My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD 2022 T MOBILE ANTENNA Plans 2023-02-24
>
Address Records
>
OLYMPIC BLVD
>
220
>
T MOBILE ANTENNA
>
Plans
>
220 OLYMPIC BLVD 2022 T MOBILE ANTENNA Plans 2023-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2023 11:09:07 AM
Creation date
2/23/2023 2:22:21 PM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
T MOBILE ANTENNA
Permit
B2204-071
Year
2022
Notes
MODIFICATIONS OF T-MOBILE TELECOMMUNICATIONS TOWER
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AB <br />ANCHOR BOLT <br />LAM <br />LAMINATED <br />AC <br />ASPHALTIC CONCRETE <br />LBS <br />POUNDS <br />A. C. <br />AIR CONDITIONING <br />LT <br />LIGHT <br />ADJ <br />ADJUSTABLE <br />LA <br />LIGHTNING ARRESTOR <br />A.F.F. <br />ABOVE FINISH FLOOR <br />LNA <br />LOW NOISE AMPLIFIER <br />ARCH <br />ARCHITECTURAL <br />APPROX. <br />APPROXIMATELY <br />MFR <br />MANUFACTURER <br />A.G.L , <br />ABOVE GRADE LEVEL <br />MAT <br />MATERIAL <br />A.M.S.L. <br />ABOVE MEAN SEA LEVEL <br />MAX <br />MAXIMUM <br />MECH <br />MECHANICAL <br />BD <br />BOARD <br />MIN <br />MINIMUM <br />BLDG <br />BUILDING <br />MISC <br />MISCELLANEOUS <br />BLKG <br />BLOCKING <br />ML <br />METAL LATH <br />BOT <br />BOTTOM <br />MO <br />MASONRY OPENING <br />BSMT <br />BASEMENT <br />MS <br />MACHINE SCREW <br />BTS <br />BASE TRANPGEIVER <br />MTD <br />MOUNTED <br />STATION <br />MTL <br />METAL <br />C <br />COURSE(S) <br />(N) <br />NEW <br />CEM <br />CEMENT <br />NIC <br />NOT IN CONTRACT <br />CL <br />CHAIN LINK <br />NO <br />NUMBER <br />CLG <br />CEILING <br />NTS <br />NOT TO SCALE <br />CLR <br />CLEAR <br />COL <br />COLUMN <br />OA <br />OVERALL <br />CONC <br />CONCRETE <br />O.C. <br />ON CENTER <br />CONST <br />CONSTRUCTION <br />OPNG <br />OPENING <br />CONT <br />CONTINUOUS <br />OPP <br />OPPOSITE <br />CORR <br />CORRIDOR <br />CO <br />CONDUIT ONLY <br />(P) <br />PROPOSED <br />PARTN <br />PARTITION <br />PL <br />PLATE <br />DIA <br />DIAMETER <br />PLAS <br />PLASTER <br />DBL <br />DOUBLE <br />PLYWD <br />PLYWOOD <br />DEPT <br />DEPARTMENT <br />POC <br />POINT OF CONNECTION <br />DEMO <br />DEMOLITION <br />PROP <br />PROPERTY <br />DIM <br />DIMENSION <br />PT <br />PRESSURE TREATED <br />DN <br />DOWN <br />DR <br />DOOR <br />R <br />RISER <br />DTL <br />DETAIL <br />REQD <br />REQUIRED <br />DWG <br />DRAWING <br />RD <br />ROOF DRAIN <br />RM <br />ROOM <br />(E) <br />EXISTING <br />RMS <br />ROOMS <br />EA <br />EACH <br />RO <br />ROUGH OPENING <br />ELEC <br />ELECTRIC <br />ELEV <br />ELEVATION <br />SC <br />SOLID CORE <br />EQUIP <br />EQUIPMENT <br />SCHED <br />SCHEDULE <br />EXP <br />EXPANSION <br />SECT <br />SECTION <br />EXT <br />EXTERIOR <br />SHT <br />SHEET <br />SIM <br />SIMILAR <br />FA <br />FIRE ALARM <br />SPECS <br />SPECIFICATIONS <br />FB <br />FLAT BAR <br />SS <br />STAINLESS STEEL <br />FF <br />FINISH FLOOR <br />STL <br />STEEL <br />FH <br />FLAT HEAD <br />STOR <br />STORAGE <br />FIN <br />FINISHED) <br />STRUCT <br />STRUCTURAL <br />FLR <br />FLOOR <br />SUSP <br />SUSPENDED <br />FOS <br />FACE OF STUDS <br />SW <br />SWITCH <br />FS <br />FINISH SURFACE <br />SWBO <br />SWITCHBOARD <br />FT <br />FOOT, FEET <br />FTC <br />FOOTING <br />THK <br />THICK <br />FW <br />FINISH WALL <br />TI <br />TOMOT IMPUROVIDMAMPLIFIER <br />F.G. <br />FINISH GRADE <br />TMA <br />FUT <br />FUTURE <br />TOS <br />TOP OF SURFACE <br />TS <br />TUBE STEEL <br />GA <br />GAUGE <br />TYP <br />TYPICAL <br />GALV <br />GALVANIZED <br />UNO <br />UNLESS NOTED <br />GL <br />GLASS <br />OTHERWISE <br />GR <br />GRADE <br />GYP <br />GYPSUM <br />VCT <br />VINYL <br />GFCI <br />GROUND FAULT CIRCUIT <br />COMPOSITION <br />INTERRUPT <br />TILE <br />CND <br />GROUND <br />VERT <br />VERTICAL <br />V.I.F. <br />VERIFY IN FIELD <br />HC <br />HOLLOW CORE <br />VG <br />VERTICAL GRAIN <br />HCS <br />HYBRID CABLE SYSTEM <br />HDW <br />HARDWARE <br />W/ <br />WITH <br />HTR <br />HEATER <br />WD <br />WOOD <br />HM <br />HOLLOW METAL <br />WR <br />WATER RESISTANT <br />HORIZ <br />HORIZONTAL <br />WT <br />WEIGHT <br />HR <br />HOUR <br />HT <br />HEIGHT <br />XFMR <br />TRANSFORMER <br />HV <br />HIGH VOLTAGE <br />AT <br />ID <br />INSIDE DIMENSION <br />[ <br />CHANNEL <br />INS <br />INSULATION <br />INT <br />INTERIOR <br />CENTERLINE <br />z <br />ANGLE <br />JT <br />JOINT <br />I?_ <br />PROPERTY LINE <br />SYMBOLS <br />SECTION NUMBER <br />1 BUILDING SECTION PROPERTY LINE <br />A-1 REFERENCE <br />SHEET NUMBER - WROUGHT IRON FENCE <br />r-, WOOD FENCE <br />DETAIL NUMBER <br />1 DETAIL REFERENCE CHAIN LINK FENCE <br />A-1 <br />SHEET NUMBER <br />SECTION NUMBER <br />�A lh�77' <br />CROSS SECTION <br />REFERENCE <br />SEET NUMBER <br />DETAIL NUMBER <br />1 <br />A-1 <br />SHEET NUMBER <br />< > KEY NOTE REFERENCE <br />P POWER SERVICE <br />X TELCO SERVICE <br />T/P TELCO AND POWER SERVICES <br />COAX- COAX CABLE <br />G G GROUNDING <br />0 DOOR NUMBER <br />101 AREA AND/OR ROOM NUMBER <br />MECHANICAL UNIT <br />ABBREVIATIONS AND SYMBOLS <br />1 � � <br />1. ALL PAINT PRODUCT LINE SHALL BE SHERWIN WILLIAMS UNLESS SPECIFICALLY NOTED OTHERWISE. <br />2. CONTRACTOR SHALL PREPARE ALL SURFACES AND APPLY ALL FINISHES PER LATEST EDITION OF <br />MANUFACTURER'S SPECIFICATIONS. <br />3. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS REGARDING SUFFICIENT DRYING TIME BETWEEN <br />COATS WITH PROVISIONS AS RECOMMENDED BY MANUFACTURER FOR EXISTING WEATHER CONDITIONS. <br />4. FINISH COLOR AND TEXTURE OF ALL PAINTED SURFACES SHALL MATCH ADJACENT SURFACES UNLESS <br />OTHERWISE NOTED. <br />5. ALL PAINT MATERIAL DATA SHEET SHALL BE PROVIDED TO THE CELL CARRIER CONSTRUCTION MANAGER. <br />6. PREPARE PREVIOUSLY PAINTED SURFACES BY LIGHT SANDING WITH 400 GRIT SANDPAPER AND <br />NON -HYDROCARBON WASH. PREPARE GALVANIZED SURFACES BY ACID ETCH OR SOLVENT CLEANING IN <br />ACCORDANCE WITH SSPC-SP1. <br />7. FURNISH DROP CLOTHES, SHIELDS, MASKING AND PROTECTIVE METHODS TO PREVENT SPRAY OR <br />DROPPING FROM DAMAGING ADJACENT SURFACES AND FACILITIES. <br />8. APPLY PAINT BY AIRLESS SPRAY, SANDING LIGHTLY BETWEEN EACH SUCCEEDING ENAMEL COAT ON FLAT <br />SURFACES. APPLY MATERIAL TO ACHIEVE A COATING NO THINNER THAN THE DRY FILM THICKNESS <br />INDICATED. <br />9. APPLY BLOCK FILTER TO CONCRETE BLOCK CONSTRUCTION AT A RATE TO ENSURE COMPLETE COVERAGE <br />WITH PORES COMPLETELY FILLED. <br />10. CONTRACTOR SHALL CORRECT RUNS, SAGS, MISSES AND OTHER DEFECTS INCLUDING INADEQUATE <br />COVERAGE AS DIRECTED BY THE T-MOBILE WIRELESS CONSTRUCTION MANAGER. REPAINT AS NECESSARY <br />TO ACHIEVE SURFACES WHICH ARE SMOOTH, EVENLY COATED WITH UNIFORM SHEEN AND FREE FROM <br />BLEMISHES. <br />B. PAINTING SCOPE <br />1. PAINT THE FOLLOWING MATERIALS AND SYSTEMS CHECKED BELOW WITH THE COATING SYSTEM INDICATED. <br />PAINTING SCOPE <br />SURFACE TO BE PAINTED <br />COATING <br />SYSTEM <br />PAINT <br />DO NOT <br />PAI NT <br />N/A <br />BTS UNIT <br />ALL EQUIPMENT & CABINETS OTHER THAN THE BTS UNIT <br />ANTENNA COVERS, TILT BRACKETS, MOUNTING BRACKETS AND <br />ASSOCIATED HARDWARE, CABLE AND CABLE COVERS EXPOSED TO <br />VIEW, EXPOSED CONDUIT AND HANGERS, ETC. <br />FLASHING UNITS, METAL TRIM AND OTHER METAL SURFACES <br />STUCCO, CONCRETE BLOCK AND CEMENTIOUS TYPE FINISH <br />SYSTEMS. <br />PLYWOOD, LUMBER AND WOOD TRIM INCLUDING THE BACK SIDE <br />OF ALL SCREEN WALLS <br />DRYWALL <br />CONCRETE POLES <br />METAL POLES AND METAL POLE STAND-OFF <br />C. COATING SYSTEM SPECIFICATIONS <br />1. DTM ACRYLIC COATING (SERIES B66) BY SHERWIN WILLIAMS CO. 1 MIL DFT PER COAT APPLIED IN TWO <br />(2) COATS OVER DTM BONDING PRIMER (B66A50). <br />2. 100% ACRYLIC, LATEX COATING EQUIVALENT TO A-100 (SERIES A-82) BY SHERWIN WILLIAMS CO. 1 MIL <br />DFT PER COAT APPLIED IN TWO (2) COATS OVER SPECIFIED PRIMER PAINT & PRIMER. <br />j <br />e <br />%.�� <br />! PAINTING SPECIFICATIONcz <br />D. ANTENNAS <br />PRIMER - <br />KEM AQUA E61-W525 <br />TOPCOAT - <br />COROTHANE II B65W200/B6OV22 <br />COAXIAL JUMPER <br />CABLES <br />PRIMER - <br />AS REQUIRED FOR ADHESION. APPLY ONE (1) <br />COAT OF KEM AQUA WATER REDUCIBLE <br />PRIMER E61 W25 <br />REDUCED 25% <br />TOPCOAT - <br />TWO (2) COATS COROTHANE II POLYURETHANE <br />1365W200/B60V2 <br />RAW STEEL <br />PRIMER - <br />KEM BOND HS B50WZ4, DMT ACRYLIC PRIMER <br />TOPCOAT - <br />TWO (2) COATS COROTHANE II POLYURETHANE <br />B65W200/B60V2 <br />GALVANIZED METAL <br />ACID ETCH WITH <br />COMMERCIAL ETCH OR VINEGAR PRIMER COAT AND <br />FINISH COAT (GALVITE HIGH SOLIDS OR <br />DTM PRIMER/FINISH) <br />STAINLESS STEEL <br />PRIMER - <br />OTM WASH PRIMER, B71Y1 <br />TOPCOAT - <br />TWO (2) COATS COROTHANE it POLYURETHANE <br />B65W200/B60V2 <br />PRE -PRIMED STEEL <br />TOUCH UP ANY <br />RUST OR UN -PRIMED STEEL WITH KEM BOND HS, SSQWZ4 <br />PRIMER - DTM WASH PRIMER, B71Y1 <br />TOPCOAT - TWO (2) COATS COROTHANE II POLYURETHANE 1365W200/1360V2 <br />CONCRETE MASONRY <br />PRIMER - PRO MAR EXTERIOR BLOCK FILLER <br />TOPCOAT - TWO (2) COATS A-100 LATEX HOUSE & TRIM, SHEEN TO MATCH <br />CONCRETE STUCCO (EXISTING) <br />TWO (2) COATS A-100 LATEX HOUSE & TRIM, SHEEN TO MATCH <br />STUCCO <br />PRIMER - PRO MAR MASONRY CONDITIONER B-46-W21000 <br />TOPCOAT - SUPERPAINT A-80 SERIES A-89 SATIN A-84 GLOSS <br />WOOD <br />PRIMER - A-100 EXTERIOR ALKYD WOOD PRIMER Y-24W20 <br />TOPCOAT - TWO (2) COATS A-100 LATEX HOUSE & TRIM SHEEN TO MATCH ADJACENT SURFACES <br />FIELD CUTS/DAMAGE (PRIOR TO PRIME & PAINT) <br />FIRST & SECOND COAT - CUPRINOL CLEAR WOOD PRESERVATIVE #158-0356 ALL PENETRATIONS INTO <br />FINISHED CLU-LAMS SHALL BE CAULKED WITH "SIKAFLEX" SEALANT <br />STEEL TOUCH UP <br />STEEL THAT HAS BEEN WELDED, CUT OR SCRATCHED IN THE FIELD SHALL BE TOUCHED UP WITH COLD <br />GALVANIZED PAINT <br />0 <br />F NUJLUI IINiUKIVIAI IUIN: <br />:CURRENT ISSUE DATE: <br />04/05/22 <br />-ISSUED FOR: <br />CONSTRUCTION <br />REV.: —DATE: —DESCRIPTION: —BY: <br />A <br />10/06/2021 <br />90% CONSTRUCTION <br />BAK <br />0 <br />03/21 /2022 <br />100% CONSTRUCTION <br />BAK <br />1 <br />04/05/22 <br />100% CD: REVISED <br />PER CLIENT RL <br />ROY <br />PLANS PREPARED BY: <br />-CONSULTANT: <br />=DRAWN BY: CHK.: APV.:J <br />PLR AM AM <br />=LICENSURE: <br />-SHEET TITLE: <br />SYMBOLSSPECIFICATIONS & <br />HP F-T 1\II IKARF-R° <br />RF_\/IClnNI- <br />
The URL can be used to link to this page
Your browser does not support the video tag.