and catch <br /> basins is conveyed by a storm drain system that is routed to SDMH No. 10008 and discharged <br /> via the city's storm outfall. <br /> Description of final stabilization (example: extent of revegetation, paving, landscaping): <br /> The site is to be predominantly occupied by a small building, new asphalt and concrete paving <br /> for parking, a pedestrian path/trail, playground equipment, and landscaping on the rest of the <br /> site. <br /> Contaminated Site Information: <br /> Proposed activities regarding contaminated soils or groundwater(example: on-site treatment <br /> system, authorized sanitary sewer discharge): <br /> No known existing contaminants at this time. <br /> Page 16 <br />