|
SEE CONNECTION
<br />TO MULLION
<br />DETAIL E/2.
<br />3LKG. FOR COAT
<br />H001;�S 0 AFI
<br />31_KG. FOR COAT
<br />HOOKS A +45-63' AFF
<br />31-KG FORCEILING-MTD.
<br />MICRO_cCOPE, TO 3E
<br />JO3 9TE LOCATED,
<br />TYP. OPS #1- #3
<br /><C
<br />20 2 ry
<br />_ 8 8
<br />() I-_
<br />STAFF COUNTER
<br />W
<br />0
<br />:D
<br />11-0 FIN, CLR.,CRITICAL
<br />0 �
<br />3LOCKING FOR WALL © 0
<br />MOUNTED MONITOR ,
<br /><<
<br />-<_
<br />ORY 1
<br />H
<br />I
<br />= #2 e�
<br />,I u
<br />2 c
<br />V D_
<br />19 3LKG. FOR LEAP I
<br />g AFEON HANGED,--
<br />TYP. Ca)
<br />9+36-48 AFF. � -' DLL
<br />G. FOP LEAP
<br />5 AP
<br />C(b 4
<br />.Oi d HANGER
<br />36-48" AFF.-
<br />O
<br />3LOCKLNG FOR WALL
<br />MOUNTED MONITOR
<br />r,--
<br />OFERATOF�Y----,
<br />o
<br />#
<br />JI
<br />r1
<br />-�
<br />-i)
<br />19 3LKG FOR
<br />LEAD APRON
<br />g HANGER
<br />+36-48" AFF.
<br />O
<br />3
<br />ire,
<br />C19
<br />-OFERATORY
<br />Il �
<br />#1
<br />_F ----
<br />3LKG-.FOR FLOCK NALL
<br />LEAD APRON i JTED M0111 Lop
<br />HAF 3LKG. FORCOAT
<br />@ +36-48" AFF. 1-I00KS Cad +45-67J' AFF.-
<br />SEMI-RECE55ED
<br />SEMI -RECESSED
<br />T.F PISP. RECESSED
<br />P.T. DISD.
<br />SEAT COVER
<br />1)I5D.
<br />5-6„
<br />O
<br />----
<br />l
<br />F--
<br />- - - -
<br />- - ------
<br />I
<br />- -
<br />_STFO0Nj
<br />- ---
<br />l
<br />#1
<br />STERI
<br />�' TION
<br />I
<br />ua
<br />LLi
<br />2
<br />0-,C3
<br />�
<br />`
<br />Q�
<br />3LKG FOR GRA3
<br />"FL
<br />s
<br />1/2"GLASS A (4) 2x4 BUNDLED
<br />ALIGN W/HEADS STUD POST, (2) l_®C NITO, g7 3/Sl
<br />SEE DETAIL F/2. TO 3E JO 51 PTED
<br />-3LKG. FOR PAN
<br />TO 3E JO3 SITE 17
<br />LOCATED 3Y 54
<br />DENT INTERIOR PARTITION
<br />w �
<br />MI[ ' 1EN. WALL. TO BE EXTENDED �� N
<br />TO BEARING POST
<br />LOCATION (RED SHADE) -
<br />il
<br />Alternate Beam:
<br />5 114" x 11-7/8"
<br />14 2.2E Parallam PSL
<br />7 Q
<br />j F3USINESS I
<br />_3vz°
<br />ROOF FRAMING)IONING FLAN, 15t FLOOR\
<br />Ff�AMING PIMENSIONING FLAN, 13ASEMENT
<br />SCALE: 1/4'1=11 _011
<br />M
<br />-2X6WALL
<br />CONSTRUCTION
<br />DLKG FOR NG MTD. L
<br />MONII OE 3P,F\CKETS,
<br />TO 3E JOB SITE
<br />LOCATED, TYr. ALIT
<br />PRODURE ROO S
<br />I
<br />a
<br />RROCEDURE
<br />CV
<br />L�ylfa
<br />I--
<br />cn
<br />LU
<br />(n
<br />tit
<br />f--
<br />C�
<br />O
<br />I.
<br />13 �
<br />�CLK.,
<br />R O D�eF
<br />OOM #1
<br />co I
<br />Lu I
<br />-,
<br />Lij
<br />I
<br />I
<br />I
<br />I
<br />-3LKG. FOE CEILING MILD.
<br />MONITOR 3RACL ETS,
<br />TO 3E JOE SITE
<br />LOCPTED,T Y P. ALL I
<br />PRGY.EDURE DOOMS I
<br />DN
<br />DN
<br />CAC SCCULE
<br />EXISTING- EXTERIOR WALLS
<br />NEW INTERIOR PARTITION
<br />EXISTING INTERIOR PARTITION TO REMAIN
<br />ONE HOUR RATED ENCLOSURE
<br />INFILL AT REMOVED WINPOW5
<br />FRAMING- 13LOCKING
<br />FE� FIRE EXTINGUISHER
<br />(Type IIA-105 in Rce(,-55ed Cabinet)
<br />ROOM #3 Y L�
<br />2
<br />I-
<br />EXISTING CONCRETE
<br />PAD- 7'-01, D X,11-0"W
<br />T7I
<br />I I
<br />I
<br />I I
<br />I
<br />I
<br />I
<br />I
<br />II I
<br />I
<br />I I
<br />I I
<br />I I
<br />4Ff
<br />3 3' FIN. CLR, CRITICAL
<br />RROCEDURE
<br />ROOM #2
<br />I I
<br />A �4
<br />-31_KG. FOP, CEILING MTD.
<br />MONITOR 3RACKET5,
<br />TO 3E J05 SITE I
<br />LOCATED, TYP, ALL
<br />PROCEDUEE ROOMS
<br />i
<br />2
<br />L Er
<br />DN
<br />C) F\/. ', irk ',_ tNF0F_<\MA1__10N DY P113[31_E_
<br />E N (_D't N E- E K 1, N G A P 1) ED I [\�, R. E
<br />GENERAL CONSTRUCTION NOTES
<br />i. The design and specifications shown herein illustrate our design intent. We
<br />welcome all input on potential product substitutions or alternate ways of
<br />doing things that could save time and/or cost.
<br />2. Submittals for cabinet shop drawings (including PVC edgebanding), paint and
<br />wood -stain drawdowns are required for review by Designer. For all other
<br />items, no submittal is required when there is no substitute to that which is
<br />specified on these plans. Only provide submittals for those items that are
<br />different from what is noted on these plans.
<br />�. Contractor shall verify filed dimensions after demolition and report any
<br />discrepancies to Designer before proceeding. DO NOT SCALE THESE
<br />DRAWINGS FOR CRITICAL DIMENSIONS. Use dimensions given.
<br />4. Building a dental facility requires attention to detail. It is expected that a high
<br />degree of attentiveness will be delivered throughout.
<br />�. Any items or surfaces which are unspecified as to dimensions, material and/or
<br />color are to be brought to the Designer's attention before proceeding with
<br />making that selection arbitrarily.
<br />6. All items shown or specified on these plans shall be provided and installed by
<br />the General or appropriate Sub -Contractor, unless noted otherwise.
<br />7. New construction shall conform to International Building Code, 2018 Edition,
<br />min. requirements for a Type V-B, non-sprinklered construction throughout a
<br />Business Group B occupancy.
<br />8. General Contractor shall remove existing window coverings prior to
<br />demolition, clean, and re -install after all work in the Suite has been completed.
<br />9. General Contractor to leave all plastic coverings on troffers until heating
<br />system has been blown out.
<br />io. All installed flooring and counters should be fully covered until all construction
<br />is completed.
<br />11. General Contractor shall thoroughly clean the entire suite, including interior
<br />face of exterior windows, after all disciplines are completed with work, and
<br />prior to Client move -in.
<br />12. Design of new or relocation of existing HVAC by Sub -Contractor. Insulate
<br />mechanical supply ducts with batting or duct board. Maximum 12' flex duct
<br />runs. Minimum (4) zones. All thermostat locations must be verified
<br />w/Designer, or may need to be relocated. Design must be submitted to
<br />Designer for review before supplies and returns are roughed -in.
<br />13. If ceiling cavity is a return -air plenum, all trades working in plenum must
<br />meet all applicable codes. A sound boot is required in all plenum -rated return -
<br />air grilles.
<br />14. Where required, provide smoke detectors to code. Provide fire extinguisher in
<br />recessed cabinet located as indicated on Sheets 1 & 3. Paint metal cabinet to
<br />match partitions.
<br />1.5. Typical partition construction: 1-1/2" x 3-1/2" metal studs (16" o.c.) with 5/8"
<br />Type 'X' GWB each side. Smooth partition, no texture. See Detail B/2.
<br />Extend partitions to structure, hang GWB ceiling at +7'-7" (existing height)
<br />above finished floor unless otherwise noted. See Detail D/2 for one hour rated
<br />enclosures at Mechanical Room in Basement and J/2 for Nitrous Closet
<br />outside.
<br />16. Insulate all partitions with sound attenuation batting per Details B/2 and A/2.
<br />1.7. Plumbing partitions with toilet drains are shown as 2X6 construction.
<br />18. X-rays and Panelipse typically require framing blocking to vvithstand 1500#
<br />torque. Verify blocking requirements and locations with Dental Technician.
<br />19. Line all walls of Cone Beam enclosure with an additional layer of 5/8" GWB
<br />for scatter protection.
<br />20. General Contractor to provide backing for all partition -hung cabinets as
<br />required by Cabinetmaker. General Contractor to provide i" square tubular
<br />steel 'L' brackets for unsupported countertops, attached to framing. See
<br />Detail I/2. Suggested locations for counter supports are noted on Elevation
<br />views. Verify heights, locations, gauge, and weight requirements with
<br />Cabinetmaker. Painter to paint any exposed supports to match partition.
<br />21. Cabinetmaker to use on -site field framing dimensions for all fabrications.
<br />22. Dental Technician and Operatory Cabinetmaker shall work with Contractor
<br />and Sub -Contractors on exact locations and specific requirements for dental
<br />equipment. Appropriate parties should be asked to provide templates for
<br />locations of all stub -outs and blocking points for dental equipment. General
<br />Contractor to coordinate on -site layout meeting between Cabinetmaker,
<br />Plumber and Electrician when partitions have been chalked.
<br />Dental Equipment Technician: To Be Determined
<br />Microscope Equipment Technician: T.B.D.
<br />Operatory Cabinetmaker: T.B.D.
<br />22. General Contractor to contact the following parties when partitions are open
<br />to receive wiring:
<br />Telephone: To Be Determined
<br />Computer: T.B.D.
<br />Sound System: T.B.D.
<br />Communication Svstem: T.B.D.
<br />24. For bidding purposes only, this facility should be considered a Level 3 for
<br />Operatories #1 - #3 and Level 2 for Procedure Room #1 - #3, as defined by the
<br />2018 NFPA-99. Upon award of the contract, the General Contractor must
<br />confirm the level required for this practice with the 3rd-Party Verifier and the
<br />Doctor before proceeding with the design and construction of the systems.
<br />2.5. Nitrous/Oxide Tank Storage Rooms (and Mechanical Rooms for Category 1
<br />facilities): Must be 1-hour construction and meet venting requirements of
<br />2018 International Fire Code, Section 53o6: See Detail J/2; and requirements
<br />of the 2018 NFPA-99. Depending on the level of verification required for this
<br />practice, additional requirements for the construction of the enclosures, types
<br />of equipment and uninterrupted power supply may be required. All
<br />requirements are to be determined by a certified 3rd-Pa1tt VerifieV.Vrdi®x�to.
<br />Y UP ETT
<br />mnsl lefi.0r1. _
<br />REVIEW FOR PERMIT
<br />Medical gas systems and dental vacuum lines require wet -stamped drawings
<br />and verification by a certified 3rd-Party Verifier according to the requirements
<br />of the State code and 2oi8 NFPA-99. these systems must meet the
<br />requirements of NFPA-99 for the level of verification required based on the
<br />practice requirements as defined by 2018 NFPA-99. Early planning and
<br />coordination between Verifier, Plumber, Dental Technician and Doctor is
<br />required to confirm the level of verification required for the Med Gas and
<br />Vacuum systems. The General Contractor or Plumbing Sub -Contractor is
<br />responsible to establish this relationship and determine all requirements prior
<br />to construction. Outlets and locations noted on these plans should be
<br />considered general information as the design must be drawn by the Plumber
<br />and verified by the 3rd-Party Verifier g�ri €�1 t�cc�ntrLctic��1.
<br />26. Provide solid framing blocking behind ceiling -mounted Operatory track light
<br />per manufacturer's specifications. Bracing to be mounted behind GWB ceiling
<br />and secured to building structure.
<br />27. Provide blocking for Lead Apron Racks in Operatories and Panelipse Room,
<br />where noted.
<br />28. Height differences between flooring materials shall bevel at a ratio of 1:2 if
<br />greater than 1 /4" per ADA and accessibility codes.
<br />29. Insulate Mechanical Room on all partitions and inside of door with Armstrong
<br />#741, 12"x12" Fine Fissured T&G Ceiling Tile (or equal sound rating) -
<br />adhesive installation.
<br />2o. Safety glass installed where required per 2018 IBC, Chapter 24, Section 24o6.
<br />31. Identification signage provided and installed by others.
<br />+ E.0)
<br />0
<br />co_
<br />_ M .0
<br />- FRAMING CAN
<br />- WALL CHCULE
<br />- GENERAL CONSTK
<br />NOES
<br />
|