Laserfiche WebLink
5EE CONNECTION <br />TO MULLION <br />PET/Ad- E/2. <br />PLKG. FOP COAT <br />HOOK5 Cad - 45 65' AFF: <br />5L<G. FOP COAT <br />HOOKS Cagy +45-65" <br />81_KG. FOP\CEILING-MTD. <br />iv IICP05COPE, TO DE <br />J05 51TE LOCATED, <br />1_ F. OPS #1 - 93 <br />NOTES: <br />1. NO CHANGE TO EXISTING FLOOR SYSTEM. ALL NEW LOADS FROM PROPOSED CHANGES AS SHOWN ON <br />ROOF FRAMING PLAN TRANSFER LOAD THROUGH STUD POSTS AND INTO NEW FOOTINGS <br />TLOOR RIAKAIN <br />F(; MING FLAN, 13ASEMENT <br />SCALE:1/4'' = T _ 011 <br />.. .N ;. -M <br />ra <br />WILL SCHEDULE <br />EXISTING EXTERIOR WALLS <br />NEW INTERIOR I 'ARTITION <br />EXISTING INTERIOR RARTITION TO REMAIN <br />ONE HOUR RATED ENCLOSURE <br />INFILL AT REMOVED WINDOWS <br />FRAMING 13LOCKING <br />FE� <br />FIRE EXTINGUISHER <br />(Type IIA-101 it Rece55ed Cabinet) <br />D1-(5, <br />5TI UCTUF\/N_ NFOR\MATION APPED F3-\\( <br />P t F3 [ 3 LI E`I t N E P\ t N G t N 'EIS <br />1. The design and specifications shown herein illustrate our design intent. We <br />welcome all input on potential product substitutions or alternate ways of <br />doing things that could save time and/or cost. <br />2. Submittals for cabinet shop drawings (including PVC edgebanding), paint and <br />wood -stain drawdowns are required for review by Designer. For all other <br />items, no submittal is required when there is no substitute to that which is <br />specified on these plans. Only provide submittals for those items that are <br />different from what is noted on these plans. <br />3. Contractor shall verify filed dimensions after demolition and report any <br />discrepancies to Designer before proceeding. DO NOT SCALE THESE <br />DRAWINGS FOR CRITICAL DIMENSIONS. Use dimensions given. <br />4. Building a dental facility requires attention to detail. It is expected that a high <br />degree of attentiveness will be delivered throughout. <br />5. Any items or surfaces which are unspecified as to dimensions, material and/or <br />color are to be brought to the Designer's attention before proceeding with <br />making that selection arbitrarily. <br />6. All items shown or specified on these plans shall be provided and installed by <br />the General or appropriate Sub -Contractor, unless noted otherwise. <br />7. New construction shall conform to International Building Code, 2018 Edition, <br />min. requirements for a Type V-B, non-sprin klered construction throughout a <br />Business Group B occupancy. <br />8. General Contractor shall remove existing window coverings prior to <br />demolition, clean, and re -install after all work in the Suite has been completed. <br />9. General Contractor to leave all plastic coverings on troffers until heating <br />system has been blown out. <br />1o. All installed flooring and counters should be fully covered until all construction <br />is completed. <br />11. General Contractor shall thoroughly clean the entire suite, including interior <br />face of exterior windows, after all disciplines are completed with work, and <br />prior to Client move -in. <br />12. Design of new or relocation of existing HVAC by Sub -Contractor. Insulate <br />mechanical supply ducts with batting or duct board. Maximum 12' flex duct <br />runs. Minimum (4) zones. All thermostat locations must be verified <br />w/Designer, or may need to be relocated. Design must be submitted to <br />Designer for review before supplies and returns are roughed -in. <br />13. If ceiling cavity is a return -air plenum, all trades working in plenum must <br />meet all applicable codes. A sound boot is required in all plenum -rated return - <br />air grilles. <br />14. Where required, provide smoke detectors to code. Provide fire extinguisher in <br />recessed cabinet located as indicated on Sheets 1 & 3. Paint metal cabinet to <br />match partitions. <br />15. Typical partition construction: 1-1/2" x 3-1/2" metal studs (16" o.c.) with 5/8" <br />Type'X' GWB each side. Smooth partition, no texture. See Detail B/2. <br />Extend partitions to structure, hang GWB ceiling at +7'-7" (existing height) <br />above finished floor unless otherwise noted. See Detail D/2 for one hour rated <br />enclosures at Mechanical Room in Basement and J/2 for Nitrous Closet <br />outside. <br />16. Insulate all partitions with sound attenuation batting per Details B/2 and A/2. <br />17. Plumbing partitions with toilet drains are shown as 2X6 construction. <br />18. X-rays and Panelipse typically require framing blocking to withstand 1500# <br />torque. Verify blocking requirements and locations with Dental Technician. <br />19• Line all walls of Cone Beam enclosure with an additional layer of 5/8" GWB <br />for scatter protection. <br />20. General Contractor to provide backing for all partition -hung cabinets as <br />required by Cabinetmaker. General Contractor to provide 1" square tubular <br />steel 'L' brackets for unsupported countertops, attached to framing. See <br />Detail I/2. Suggested locations for counter supports are noted on Elevation <br />views. Verify heights, locations, gauge, and weight requirements with <br />Cabinetmaker. Painter to paint any exposed supports to match partition. <br />21. Cabinetmaker to use on -site field framing dimensions for all fabrications. <br />22. Dental Technician and Operatory Cabinetmaker shall work with Contractor <br />and Sub -Contractors on exact locations and specific requirements for dental <br />equipment. Appropriate parties should be asked to provide templates for <br />locations of all stub -outs and blocking points for dental equipment. General <br />Contractor to coordinate on -site layout meeting between Cabinetmaker, <br />Plumber and Electrician when partitions have been chalked. <br />Dental Equipment Technician: To Be Determined <br />Microscope Equipment Technician: T.B.D. <br />Operatory Cabinetmaker: T.B.D. <br />2;I. General Contractor to contact the following parties when partitions are open <br />to receive wiring: <br />Telephone: To Be Determined <br />Computer: T.B.D. <br />Sound System: T.B.D. <br />Communication System: T.B.D. <br />24. For bidding purposes only, this facility should be considered a Level 3 for <br />Operatories #1 - #3 and Level 2 for Procedure Room #1 - #3, as defined by the <br />2018 NFPA-99. Upon award of the contract, the General Contractor must <br />confirm the level required for this practice with the 3rd-Party Verifier and the <br />Doctor before proceeding with the design and construction of the systems. <br />2.5. Nitrous/Oxide Tank Storage Rooms (and Mechanical Rooms for Category 1 <br />facilities): Must be 1-hour construction and meet venting requirements of <br />2018 International Fire Code, Section 53o6: See Detail J/2; and requirements <br />of the 2018 NFPA-99. Depending on the level of verification required for this <br />practice, additional requirements for the construction of the enclosures, types <br />of equipment and uninterrupted power supply may be required. All <br />requirements are to be determined by a certified 3rd-Party <br />Verifiermien° tag _ <br />musirmriinn. CITY <br />Medical gas systems and dental vacuum IlnRes r ire�v5et t�ii�p' c�ia �n A111,T <br />and verification by a certified 3rd-Party Verifier according to the requirements <br />of the State code and 2018 NFPA-99. these systems must meet the <br />requirements of NFPA-99 for the level of verification required based on the <br />practice requirements as defined by 2018 NFPA-99. Early planning and <br />coordination between Verifier, Plumber, Dental Technician and Doctor is <br />required to confirm the level of verification required for the Med Gas and <br />Vacuum systems. The General Contractor or Plumbing Sub -Contractor is <br />responsible to establish this relationship and determine all requirements prior <br />to construction. Outlets and locations noted on these plans should be <br />considered general information as the design must be drawn by the Plumber <br />and verified by the 3rd-Party Verifier Prim! n ,enm s tru .ti n. <br />26. Provide solid framing blocking behind ceiling -mounted Operatory track light <br />per manufacturer's specifications. Bracing to be mounted behind GWB ceiling <br />and secured to building structure. <br />27. Provide blocking for Lead Apron Racks in Operatories and Panelipse Room, <br />where noted. <br />28. Height differences between flooring materials shall bevel at a ratio of 1:2 if <br />greater than 1/4" per ADA and accessibility codes. <br />29. Insulate Mechanical Room on all partitions and inside of door with Armstrong <br />*741, 12"x12" Fine FissuredT&G Ceiling Tile (or equal sound rating) - <br />adhesive installation. <br />2o. Safety glass installed where required per 2018 IBC, Chapter 24, Section 24o6. <br />0)m 6 0 <br />'0510 C0 U 0 <br />-0 F6 C <br />+ E .� <br />M M� <br />co W 0 <br />M-0 <br />- HOMING FLM <br />- W/�LL SCHEDULE <br />- GENEI/SL CONSTF. <br />NOTES <br />DATE: 11.3.2021 <br />SCALE: 1/4'' _ Tr_011 <br />DRAWN: bqC <br />JOB: YOUN <br />SHEET: j ��RU J AL <br />LO _R1-2Zffi1rT <br />f' <br />O E m J SHEETS <br />31. Identification signage provided and installed by others. <br />