Laserfiche WebLink
BOOFING & WATERPROOFING NOTES <br />GENERAL NOTES (CONTINUATIOWGENERAL <br />TES I ATI <br />CESSIBILITY EXCEPTION T <br />1. CONTRACTOR SHALL CONTACT THE BUILDING OWNER TO DETERMINE IF ROOF IS UNDER <br />11. <br />THE GENERAL CONTRACTOR MUST PERFORM WORK DURING PROPERTY OWNER'S <br />39. <br />A PRE -CONSTRUCTION CONFERENCE OF REPRESENTATIVES FROM AFFECTED AGENCIES <br />1. SECTION 1103.2.7: LIMITED ACCESS SPACES - SPACES NOT CUSTOMARILY OCCUPIED AND <br />WARRANTY. CONTRACTOR SHALL GUARANTEE THAT ANY AND ALL NEW ROOFING WORK <br />PREFERRED HOURS TO AVOID DISRUPTION OF NORMAL ACTIVITY. <br />SHALL BE HELD ON THE JOB AT LEAST ONE (1) WEEK PRIOR TO BEGINNING <br />ACCESSED ONLY BY LADDERS, CATWALKS, CRAWL SPACES, FEIGHT, ELEVATORS OR VERY <br />MEETS THE SPECIFICATION OF ANY EXISTING ROOFING WARRANTIES SUCH THAT THE <br />CONSTRUCTION. <br />NARROW PASSAGEWAYS SHALL NOT BE REQUIRED TO COMPLY WITH THESE REQUIREMENTS <br />WARRANTY IS NOT MADE INVALID AS A RESULT OF THIS WORK. IF IT IS DETERMINED <br />12. <br />ALL EXPOSED METAL SHEET SHALL BE HOT -DIPPED GALVANIZED. <br />OR TO BE ON AN ACCESSIBLE ROUTE. <br />THAT THE ARCHITECT'S DETAILING IS INADEQUATE OR IMPROPER OR IF ANY OTHER <br />40. <br />DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCES, WRITTEN DIMENSIONS <br />DISCREPANCY IS FOUND, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT <br />13. <br />PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RAZING OF NOT LESS THAN 2-A OR <br />TAKE PRECEDENCE OVER SCALE, AND THIS SET OF PLANS IS INTENDED TO BE USED FOR <br />2. SECTION 1103.2.9: EQUIPMENT SPACES - SPACES FREQUENTED ONLY BY SERVICE <br />AND THE CLIENT PROJECT MANAGER IN WRITING. ULTIMATELY, THE CONTRACTOR SHALL BE <br />2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF THE PROJECT AREA <br />DIAGRAMMATIC PURPOSES ONLY, UNLESS NOTED OTHERWISE. CONTRACTOR SHALL PROVIDE <br />PERSONNEL FOR MAINTENANCE, REPAIR OR OCCASIONAL MONITORING OF EQUIPMENT <br />RESPONSIBLE FOR COMPLYING WITH THE ORIGINAL ROOF MANUFACTURER'S <br />CONSTRUCTION. <br />FIELD MEASUREMENTS AS NECESSARY TO COMPLETE ALL WORKS AND THE GENERAL <br />SHALL NOT BE REQUIRED TO COMPLY WITH THIS REQUIREMENT OR 10 BE ON AN <br />SPECIFICATIONS. <br />CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING ALL MATERIALS, EQUIPMENT, <br />ACCESSIBLE ROUTE. MACHINERY SPACES INCLUDE, BUT ARE NOT LIMITED TO, ELEVATOR <br />14. <br />THE GOVERNING AGENCIES, CODE AUTHORITIES, AND BUILDING INSPECTORS SHALL <br />LABOR, AND ANYTHING ELSE DEEMED NECESSARY TO COMPLETE INSTALLATIONS AS <br />PITS OR ELEVATOR PENTHOUSES; MECHANICAL. ELECTRICAL OR COMMUNICATIONS <br />2. CONTRACTOR SHALL USE METHODS AND MATERIALS SIMILAR AND COMPATIBLE WITH <br />PROVIDE THE MINIMUM STANDARDS FOR CONSTRUCTION TECHNIQUES, MATERIALS, AND <br />DESCRIBED HEREIN. SYNERGY IS NOT RESPONSIBLE FOR ANY ERRORS RESULTING FROM <br />EQUIPMENT ROOMS; PIPING OR EQUIPMENT CATWALKS; WATER OR SEWAGE TREATMENT <br />EXISTING MATERIALS & CONDITIONS FOR ROOF PATCHING, NEW PENETRATIONS, ETC. <br />FINISHES USED THROUGHOUT THE PROJECT TRADE STANDARDS AND/OR PUBLISHED <br />THIS PRACTICE WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS. <br />PUMP ROOMS AND STATIONS; ELECTRIC SUBSTATIONS AND TRANSFORMER VAULTS; AND <br />MANUFACTURERS SPECIFICATIONS MEETING OR EXCEEDING DESIGN REQUIREMENTS SHALL <br />HIGHWAY AND TUNNEL FACILITIES. <br />3. THE CONTRACTOR SHALL PROPERLY SEAL ALL NEW ROOF & BUILDING ENVELOPE <br />BE USED FOR INSTALLATION. <br />41. <br />DETAILS INCLUDED HEREIN ARE INTENDED TO SHOW END RESULT OF DESIGN. MINOR <br />PENETRATIONS SUCH THAT THE INTEGRITY OF THE ORIGINAL BUILDING ASSEMBLY AND ALL <br />MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS OR SITUATIONS, AND SUCH <br />APPLICABLE WARRANTIES ARE MAINTAINED. <br />15. <br />PRIOR TO STARTING CONSTRUCTION OF THE CONTRACTOR HAS THE RESPONSIBILITY TO <br />MODIFICATIONS SHALL BE INCLUDED AS PART OF THE SCOPE OF WORK. <br />GENERAL RF NOTES <br />LOCATE ALL EXISTING UTILITIES, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR <br />4. IF IT DEEMED NECESSARY TO REMOVE EXISTING FINISHED AND/OR MATERIALS, THE <br />OR SUBCONTRACTOR SHALL BEAR THE EXPENSE OF REPAIRING OR REPLACING ANY <br />1. ALL ANTENNAS AND ANTENNA CABLE SHALL BE FURNISHED BY THE CELL CARRIER AND <br />BY ANTENNA INSTALLATION CONTRACTOR. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR RECONSTRUCTING FINISHES AND MATERIALS TO <br />DAMAGE TO THE UTILITIES CAUSED DURING THE EXECUTION OF THE WORK. <br />IT PREPARATION NOTES <br />INSTALLED <br />IN <br />LINE -NEW CONDITIONS. CONTRACTOR SHALL MAINTAIN THE ORIGINAL COLORS, TEXTURES <br />'T <br />16. <br />A COPY OF THE APPROVED PLANS SHALL BE KEPT IN A PLACE SPECIFIED BY THE <br />1. <br />THE PREPARATION OF THE SITE FOR CONSTRUCTION SHALL INCLUDE THE REMOVAL OF <br />2. PRIOR TO INSTALLATION OF ANTENNAS THE CONTRACTOR SHALL VERIFY THAT THE <br />LI FINISHES UNLESS SPECIFICALLY NOTED T 0 THE CONTRARY APPROVED MOBILE <br />GOVERNING AGENCY, AND BY LAW SHALL BE AVAILABLE FOR INSPECTION AT ALL TIMES. <br />ALL BROKEN CONCRETE, E, TREE TRUNKS AND ANY OTHER DEBRIS THAT MIGHT DAMAGE THE <br />AZIMUTH AND DIMENSIONS SHOWN ON THE PLANS MATCH ACTUAL FIELD CONDITIONS. <br />CONSTRUCTION MANAGER IN ADVANCE. <br />FOOTINGS OF THE NEW STRUCTURE. <br />5. AT THE CLIENT CONSTRUCTION MANAGER'S DISCRETION, THE CONTRACTOR SHALL PROVIDE <br />17. <br />IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALL CONSTRUCTION SETS REFLECT <br />2. <br />BACKFILL ALL TRENCHES WITH CLEAN, STERILE SOIL HAVING A SAND EQUIVALENT OF 30% <br />3. ANTENNA INSTALLATION CONTRACTOR SHALL PROVIDE ALL CONDUIT, CABLE TRAYS, <br />GROUND KITS, CLAMPS, GROUNDS, ETC., FOR COMPLETE INSTALLATION OF ANTENNAS AND <br />ROOF -TOP WALKPADS TO ALL NEW EQUIPMENT INCLUDING ANTENNAS AND BTS UNITS AND <br />THE SAME INFORMATION AS THE APPROVED PLANS. THE CONTRACTOR SHALL ALSO <br />MAINTAIN ONE SET OF PLANS AT THE SITE FOR THE PURPOSE OF DOCUMENTING ALL <br />OR GREATER. BACKFILL IN 8 INCH LAYERS, MOISTURE CONDITIONED AND PROPERLY <br />CABLES SHOWN AND INTENDED AS REQUIRED FOR A COMPLETE OPERATING SYSTEM IN <br />ALONG COAX CABLE ROUTING. ON CONVENTIONAL ROOFING, THE WALK PADS SHALL BE <br />"DUCK <br />AS-BUILI CHANGES, REVISIONS, ADDENDUMS, OR CHANGE ORDERS. THE CONTRACTOR <br />COMPACTED, ADEQUATE DRAINAGE SHALL BE PROVIDED SUCH THAT NO PONDING OCCURS. <br />ACCORDANCE WITH T-MOBILE WIRELESS STANDARDS. <br />BOARDS" AS MANUFACTURED BY APC OR EQUAL. ON SPECIAL ROOFING SYSTEMS <br />SHALL FORWARD THE AS-BUILI DRAWINGS TO THE ARCHITECT/ENGINEER AND THE <br />SUCH AS SINGLE MEMBRANE ROOFS WILL REQUIRE A SPECIFIC PRODUCT AS NOTED ON <br />3. <br />ALL FOUNDATION FOOTINGS SHALL EXTEND. INTO AND BEAR AGAINST NATURAL <br />4. ANTENNA CONDUIT SHALL INCLUDE FACTORY -MADE LARGE RADIUS SWEEPS. AT ALL <br />PLANS OR AS REQUIRED BY NOTES 1 & 2 ABOVE. <br />LANDLORD/LESSOR AT THE CONCLUSION OF THE PROJECT. <br />UNDISTURBED SOIL OR APPROVED COMPACTED FILL. FOOTINGS SHALL EXTEND INTO SOIL <br />CHANGES IN DIRECTION. SWEEP RADIUS SHALL BE AS REQUIRED TO MEET COAX <br />18. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE <br />DEPTH AS INDICATED IN PLANS. <br />MANUFACTURER'S MINIMUM BENDING RADIUS. <br />PENETRATION AT FIE RATED ASSEMBLIES NOTES <br />FROM THE START TO THE COMPLETION OF THE PROJECT. THE CONTRACTOR SHALL <br />4. <br />SHOULD ANY LOOSE FILL, EXPANSIVE SOIL, GROUND WATER OR ANY OTHER UNEXPECTED <br />5. ALL UNDERGROUND CONDUIT SHALL BE SCHEDULE 40 PVC WITH STEEL BENDS. ALL <br />MAINTAIN ACCESS TO THE SITE AT ALL TIMES FOR THE LANDLORD/LESSOR PERSONNEL. <br />CONDITIONS BE ENCOUNTERED DURING THE EXCAVATION FOR THE NEW FOUNDATION, THE <br />EXPOSED CONDUIT ABOVE GRADE LEVEL SHALL BE IMC OR RIGID GALVANIZED. ALL <br />1. AT THE CLIENT PROJECT MANAGER'S DIRECTION, THE CONTRACTOR SHALL PROVIDE " HILTI" <br />ARCHITECT/ENGINEER SHALL BE NOTIFIED AND ALL FOUNDATION WORK SHALL CEASE <br />EXPOSED CONDUIT PROTECTED IN A BUILDING OR ON A ROOF SHALL BE EMT OR UV <br />HIGH PERFORMANCE FIRESTOP SYSTEM #FS601 AT ALL FIRE RATED PENETRATIONS <br />19. <br />THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY POWER, WATER AND <br />IMMEDIAI ELY. <br />STABILIZED, PAINTED, SCHEDULE 80 PVC. <br />TOILET FACILITIES. <br />INSTALLED PER MANUFACTURER'S LATEST INSTALLATION SPECIFICATIONS. <br />5. <br />WITHIN AN AREA A MINIMUM OF 5 FEET BEYOND THE BUILDING LIMITS, EXCAVATE A <br />6. IN HIGH TRAFFIC AREAS OR WHERE SUSCEPTIBLE TO DAMAGE CONTRACTOR SHALL <br />2. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE CONSTRUCTED SO AS TO <br />20. <br />ALL CONSTRUCTION PHASES OF THE PROJECT SHALL CONFORM TO THE CURRENT <br />MINIMUM OF 4 INCHES OF EXISTING SOIL. REMOVE ALL ORGANICS, PAVEMENT, ROOTS, <br />PROVIDE FORMED 14 GA GALVANIZED SHEET METAL COVER OVER COAXIAL CABLE ROUTES. <br />MAINTAIN AN EQUAL OR GREATER FIRE RATING. <br />GOVERNING CODES. <br />DEBRIS AND OTHERWISE UNSUITABLE MATERIAL. <br />WHERE CABLE IS RUN ON THE WALL, ATTACH UNISTRUT TO WALL AND COVER WITH 14 <br />GA GALVANIZED FORMED SHEET METAL COVER OR MATERIAL AS DIRECTED BY T -MOBILE <br />21. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL SAFETY <br />6. <br />THE SURFACE OF THE EXPOSED SUBGRADE SHALL BE INSPECTED BY PROBING OR <br />WIRELESS PROJECT MANAGER. <br />PRECAUTIONS AND REGULATIONS DURING THE WORK. THE ENGINEER WILL NOT ADVISE OR <br />TESTING TO CHECK FOR POCKETS OF SOFT OR UNSUITABLE MATERIAL. EXCAVATE <br />GENERAL CES <br />PROVIDE DIRECTION AS TO SAFETY PRECAUTIONS AND PROGRAMS. <br />UNSUITABLE SOIL AS DIRECTED BY THE GEOTECHNICAL ENGINEER/TESTING AGENCY. <br />7. VERIFY ROUTE AND LENGTH OF CABLE PRIOR TO CUTTING. ADJUST INDICATED ROUTE AS <br />1. THE LATEST EDITION OF THE AMERICAN INSTITUTE OF ARCHITECTS DOCUMENT A201 <br />22. <br />THE CONTRACTOR SHALL SUPERVISE AND COORDINATE ALL WORK, USING PROFESSIONAL <br />REQUIRED TO CLEAR EXISTING OBSTRUCTIONS AND MAINTAIN REQUIRED CLEARANCE FROM <br />"GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" ARE INCLUDED IN THESE <br />KNOWLEDGE AND SKILLS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL <br />7. <br />PROOF ROLL THE SURFACE OF THE EXPOSED SUBGRADE WITH A LOADED TANDEM AXLE <br />EXISTING EQUIPMENT AND FACILITIES. <br />SPECIFICATIONS AS IF COMPLETELY REPRODUCED HEREIN. <br />CONSTRUCTION MEANS, METHODS, TECHNIQUES, PROCEDURES, SEQUENCING AND <br />DUMP TRUCK. REMOVE ALL SOILS WHICH PUMP OR DO NOT COMPACT PROPERLY AS <br />8. MAXIMUM LENGTH OF 7/8 INCH COAXIAL CABLE SHALL BE 140 FEET. MAXIMUM LENGTH <br />COORDINATING ALL PORTIONS OF THE WORK. <br />DIRECTED BY THE GEOTECHNICAL ENGINEER/TESTING AGENCY. <br />2. THESE NOTES SHALL BE CONSIDERED A PART OF THE WRITTEN SPECIFICATION. <br />OF 1-5/8 INCH COAXIAL CABLE SHALL BE 240 FEET. <br />23. <br />THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN AND PAY FOR ALL PERMITS, <br />8. <br />FILL ALL EXCAVATED AREAS WITH APPROVED CONTROLLED FILL. PLACE IN 8 INCHES <br />3. THIS FACILITY IS AN UNOCCUPIED TELECOMMUNICATIONS SITE AND IS EXEMPT FROM <br />LICENSES AND/OR INSPECTIONS TO COMPLETE THE PROJECT. BUILDING PERMIT <br />LOOSE LIFTS AND THE MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D698. <br />9. VERIFY MODEL NUMBERS OF ANTENNAS WITH T-MOBILE WIRELESS SERVICES. <br />DISABLED ACCESS REQUIREMENTS. <br />APPLICATIONS SHALL BE FILED BY THE OWNER OR THE REPRESENTATIVE. CONTRACTOR <br />COMPACT TO A MINIMUM OF 90% RELATIVE COMPACTION <br />SHALL OBTAIN THE PERMIT AND MAKE FINAL PAYMENT OF THE SAID DOCUMENT. <br />THE CONTRACTOR SHALL PROVIDE TESTING OF ANTENNAS AND SHALL PROVIDE <br />4. PRIOR TO THE SUBMISSION OF BIDS, THE CONTRACTORS PARTICIPATING SHALL VISIT THE <br />9. <br />9. <br />ANY STRUCTURAL DRAWINGS HERE IN REPRESENT THE FINISHED STRUCTURE. THE <br />DOCUMENTATION TO THE CELL CARIER PROJECT MANAGER. <br />JOB SITE AND FAMILIARIZE THEMSELVES WITH ALL FIELD CONDITIONS AFFECTING THE <br />24. <br />ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE UNLESS OTHERWISE NOTED. <br />CONTRACTOR SHALL PROVIDE ALL TEMPORARY GUYING AND BRACING REQUIRED TO ERECT <br />PROPOSED PROJECT INCLUDING DEMOLITION, ELECTRICAL, MECHANICAL AND STRUCTURAL <br />AND HOLD THE STRUCTURE IN PROPER ALIGNMENT UNTIL ALL STRUCTURAL WORK AND <br />11. INSTALL EMBOSSED ALUMINUM IDENTIFICATION TAGS AT THE END OF THE MAIN COAXIAL <br />INSTALLATIONS, AS WELL AS WITH THE CONSTRUCTION AND CONTRACT DOCUMENTS AND <br />25. <br />THE CONTRACTOR SHALL PROVIDE THE FIRE MARSHALL APPROVED MATERIALS TO <br />CONNECTIONS HAVE BEEN COMPLETED. THE INVESTIGATION, DESIGN, SAFETY, ADEQUACY <br />CABLE RUNS, ALONG WITH THE END OF THE JUMPER CABLE LOCATED WITHIN THE <br />SHALL CONFIRM THAT THE PROJECT CAN BE ACCOMPLISHED AS SHOWN PRIOR TO <br />FILL/SEAL PENETRATIONS THROUGH THE FIRE RATE ASSEMBLIES. <br />AND INSPECTION OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE <br />PLINTH SECTION OF THE BTS UNIT. <br />PROCEEDING WITH THE CONSTRUCTION. SHOULD ANY ERRORS, OMISSION, OR <br />SOLE RESPONSIBILITY OF THE CONTRACTOR. <br />DISCREPANCIES BE FOUND, THE GENERAL CONTRACTOR SHALL IMMEDIATELY NOTIFY <br />26. <br />NEW CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL BE MATCHED IN FORM, <br />SYNERGY AND THE PROJECT ARCHITECT / ENGINEER IN WRITING. IN THE EVENT OF <br />TEXTURE, MATERIAL AND PAINT COLOR EXCEPT AS NOTED IN THE PLANS. <br />10. <br />THE ARCHITECT/ENGINEER IS NOT RESPONSIBLE FOR COMPLICATIONS, DAMAGES, INJURY, <br />DISCREPANCIES FOUND, THE GENERAL CONTRACTOR SHALL IMMEDIATELY NOTIFY SYNERGY <br />OR DEATH ARISING OUT OF ANY KIND OF NEGLIGENCE PRIOR TO COMPLETION OF THE <br />AND THE PROJECT ARCHITECT / ENGINEER IN WRITING. IN THE EVENT OF DISCREPANCIES <br />27. <br />WHERE SPECIFIED, MATERIALS TESTING SHALL BE TO THE LATEST STANDARDS AVAILABLE <br />FINISHED STRUCTURE. <br />THE CONTRACTOR SHALL INCLUDE THE MORE COSTLY OR EXTENSIVE WORK IN THE BID, <br />AS REQUIRED BY THE LOCAL GOVERNING AGENCY RESPONSIBLE FOR RECORDING THE <br />UNLESS SPECIFICALLY DIRECTED OTHERWISE. THE CONTRACTOR SHALL BE RESPONSIBLE <br />RESULTS. <br />11. <br />PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL PROTECT ALL AREAS FROM <br />FOR CORRECTING ANY ERROR, OMISSION, OR INCONSISTENCY AFTER THE START OF THE <br />DAMAGE WHICH MAY OCCUR DURING CONSTRUCTION. ANY DAMAGE TO NEW OR EXISTING <br />CONSTRUCTION WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF THE PROJECT <br />28. <br />ALL GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM REQUIREMENTS TO BE <br />SURFACES, STRUCTURES OR EQUIPMENT SHALL BE IMMEDIATELY REPAIRED OR REPLACED <br />ARCHITECT / ENGINEER AND SHALL INCUR ANY EXPENSES TO RECTIFY THE SITUATION. <br />USED IN CONDITIONS WHICH ARE NOT SPECIFICALLY SHOWN OTHERWISE. <br />TO THE SATISFACTION OF THE PROPERTY OWNER. THE CONTRACTOR SHALL BEAR THE <br />THE MEANS OF CORRECTING ANY ERROR SHALL FIRST BE APPROVED BY THE PROJECT <br />EXPENSE OF REPAIRING OR REPLACING ANY DAMAGED AREAS. <br />ARCHITECT j ENGINEER. <br />29. <br />ALL DEBRIS AND REFUSE IS TO BE REMOVED FROM THE PROJECT DAILY. PREMISES <br />SHALL BE LEA IN A CLEAN jSWEPT CONDITION AT ALL TIMES. <br />12. <br />WHEN REQUIRED STORAGE OF MATERIALS OCCURS, MATERIAL SHALL BE EVENLY <br />5. THE CONTRACTOR SHALL INCLUDE IN THE BID ALL MATERIALS, EQUIPMENT, <br />DISTRIBUTED OVER THE FLOOR OR ROOF SO AS NOT TO EXCEED THE DESIGNED LIVE <br />APPURTENANCES AND LABOR NECESSARY TO COMPLETE THE WORK AS INDICATED OR <br />30. <br />ALL SYMBOLS AND ABBREVIATIONS ARE CONSIDERED CONSTRUCTION INDUSTRY <br />LOADS FOR THE STRUCTURE. TEMPORARY SHORING OR BRACING SHALL BE PROVIDED <br />IMPLIED BY THESE DRAWINGS. <br />STANDARDS. IF A CONTRACTOR HAS A QUESTING REGARDING THEIR EXACT MEANING THE <br />WHERE THE STRUCTURE OR SOIL HAS NOT ATTAINED THE DESIGN STRENGTH FOR THE <br />ARCHITECT/ENGINEER SHALL BE NOTIFIED FOR CLARIFICATIONS. <br />CONDITIONS PRESENT, <br />6. THE CONTRACTOR SHALL PROVIDE CONTINUOUS SUPERVISION WHILE ANY <br />13. <br />PRIOR I0 PROCEEDING WITH ANY WORK WITHIN AN EXISTING FACILITY, THE CONTRACTOR <br />SUBCONTRACTORS OR WORKERS ARE ON THE SITE AND SHALL SUPERVISE AND DIRECT <br />31. <br />THE ENGINEER SHALL NOT BE RESPONSIBLE FOR THE METHODS, TECHNIQUES AND <br />SHALL BE FAMILIAR HIMSELF WITH EXISTING STRUCTURAL AND OTHER CONDITIONS. IT <br />ALL WORK, USING THE BEST SKILLS AND ATTENTION. THE CONTRACTOR SHALL BE SOLELY <br />SEQUENCES OF PROCEDURES TO PERFORM THE WORK. THE SUPERVISION OF THE WORK <br />SHALL BE THE CONTRACTOR'S RESPONSIBILITY PROVIDE ALL NECESSARY BRACING, <br />RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, PROCEDURES AND <br />IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. <br />SHORING AND OTHER SAFEGUARDS TO MAINTAIN ALL L PARTS OF THE EXISTING WORK IN A <br />SEQUENCES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE <br />SAFE CONDITION DURING THE PROCESS OF DEMOLITION AND CONSTRUCTION AND TO <br />CONTRACT. <br />32. <br />CONTRACTORS SHALL BID WALK THE PROJECT TO ASCERTAIN CONDITIONS WHICH MAY <br />PROTECT FROM DAMAGE THOSE PORTIONS OF THE EXISTING WORK WHICH ARE TO <br />ADVERSELY AFFECT THE WORK OR COST THEREOF. <br />7. WORKMANSHIP THROUGHOUT SHALL BE OF THE BEST QUALITY OF THE TRADE INVOLVED, <br />REMAIN. <br />AND SHALL MEET OR EXCEED THE FOLLOWING MINIMUM REFERENCE STANDARDS FOR <br />33. <br />THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, THE DIMENSIONS, <br />QUALITY AND PROFESSIONAL CONSTRUCTION PRACTICE: <br />ELEVATIONS, ETC. NECESSARY FOR THE PROPER CONSTRUCTION AND ALIGNMENT OF THE <br />SHOP IE <br />NEW WORK TO THE EXISTING WORK. THE CONTRACTOR SHALL MAKE ALL MEASUREMENTS <br />-DRAWING <br />NCRA NATIONAL ROOFING CONTRACTORS ASSOCIATION <br />NECESSARY FOR THE FABRICATION AND ERECTION OF STRUCTURAL MEMBERS. ANY <br />1. <br />REVIEW BY THE ARCHITECT/ENGINEER IS FOR GENERAL COMPLIANCE WITH THE DESIGN <br />0' HARE INTERNATIONAL CENTER <br />DISCREPANCY SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE <br />CONCEPT AND THE CONTRACT DOCUMENTS. MARKINGS OR COMMENTS SHALL NOT BE <br />10255 W. HIGGENS ROAD, SUITE 600 <br />ARCHITECT/ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AND <br />CONSTRUED AS RELIEVING THE CONTRACTOR FROM COMPLIANCE WITH THE PROJECT <br />ROSEMONT, IL 60018 <br />MATERIALS INCLUDING THOSE FURNISHED BY THE SUBCONTRACTOR(S). <br />PLANS AND SPECIFICATIONS, NOR DEPARTURES THERE FROM. THE CONTRACTOR REMAINS <br />RESPONSIBLE FOR DETAILS AND ACCURACY, FOR CONFIRMING AND CORRELATING ALL <br />SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS <br />34. <br />IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING <br />QUANTITIES AND DIMENSIONS, FOR SELECTION FABRICATION PROCESSES. <br />NATIONAL ASSOCIATION <br />UTILITIES WHETHER SHOWN HEREON OR NOT, AND TO PROTECT THEM FROM DAMAGE. THE <br />4201 LAFAYETTE CENTER DRIVE <br />CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR REPLACEMENT IN CONJUNCTION <br />LANDLORDAESSOR <br />NOTES <br />CHANT ILLY, VA 20151 <br />WITH THE EXECUTION OF THIS WORK. GENERAL CONTRACTOR SHALL NOTIFY THE ENGINEER <br />AND ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES FOUND WITHIN THE CONTRACT <br />1. <br />A PRECONSTRUCTION CONFERENCE OF REPRESENTATIVES FROM APPLICABLE AGENCIES <br />IILP INTERNATIONAL INSTITUTE FOR LATH AND PLASTER <br />DOCUMENTS, PRIOR TO STARTING WORK. <br />SHALL BE HELD ON SITE AT LEAST ONCE PRIOR TO BEGINNING CONSTRUCTION AT WHICH <br />P.O. BOX 1663 <br />TIME A CONSTRUCTION SCHEDULE AND 24-HOUR CONTACT INFORMATION SHALL BE <br />LAFAYETTE, CA 94549 <br />35. <br />ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES WHERE <br />PROVIDED TO LANDLORD/LESSOR. <br />ENCOUNTERED IN WORK, SHALL BE PROTECTED AT ALL TIMES, AND WHERE REQUIRED <br />8. INSTALL ALL EQUIPMENT AND MATERIALS PER THE LATEST EDITION OF THE <br />FOR THE PROPER EXECUTION OF WORK, SHALL BE RELOCATED AS DIRECTED BY <br />2. <br />CONTRACTOR SHALL MAINTAIN ACCESS TO THE SITE AT ALL TIMES FOR LANDLORD/LESSOR <br />CITY I`P EVER TT <br />MANUFACTURER'S INSTALLATION SPECIFICATIONS UNLESS SPECIFICALLY OTHERWISE <br />ENGINEERS. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING <br />PERSONNEL. OPEN TRENCHES SHALL BE PROPERLY PLATED AT THE END OF EACH <br />REVIEWED FOR PERMIT <br />INDICATED, OR WHERE LOCAL CODES OR REGULATIONS PRECEDENCE. <br />OR PIER DRILLING AROUND OR NEAR UTILITIES. <br />WORKING DAY TO ALLOW FOR 24-HOUR LANDLORD/LESSOR ACCESS TO THE SITE. <br />9. THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL GIVE ALL NOTICES AND SHALL <br />36. <br />ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC AND OTHER UTILITIES, WHICH <br />COMPLY WITH ALL APPLICABLE LOCAL CODES, REGULATIONS, LAWS AND ORDINANCES AS <br />INTERFERE WITH THE EXECUTION OF WORK, SHALL BE REMOVED AND SHALL BE CAPPED, <br />3. <br />THE CONTRACTOR AND CELL CARRIER SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO <br />WELL AS STATE DEPARTMENT OF INDUSTRIAL REGULATIONS AND DIVISION OF INDUSTRIAL <br />PLUGGED OR OTHERWISE DISCONTINUED AT POINTS WHICH WILL NOT INTERFERE WITH THE <br />CONSTRUCTION ACTIVITIES TO THE EXISTING SITE AND SHALL RETURN DAMAGED FACILITIES <br />SAFETY (OSHA) REQUIREMENTS. <br />EXECUTION OF WORK, SUBJECT TO THE APPROVAL OF THE ENGINEER, <br />TO EXISTING CONDITION OR BETTER AT NO COST TO THE LANDLORD/LESSOR.NOTE: <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL REMEDY <br />37 <br />CHANCES BE THESE PU WITHOUT THEWRITTEN <br />4 <br />SHALL SERVICE ALERT (� <br />NWORKO A <br />INFERIOR, AND/OR IMPROPER MATERIALS, DAMAGE GOOD AND/OR FAULTY <br />CHANGESKNOWLEDGE <br />UNAUTHORIZEDNS <br />OFARE <br />CONSENTTHEO ARCHITDCTTONGINEER.RENDER THESE <br />®0IG <br />PR OTR�OUBEGINNROG CONSTRUCTION AT 1UND <br />TWO (2)THE <br />G DAYS422) 4Ai 33LEASTCONTRACTOR <br />CONSTRUCTIONITT ONS BEFORE <br />WORKMANSHIP FOR ONE (1) YEAR AFTER THE PROJECT IS COMPLETE A D ACCEPTED <br />DRAWINGS VOID. <br />UNDER THIS CONTRACT; UNLESS NOTED OTHERWISE IN THE CONTRACT BETWEEN THE <br />5, <br />ALL NEW AND EXISTING FACILITIES OWNED BY THE REPRESENTED CELLULAR CARRIER <br />SUBMITTAL <br />OWNER AND CONTRACTOR. EXCEPTION: THE ROOFING SUBCONTRACTOR SHALL FURNISH A <br />38. <br />ANY REFERENCES TO THE WORDS APPROVED, OR APPROVAL IN THESE DOCUMENTS SHALL <br />SHALL BE PROPERLY TAGGED IDENTIFYING THE OWNER'S NAME AND 24-HOUR PHONE <br />MAINTENANCE AGREEMENT FOR ALL WORK DONE, COSIGNED BY THE GENERAL <br />BE HERE DEFINED TO MEAN GENERAL ACCEPTANCE OR REVIEW AND SHALL NOT RELIEVE <br />NUMBER. <br />CONSTRUCTIONFABRICATION. <br />CONTRACTOR, TO MAINTAIN THE ROOFING IN A WATER TIGHT CONDITION FOR A PERIOD OF <br />THE CONTRACTOR AND/OR HIS SUBCONTRACTORS OF ANY LIABILITY IN FURNISHING THE <br />i <br />TWO (2) YEARS STARTING AFTER THE DATE OF SUBSTANTIAL COMPLETION OF THE <br />REQUIRED MATERIALS OR LABOR SPECIFIED. <br />6. <br />THE CONTRACTOR IS RESPONSIBLE TO ENSURE THE SITE IS SECURE DURING BOTH <br />PROJECT, UNLESS OTHERWISE WRITTEN IN THE CONTRACT BETWEEN THE OWNER AND THE <br />WORKING AND NON -WORKING HOURS, <br />I <br />I <br />CONTRACTOR. <br />s <br />I <br />®PROOFING PENETRA-1-10N AND <br />4 <br />GENERAL NOTES <br />I- NUJL Ul IINrUKIVIf-\I IUIN: <br />NAME- <br />MASONICT <br />220 OLYMPIC BLDV. EVERETT, WA 98203 <br />-CURRENT ISSUE DATE: <br />04/05/22 <br />-ISSUED FOR: <br />CONSTRUCIrION <br />=REV.: DATE: D�cnoir)Tinr.i. r�v.- <br />A <br />10/06/2021 <br />907, <br />0 <br />03/21 /2022 <br />1 00'. <br />A <br />04/05/22 <br />100; <br />PE <br />-PLANS PREPARED BY: <br />2500 Red Hill Ave., #220, Santa Ana, CA 92705 <br />Office: (949) 202-4913 Fax: (818) 840-0708 <br />:CONSULTANT: <br />2500 Red Hill Ave., #220, Santa Ana, CA 92705 <br />Office: (949) 202-4913 Fax: (818) 840-0708 <br />:DRAWN BY: CHK.: -APV.: <br />PLR AM AM <br />=LICENSURE: <br />SHEET TITLE: <br />I-cuF-_�_not inAF�F_Q• QI/ICI(li\I <br />