Laserfiche WebLink
SEE CONNECTION <br />TO MULLION <br />DETAIL E/2. <br />3LKG. FOR COAT <br />H001;�S 0 AFI <br />31_KG. FOR COAT <br />HOOKS A +45-63' AFF <br />31-KG FORCEILING-MTD. <br />MICRO_cCOPE, TO 3E <br />JO3 9TE LOCATED, <br />TYP. OPS #1- #3 <br /><C <br />20 2 ry <br />_ 8 8 <br />() I-_ <br />STAFF COUNTER <br />W <br />0 <br />:D <br />11-0 FIN, CLR.,CRITICAL <br />0 � <br />3LOCKING FOR WALL © 0 <br />MOUNTED MONITOR , <br /><< <br />-<_ <br />ORY 1 <br />H <br />I <br />= #2 e� <br />,I u <br />2 c <br />V D_ <br />19 3LKG. FOR LEAP I <br />g AFEON HANGED,-- <br />TYP. Ca) <br />9+36-48 AFF. � -' DLL <br />G. FOP LEAP <br />5 AP <br />C(b 4 <br />.Oi d HANGER <br />36-48" AFF.- <br />O <br />3LOCKLNG FOR WALL <br />MOUNTED MONITOR <br />r,-- <br />OFERATOF�Y----, <br />o <br /># <br />JI <br />r1 <br />-� <br />-i) <br />19 3LKG FOR <br />LEAD APRON <br />g HANGER <br />+36-48" AFF. <br />O <br />3 <br />ire, <br />C19 <br />-OFERATORY <br />Il � <br />#1 <br />_F ---- <br />3LKG-.FOR FLOCK NALL <br />LEAD APRON i JTED M0111 Lop <br />HAF 3LKG. FORCOAT <br />@ +36-48" AFF. 1-I00KS Cad +45-67J' AFF.- <br />SEMI-RECE55ED <br />SEMI -RECESSED <br />T.F PISP. RECESSED <br />P.T. DISD. <br />SEAT COVER <br />1)I5D. <br />5-6„ <br />O <br />---- <br />l <br />F-- <br />- - - - <br />- - ------ <br />I <br />- - <br />_STFO0Nj <br />- --- <br />l <br />#1 <br />STERI <br />�' TION <br />I <br />ua <br />LLi <br />2 <br />0-,C3 <br />� <br />` <br />Q� <br />3LKG FOR GRA3 <br />"FL <br />s <br />1/2"GLASS A (4) 2x4 BUNDLED <br />ALIGN W/HEADS STUD POST, (2) l_®C NITO, g7 3/Sl <br />SEE DETAIL F/2. TO 3E JO 51 PTED <br />-3LKG. FOR PAN <br />TO 3E JO3 SITE 17 <br />LOCATED 3Y 54 <br />DENT INTERIOR PARTITION <br />w � <br />MI[ ' 1EN. WALL. TO BE EXTENDED �� N <br />TO BEARING POST <br />LOCATION (RED SHADE) - <br />il <br />Alternate Beam: <br />5 114" x 11-7/8" <br />14 2.2E Parallam PSL <br />7 Q <br />j F3USINESS I <br />_3vz° <br />ROOF FRAMING)IONING FLAN, 15t FLOOR\ <br />Ff�AMING PIMENSIONING FLAN, 13ASEMENT <br />SCALE: 1/4'1=11 _011 <br />M <br />-2X6WALL <br />CONSTRUCTION <br />DLKG FOR NG MTD. L <br />MONII OE 3P,F\CKETS, <br />TO 3E JOB SITE <br />LOCATED, TYr. ALIT <br />PRODURE ROO S <br />I <br />a <br />RROCEDURE <br />CV <br />L�ylfa <br />I-- <br />cn <br />LU <br />(n <br />tit <br />f-- <br />C� <br />O <br />I. <br />13 � <br />�CLK., <br />R O D�eF <br />OOM #1 <br />co I <br />Lu I <br />-, <br />Lij <br />I <br />I <br />I <br />I <br />-3LKG. FOE CEILING MILD. <br />MONITOR 3RACL ETS, <br />TO 3E JOE SITE <br />LOCPTED,T Y P. ALL I <br />PRGY.EDURE DOOMS I <br />DN <br />DN <br />CAC SCCULE <br />EXISTING- EXTERIOR WALLS <br />NEW INTERIOR PARTITION <br />EXISTING INTERIOR PARTITION TO REMAIN <br />ONE HOUR RATED ENCLOSURE <br />INFILL AT REMOVED WINPOW5 <br />FRAMING- 13LOCKING <br />FE� FIRE EXTINGUISHER <br />(Type IIA-105 in Rce(,-55ed Cabinet) <br />ROOM #3 Y L� <br />2 <br />I- <br />EXISTING CONCRETE <br />PAD- 7'-01, D X,11-0"W <br />T7I <br />I I <br />I <br />I I <br />I <br />I <br />I <br />I <br />II I <br />I <br />I I <br />I I <br />I I <br />4Ff <br />3 3' FIN. CLR, CRITICAL <br />RROCEDURE <br />ROOM #2 <br />I I <br />A �4 <br />-31_KG. FOP, CEILING MTD. <br />MONITOR 3RACKET5, <br />TO 3E J05 SITE I <br />LOCATED, TYP, ALL <br />PROCEDUEE ROOMS <br />i <br />2 <br />L Er <br />DN <br />C) F\/. ', irk ',_ tNF0F_<\MA1__10N DY P113[31_E_ <br />E N (_D't N E- E K 1, N G A P 1) ED I [\�, R­. E <br />GENERAL CONSTRUCTION NOTES <br />i. The design and specifications shown herein illustrate our design intent. We <br />welcome all input on potential product substitutions or alternate ways of <br />doing things that could save time and/or cost. <br />2. Submittals for cabinet shop drawings (including PVC edgebanding), paint and <br />wood -stain drawdowns are required for review by Designer. For all other <br />items, no submittal is required when there is no substitute to that which is <br />specified on these plans. Only provide submittals for those items that are <br />different from what is noted on these plans. <br />�. Contractor shall verify filed dimensions after demolition and report any <br />discrepancies to Designer before proceeding. DO NOT SCALE THESE <br />DRAWINGS FOR CRITICAL DIMENSIONS. Use dimensions given. <br />4. Building a dental facility requires attention to detail. It is expected that a high <br />degree of attentiveness will be delivered throughout. <br />�. Any items or surfaces which are unspecified as to dimensions, material and/or <br />color are to be brought to the Designer's attention before proceeding with <br />making that selection arbitrarily. <br />6. All items shown or specified on these plans shall be provided and installed by <br />the General or appropriate Sub -Contractor, unless noted otherwise. <br />7. New construction shall conform to International Building Code, 2018 Edition, <br />min. requirements for a Type V-B, non-sprinklered construction throughout a <br />Business Group B occupancy. <br />8. General Contractor shall remove existing window coverings prior to <br />demolition, clean, and re -install after all work in the Suite has been completed. <br />9. General Contractor to leave all plastic coverings on troffers until heating <br />system has been blown out. <br />io. All installed flooring and counters should be fully covered until all construction <br />is completed. <br />11. General Contractor shall thoroughly clean the entire suite, including interior <br />face of exterior windows, after all disciplines are completed with work, and <br />prior to Client move -in. <br />12. Design of new or relocation of existing HVAC by Sub -Contractor. Insulate <br />mechanical supply ducts with batting or duct board. Maximum 12' flex duct <br />runs. Minimum (4) zones. All thermostat locations must be verified <br />w/Designer, or may need to be relocated. Design must be submitted to <br />Designer for review before supplies and returns are roughed -in. <br />13. If ceiling cavity is a return -air plenum, all trades working in plenum must <br />meet all applicable codes. A sound boot is required in all plenum -rated return - <br />air grilles. <br />14. Where required, provide smoke detectors to code. Provide fire extinguisher in <br />recessed cabinet located as indicated on Sheets 1 & 3. Paint metal cabinet to <br />match partitions. <br />1.5. Typical partition construction: 1-1/2" x 3-1/2" metal studs (16" o.c.) with 5/8" <br />Type 'X' GWB each side. Smooth partition, no texture. See Detail B/2. <br />Extend partitions to structure, hang GWB ceiling at +7'-7" (existing height) <br />above finished floor unless otherwise noted. See Detail D/2 for one hour rated <br />enclosures at Mechanical Room in Basement and J/2 for Nitrous Closet <br />outside. <br />16. Insulate all partitions with sound attenuation batting per Details B/2 and A/2. <br />1.7. Plumbing partitions with toilet drains are shown as 2X6 construction. <br />18. X-rays and Panelipse typically require framing blocking to vvithstand 1500# <br />torque. Verify blocking requirements and locations with Dental Technician. <br />19. Line all walls of Cone Beam enclosure with an additional layer of 5/8" GWB <br />for scatter protection. <br />20. General Contractor to provide backing for all partition -hung cabinets as <br />required by Cabinetmaker. General Contractor to provide i" square tubular <br />steel 'L' brackets for unsupported countertops, attached to framing. See <br />Detail I/2. Suggested locations for counter supports are noted on Elevation <br />views. Verify heights, locations, gauge, and weight requirements with <br />Cabinetmaker. Painter to paint any exposed supports to match partition. <br />21. Cabinetmaker to use on -site field framing dimensions for all fabrications. <br />22. Dental Technician and Operatory Cabinetmaker shall work with Contractor <br />and Sub -Contractors on exact locations and specific requirements for dental <br />equipment. Appropriate parties should be asked to provide templates for <br />locations of all stub -outs and blocking points for dental equipment. General <br />Contractor to coordinate on -site layout meeting between Cabinetmaker, <br />Plumber and Electrician when partitions have been chalked. <br />Dental Equipment Technician: To Be Determined <br />Microscope Equipment Technician: T.B.D. <br />Operatory Cabinetmaker: T.B.D. <br />22. General Contractor to contact the following parties when partitions are open <br />to receive wiring: <br />Telephone: To Be Determined <br />Computer: T.B.D. <br />Sound System: T.B.D. <br />Communication Svstem: T.B.D. <br />24. For bidding purposes only, this facility should be considered a Level 3 for <br />Operatories #1 - #3 and Level 2 for Procedure Room #1 - #3, as defined by the <br />2018 NFPA-99. Upon award of the contract, the General Contractor must <br />confirm the level required for this practice with the 3rd-Party Verifier and the <br />Doctor before proceeding with the design and construction of the systems. <br />2.5. Nitrous/Oxide Tank Storage Rooms (and Mechanical Rooms for Category 1 <br />facilities): Must be 1-hour construction and meet venting requirements of <br />2018 International Fire Code, Section 53o6: See Detail J/2; and requirements <br />of the 2018 NFPA-99. Depending on the level of verification required for this <br />practice, additional requirements for the construction of the enclosures, types <br />of equipment and uninterrupted power supply may be required. All <br />requirements are to be determined by a certified 3rd-Pa1tt VerifieV.Vrdi®x�to. <br />Y UP ETT <br />mnsl lefi.0r1. _ <br />REVIEW FOR PERMIT <br />Medical gas systems and dental vacuum lines require wet -stamped drawings <br />and verification by a certified 3rd-Party Verifier according to the requirements <br />of the State code and 2oi8 NFPA-99. these systems must meet the <br />requirements of NFPA-99 for the level of verification required based on the <br />practice requirements as defined by 2018 NFPA-99. Early planning and <br />coordination between Verifier, Plumber, Dental Technician and Doctor is <br />required to confirm the level of verification required for the Med Gas and <br />Vacuum systems. The General Contractor or Plumbing Sub -Contractor is <br />responsible to establish this relationship and determine all requirements prior <br />to construction. Outlets and locations noted on these plans should be <br />considered general information as the design must be drawn by the Plumber <br />and verified by the 3rd-Party Verifier g�ri €�1 t�cc�ntrLctic��1. <br />26. Provide solid framing blocking behind ceiling -mounted Operatory track light <br />per manufacturer's specifications. Bracing to be mounted behind GWB ceiling <br />and secured to building structure. <br />27. Provide blocking for Lead Apron Racks in Operatories and Panelipse Room, <br />where noted. <br />28. Height differences between flooring materials shall bevel at a ratio of 1:2 if <br />greater than 1 /4" per ADA and accessibility codes. <br />29. Insulate Mechanical Room on all partitions and inside of door with Armstrong <br />#741, 12"x12" Fine Fissured T&G Ceiling Tile (or equal sound rating) - <br />adhesive installation. <br />2o. Safety glass installed where required per 2018 IBC, Chapter 24, Section 24o6. <br />31. Identification signage provided and installed by others. <br />+ E.0) <br />0 <br />co_ <br />_ M .0 <br />- FRAMING CAN <br />- WALL CHCULE <br />- GENERAL CONSTK <br />NOES <br />