My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1429 BROADWAY 2021 Plans 2023-02-24
>
Address Records
>
BROADWAY
>
1429
>
Plans
>
1429 BROADWAY 2021 Plans 2023-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 10:27:09 AM
Creation date
2/23/2023 11:59:27 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1429
Permit
B2111-049
Year
2021
Notes
TI FOR NEW DENTAL OFFICE TO INCLUDE NEW INTERIOR PARTITIONS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5EE CONNECTION <br />TO MULLION <br />PET/Ad- E/2. <br />PLKG. FOP COAT <br />HOOK5 Cad - 45 65' AFF: <br />5L<G. FOP COAT <br />HOOKS Cagy +45-65" <br />81_KG. FOP\CEILING-MTD. <br />iv IICP05COPE, TO DE <br />J05 51TE LOCATED, <br />1_ F. OPS #1 - 93 <br />NOTES: <br />1. NO CHANGE TO EXISTING FLOOR SYSTEM. ALL NEW LOADS FROM PROPOSED CHANGES AS SHOWN ON <br />ROOF FRAMING PLAN TRANSFER LOAD THROUGH STUD POSTS AND INTO NEW FOOTINGS <br />TLOOR RIAKAIN <br />F(; MING FLAN, 13ASEMENT <br />SCALE:1/4'' = T _ 011 <br />.. .N ;. -M <br />ra <br />WILL SCHEDULE <br />EXISTING EXTERIOR WALLS <br />NEW INTERIOR I 'ARTITION <br />EXISTING INTERIOR RARTITION TO REMAIN <br />ONE HOUR RATED ENCLOSURE <br />INFILL AT REMOVED WINDOWS <br />FRAMING 13LOCKING <br />FE� <br />FIRE EXTINGUISHER <br />(Type IIA-101 it Rece55ed Cabinet) <br />D1-(5, <br />5TI UCTUF\/N_ NFOR\MATION APPED F3-\\( <br />P t F3 [ 3 LI E`I t N E P\ t N G t N 'EIS <br />1. The design and specifications shown herein illustrate our design intent. We <br />welcome all input on potential product substitutions or alternate ways of <br />doing things that could save time and/or cost. <br />2. Submittals for cabinet shop drawings (including PVC edgebanding), paint and <br />wood -stain drawdowns are required for review by Designer. For all other <br />items, no submittal is required when there is no substitute to that which is <br />specified on these plans. Only provide submittals for those items that are <br />different from what is noted on these plans. <br />3. Contractor shall verify filed dimensions after demolition and report any <br />discrepancies to Designer before proceeding. DO NOT SCALE THESE <br />DRAWINGS FOR CRITICAL DIMENSIONS. Use dimensions given. <br />4. Building a dental facility requires attention to detail. It is expected that a high <br />degree of attentiveness will be delivered throughout. <br />5. Any items or surfaces which are unspecified as to dimensions, material and/or <br />color are to be brought to the Designer's attention before proceeding with <br />making that selection arbitrarily. <br />6. All items shown or specified on these plans shall be provided and installed by <br />the General or appropriate Sub -Contractor, unless noted otherwise. <br />7. New construction shall conform to International Building Code, 2018 Edition, <br />min. requirements for a Type V-B, non-sprin klered construction throughout a <br />Business Group B occupancy. <br />8. General Contractor shall remove existing window coverings prior to <br />demolition, clean, and re -install after all work in the Suite has been completed. <br />9. General Contractor to leave all plastic coverings on troffers until heating <br />system has been blown out. <br />1o. All installed flooring and counters should be fully covered until all construction <br />is completed. <br />11. General Contractor shall thoroughly clean the entire suite, including interior <br />face of exterior windows, after all disciplines are completed with work, and <br />prior to Client move -in. <br />12. Design of new or relocation of existing HVAC by Sub -Contractor. Insulate <br />mechanical supply ducts with batting or duct board. Maximum 12' flex duct <br />runs. Minimum (4) zones. All thermostat locations must be verified <br />w/Designer, or may need to be relocated. Design must be submitted to <br />Designer for review before supplies and returns are roughed -in. <br />13. If ceiling cavity is a return -air plenum, all trades working in plenum must <br />meet all applicable codes. A sound boot is required in all plenum -rated return - <br />air grilles. <br />14. Where required, provide smoke detectors to code. Provide fire extinguisher in <br />recessed cabinet located as indicated on Sheets 1 & 3. Paint metal cabinet to <br />match partitions. <br />15. Typical partition construction: 1-1/2" x 3-1/2" metal studs (16" o.c.) with 5/8" <br />Type'X' GWB each side. Smooth partition, no texture. See Detail B/2. <br />Extend partitions to structure, hang GWB ceiling at +7'-7" (existing height) <br />above finished floor unless otherwise noted. See Detail D/2 for one hour rated <br />enclosures at Mechanical Room in Basement and J/2 for Nitrous Closet <br />outside. <br />16. Insulate all partitions with sound attenuation batting per Details B/2 and A/2. <br />17. Plumbing partitions with toilet drains are shown as 2X6 construction. <br />18. X-rays and Panelipse typically require framing blocking to withstand 1500# <br />torque. Verify blocking requirements and locations with Dental Technician. <br />19• Line all walls of Cone Beam enclosure with an additional layer of 5/8" GWB <br />for scatter protection. <br />20. General Contractor to provide backing for all partition -hung cabinets as <br />required by Cabinetmaker. General Contractor to provide 1" square tubular <br />steel 'L' brackets for unsupported countertops, attached to framing. See <br />Detail I/2. Suggested locations for counter supports are noted on Elevation <br />views. Verify heights, locations, gauge, and weight requirements with <br />Cabinetmaker. Painter to paint any exposed supports to match partition. <br />21. Cabinetmaker to use on -site field framing dimensions for all fabrications. <br />22. Dental Technician and Operatory Cabinetmaker shall work with Contractor <br />and Sub -Contractors on exact locations and specific requirements for dental <br />equipment. Appropriate parties should be asked to provide templates for <br />locations of all stub -outs and blocking points for dental equipment. General <br />Contractor to coordinate on -site layout meeting between Cabinetmaker, <br />Plumber and Electrician when partitions have been chalked. <br />Dental Equipment Technician: To Be Determined <br />Microscope Equipment Technician: T.B.D. <br />Operatory Cabinetmaker: T.B.D. <br />2;I. General Contractor to contact the following parties when partitions are open <br />to receive wiring: <br />Telephone: To Be Determined <br />Computer: T.B.D. <br />Sound System: T.B.D. <br />Communication System: T.B.D. <br />24. For bidding purposes only, this facility should be considered a Level 3 for <br />Operatories #1 - #3 and Level 2 for Procedure Room #1 - #3, as defined by the <br />2018 NFPA-99. Upon award of the contract, the General Contractor must <br />confirm the level required for this practice with the 3rd-Party Verifier and the <br />Doctor before proceeding with the design and construction of the systems. <br />2.5. Nitrous/Oxide Tank Storage Rooms (and Mechanical Rooms for Category 1 <br />facilities): Must be 1-hour construction and meet venting requirements of <br />2018 International Fire Code, Section 53o6: See Detail J/2; and requirements <br />of the 2018 NFPA-99. Depending on the level of verification required for this <br />practice, additional requirements for the construction of the enclosures, types <br />of equipment and uninterrupted power supply may be required. All <br />requirements are to be determined by a certified 3rd-Party <br />Verifiermien° tag _ <br />musirmriinn. CITY <br />Medical gas systems and dental vacuum IlnRes r ire�v5et t�ii�p' c�ia �n A111,T <br />and verification by a certified 3rd-Party Verifier according to the requirements <br />of the State code and 2018 NFPA-99. these systems must meet the <br />requirements of NFPA-99 for the level of verification required based on the <br />practice requirements as defined by 2018 NFPA-99. Early planning and <br />coordination between Verifier, Plumber, Dental Technician and Doctor is <br />required to confirm the level of verification required for the Med Gas and <br />Vacuum systems. The General Contractor or Plumbing Sub -Contractor is <br />responsible to establish this relationship and determine all requirements prior <br />to construction. Outlets and locations noted on these plans should be <br />considered general information as the design must be drawn by the Plumber <br />and verified by the 3rd-Party Verifier Prim! n ,enm s tru .ti n. <br />26. Provide solid framing blocking behind ceiling -mounted Operatory track light <br />per manufacturer's specifications. Bracing to be mounted behind GWB ceiling <br />and secured to building structure. <br />27. Provide blocking for Lead Apron Racks in Operatories and Panelipse Room, <br />where noted. <br />28. Height differences between flooring materials shall bevel at a ratio of 1:2 if <br />greater than 1/4" per ADA and accessibility codes. <br />29. Insulate Mechanical Room on all partitions and inside of door with Armstrong <br />*741, 12"x12" Fine FissuredT&G Ceiling Tile (or equal sound rating) - <br />adhesive installation. <br />2o. Safety glass installed where required per 2018 IBC, Chapter 24, Section 24o6. <br />0)m 6 0 <br />'0510 C0 U 0 <br />-0 F6 C <br />+ E .� <br />M M� <br />co W 0 <br />M-0 <br />- HOMING FLM <br />- W/�LL SCHEDULE <br />- GENEI/SL CONSTF. <br />NOTES <br />DATE: 11.3.2021 <br />SCALE: 1/4'' _ Tr_011 <br />DRAWN: bqC <br />JOB: YOUN <br />SHEET: j ��RU J AL <br />LO _R1-2Zffi1rT <br />f' <br />O E m J SHEETS <br />31. Identification signage provided and installed by others. <br />
The URL can be used to link to this page
Your browser does not support the video tag.