Laserfiche WebLink
V <br />E <br />9 <br />i <br />N <br />GENERAL PROJECT NOTES <br />1. THE LOCATION OF ALL UTILITIES SHOWN ON THIS PLAN IS APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE <br />EXISTING UTILITIES PRIOR TO EXCAVATION, TO LOCATE UTILITIES, CALL THE UNDERGROUND LOCATE LINE AT <br />1-800-424-5555. <br />2. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING FEATURES, ELEVATIONS, AND <br />PROPERTY LINES SHOWN. IF DISCREPANCIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. <br />3. WHERE CONFLICTS OCCUR BETWEEN EXISTING FEATURES AND THE PLACEMENT OF NEW FACILITIES, THEY SHALL BE <br />BROUGHT TO THE ATTENTION OF THE ENGINEER BY THE CONTRACTOR, AND WILL BE RESOLVED BY THE ENGINEER. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING SURVEY MONUMENTS AND <br />OTHER SURVEY MARKERS DURING CONSTRUCTION. ALL SUCH MONUMENTS OR MARKERS DESTROYED DURING <br />CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. <br />5. THE CONTRACTOR FOR THIS PROJECT SHALL MAINTAIN A CLEAN, LEGIBLE SET OF THESE PLANS AND NOTE ALL <br />DEVIATIONS THEREON, UPON COMPLETION OF CONSTRUCTION, THESE DRAWINGS SHALL BE DELIVERED TO THE <br />ENGINEER FOR THE PREPARATION OF RECORD DRAWINGS. THE ENGINEER SHALL SUBMIT RECORD DRAWINGS TO THE <br />CITY OF EVERETT UPON COMPLETION OF THE PROJECT. <br />6. THE CONTRACTOR SHALL HAVE ACCESS TO THE CURRENT COPY OF THE WASHINGTON STATE DEPARTMENT OF <br />TRANSPORTATION (WSDOT) STANDARD PLANS AND THE 2018 EDITION OF THE SPECIFICATIONS FOR ROAD, BRIDGE <br />AND MUNICIPAL CONSTRUCTION (PUBLICATIONS M21-01 AND M41-10). <br />7. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT TO PREVENT UTILITY INTERRUPTION. NOTIFY THE <br />APPROPRIATE OWNER(S) ONE WEEK IN ADVANCE OF EACH UTILITY CONNECTION. <br />6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AND SHALL COORDINATE ACTIVITIES WITH <br />THE CITY OF EVERETT, THE OWNER AND ENGINEER A MINIMUM OF TWO (2) WEEKS IN ADVANCE OF THE BEGINNING <br />OF WORK. THE CONTRACTOR SHALL PREPARE AND SUBMIT TRAFFIC CONTROL PLANS, AND OBTAIN TRAFFIC <br />CONTROL APPROVAL FROM THE CITY PRIOR TO EXECUTING THE WORK. SAFE VEHICULAR AND PEDESTRIAN ACCESS <br />SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. SHUTDOWN OF OWNER OPERATION OR ACCESS WILL <br />NOT BE PERMITTED. <br />9. AT ALL TIMES THE CONTRACTOR SHALL MAINTAIN SIGNS, BARRICADES, FENCING, OR OTHER MEASURES TO ENSURE <br />CONTINUOUS PROTECTION OF THE PUBLIC AND TO PREVENT UNAUTHORIZED ENTRY TO THE CONSTRUCTION AREA. <br />AT A MINIMUM FENCING SHALL BE 6.0 FEET HIGH. COORDINATE SAFETY AND SECURITY MEASURES WITH ADJACENT <br />WORK. <br />EROSIONSTANDARD I I L NOTES <br />1. APPROVAL OF THE EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF <br />PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND <br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS <br />COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD <br />PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING <br />LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF <br />CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND <br />GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO <br />NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. <br />DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED <br />STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE CONTRACTOR TO ENSURE THEIR <br />CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR <br />WITHIN 48 HOURS FOLLOWING A MAJOR STORM EVENT <br />6. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH <br />BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING, THE CLEANING <br />OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND <br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br />PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF <br />THE SITE, <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE <br />PROPOSED BMPs FAIL, <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS <br />FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />.STANDARD WATER DISTRIBUTION <br />1. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED BACKFI_OW <br />PREVENTION DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY <br />BACTERIOLOGICAL TEST RESULTS. <br />2. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC WORKS DEPARTMENT AT THE <br />DEVELOPER'S EXPENSE. THE PUBLIC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE <br />FOR EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT <br />WHICH THE CONNECTION SHALL BE MADE. <br />3. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. <br />4. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION. THE CITY <br />OF EVERETT PUBLIC WORKS CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />5. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT OF A <br />PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS. <br />6. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN POTABLE AND <br />NON -POTABLE CONVEYANCE SYSTEMS. <br />7. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS DEPARTMENT PERSONNEL ONLY. ALL <br />VALVES, NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />POLLUTION PREVENTION NOTES <br />1. EQUIPMENT LUBRICATION AND FUELING OPERATIONS SHALL OCCUR AT AN APPROVED OFF -SITE LOCATION. <br />2, PREVENT OILS AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH PROPER CONTAINMENT DEVICES. <br />3. SPILL CLEANUP PROCEDURES SHALL BE POSTED ON -SITE. IN CASE OF A SPILL THAT MAY ENTER GROUNDWATER, <br />SURFACE WATER, OR STORM DRAIN SYSTEM, CONTACT THE CONTRACTOR'S CESCL LEAD. SPILLS SHALL BE <br />CLEANED UP IMMEDIATELY AND CONTAMINATED MATERIAL DISPOSED OF PROPERLY. <br />4. THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE FROM ENTERING THE STORM <br />DRAINAGE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE CONTAINMENT/SEPARATION ALL <br />TIMES. <br />5. THE CONTRACTOR SHALL CONDUCT A DAILY STORMWATER / ENVIRONMENTAL INSPECTION OF THE CONSTRUCTION <br />SITE. <br />6. THE CONTRACTOR SHALL TAKE REASONABLE PRECAUTIONS TO CONTROL AND MINIMIZE FUGITIVE DUST EMISSIONS <br />FROM THE PROJECT SITE, <br />DEMOLITION <br />1. REMOVE ALL DELETERIOUS MATERIAL FOUND ON -SITE INCLUDING VEGETATION, SCRAP WOOD, TRASH, ETC. AND <br />DISPOSE OF AT AN APPROVED OFF -SITE LOCATION. <br />2. DAMAGE TO ANY PROPERTY, INCLUDING BUT NOT LIMITED TO, BUILDINGS, UTILITIES, VEHICLES, FENCING, OR <br />LANDSCAPING AS A RESULT OF CONTRACTORS ACTIVITIES WILL BE REPAIRED OR REPLACED AT THE <br />CONTRACTOR'S EXPENSE. <br />3. THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE AND REPAIR OF PAVED SURFACES <br />WHERE DAMAGE HAS BEEN SUSTAINED BECAUSE OF CONSTRUCTION TRAFFIC. <br />4. ALL CONCRETE, PAVEMENT, CURBS, SIDEWALKS AND RAMPS INDICATED TO BE REMOVED OR REPLACED SHALL BE <br />REMOVED TO THE NEAREST EXPANSION JOINT AS IDENTIFIED DURING CONSTRUCTION. WHERE THIS IS NOT <br />POSSIBLE DUE TO CONFLICTS OR ADJACENT DAMAGED CONCRETE / ASPHALT, THE CONTRACTOR SHALL MAKE A <br />FULL PAVEMENT DEPTH SAWCUT AT THE PROPOSED JOINT IN SOUND PAVEMENT. PROPOSED CONCRETE / <br />ASPHALT SHALL EXTEND TO THE SAWCUT EDGE AND BE APPROPRIATELY JOINED / SEALED. THE CONTRACTOR <br />SHALL MAKE SAWCUTS AT EXISTING CONTRACTION JOINTS WHERE POSSIBLE. <br />5. DEMOLISHED CONCRETE MAY BE RUBBLIZED AND UTILIZED AS STRUCTURAL FILL FOR SITE IMPROVEMENTS. <br />RUBBLIZED MATERIAL SHALL MEET WSDOT STANDARDS FOR GRAVEL BORROW PER WSDOT SPECIFICATION <br />9-03.14(l ). CONTRACTOR SHALL STOCKPILE AND COVER RUBBLIZED MATERIAL TO PREVENT STORMWATER <br />CONTACT IN INTERIM CONDITION, <br />COVERINGPLASTIC <br />1. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL MEET THE REQUIREMENTS OF <br />WSDOT STANDARD SPECIFICATIONS SECTION 9-14.5(3). <br />2. COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES ON ROPES <br />WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL DIRECTIONS. ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN <br />FULL LENGTH AND THERE SHALL BE AT LEAST A 12-INCH OVERLAP OF ALL SEAMS. SEE DETAIL Al/C1.7. <br />1 CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED BETWEEN NOVEMBER 1 AND <br />MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY ESTABLISHED. <br />4. WHEN THE COVERING iS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN PLACE UNTIL THE NEXT SEEDING <br />PERIOD. <br />5. PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN ORDER TO PREVENT SURFACE <br />WATER FLOW BENEATH SHEETS. <br />6. PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS. <br />STOCKPILE NOTES <br />1. STOCKPILES SHALL NOT REMAIN EXPOSED AND UNWORKED FOR MORE THAN 2 DAYS BETWEEN OCTOBER 1 AND <br />APRIL 30, AND 7 DAYS BETWEEN MAY 1 AND SEPTEMBER 30. <br />2. 1N ANY SEASON, SEDIMENT LEACHING FROM STOCKPILES MUST BE PREVENTED. <br />3. TOPSOILS SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION OR WHEN THE SUBGRADE IS <br />EXCESSIVELY WET OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR <br />PROPOSED SODDING OR SEEDING, <br />4. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED ACCORDING TO THE <br />APPROVED PLAN. <br />PROTECTIONCB <br />1. CATCH BASIN INSERTS SHALL BE PROVIDED IN THE CATCH BASINS NOTED ON THE PLANS, <br />2. CATCH BASIN INSERT SHALL BE STREAMGUARD SEDIMENT CATCH BASIN INSERT #3003, ULTRA -DRAIN GUARD <br />#9217, OR APPROVED EQUAL. <br />3. CATCH BASIN INSERTS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, AND <br />MAINTAINED TO OPERATE PROPERLY. <br />4. CATCH BASIN INSERTS SHALL BE REMOVED FOLLOWING COMPLETION OF CONSTRUCTION AND STABILIZATION OF <br />ALL CLEARED AREAS. <br />EXCAVATION <br />1. EXCAVATE TO ELEVATIONS, LINES AND GRADES INDICATED TO NOT MORE THAN 1/2-INCH ABOVE OR BELOW THAT <br />REQUIRED. <br />2. SLOPE SIDES OF EXCAVATION AS INDICATED OR COMPLY WITH LOCAL CODES AND ORDINANCES HAVING JURISDICTION, <br />WHICHEVER IS MORE STRINGENT. SHORE AND BRACE WHERE SLOPING IS NOT POSSIBLE BECAUSE OF SPACE <br />RESTRICTIONS OR STABILITY OF MATERIAL EXCAVATED. <br />3. STOCKPILE SATISFACTORY EXCAVATED MATERIALS AS REQUIRED FOR BACKFILL OR FILL. PLACE, GRADE AND SHAPE <br />STOCKPILES FOR PROPER DRAINAGE. LOCATE AND RETAIN SOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS. <br />4. DISPOSE OF EXCESS SOIL AND UNSUITABLE SOIL MATERIAL OFF -SITE AS DIRECTED. <br />SURFACING <br />1. WHERE DIMENSIONS ARE TAKEN FROM THE CURB, THEY ARE TAKEN FROM THE FACE OF CURB, UNLESS OTHERWISE <br />NOTED. <br />2. TOP COURSE OR CRUSHED SURFACING TOP COURSE SHALL CONFORM TO WSDOT 9-03,9(3) REQUIREMENTS. <br />3. BASE COURSE OR CRUSHED SURFACING BASE COURSE SHALL CONFORM TO WSDOT 9-03.9(3) REQUIREMENTS. <br />4. QUARRY SPALLS SHALL CONFORM TO WSDOT 9-13.1(5) REQUIREMENTS. <br />5. HMA PAVEMENT SHALL COMPLY WITH WSDOT STANDARD SPECIFICATIONS SECTION 5-04 <br />6. AGGREGATE FOR HMA PAVEMENT SHALL COMPLY WITH CLASS 1/2" GRADATION PER WSDOT STANDARD <br />SPECIFICATION SECTION 9-03.6 <br />7. BINDER SHALL COMPLY WITH PERFORMANCE GRADE ASPHALT BINDER PG 64-22 PER WSDOT STANDARD <br />SPECIFICATION SECTION 9-02.1(4) <br />B, HMA PAVEMENT SHALL BE COMPACTED TO 92% RICE VALUE. <br />PAINTI I I <br />1. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY STRIPING / SIGNAGE <br />NECESSARY TO MAINTAIN SAFE VEHICLE AND PEDESTRIAN TRAFFIC. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAINTING ALL LINES AND SYMBOLS OBSCURED BY HIS WORK TO <br />THE SATISFACTION OF THE CITY INSPECTOR. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY <br />THE EXISTING STRIPING / SURFACE OF EACH PAVEMENT SEGMENT TO BE RECONSTRUCTED. <br />3. THE CONTRACTOR SHALL LAYOUT ALL PROPOSED PAINT STRIPING FOR OWNER'S REVIEW / APPROVAL PRIOR TO <br />FINAL STRIPING. <br />4. PAINT SHALL BE APPLIED IN TWO APPLICATIONS. THE TIME PERIOD BETWEEN APPLICATIONS SHALL BE IN <br />ACCORDANCE WITH WSDOT SPECIFICATION SECTION 6-22,3(3). <br />5. PAINT SHALL BE TOP -COATED WITH GLASS BEADS PER WSDOT SPECIFICATION SECTION 8-22.3(3)G. <br />6. PAVEMENT MARKING PREPARATION AND INSTALLATION SHALL COMPLY WITH WSDOT STANDARD SPECIFICATION 8-22. <br />7. PAVEMENT MARKING MATERIALS SHALL COMPLY WITH WSDOT STANDARD SPECIFICATION SECTION 9-34 AND BE ON <br />WSDOT QPL LIST <br />8. PAINT SHALL BE WHITE OR YELLOW RETROREFLECTIVE PAINT PER WSDOT 9-34.2 WITH GLASS BEADS PER WSDOT <br />9--34.4. <br />STORM PIPE NOTES <br />STORM DRAIN (SD) GRAVITY SYSTEM SHALL BE CONSTRUCTED OF THE FOLLOWING MATERIALS AND AS NOTED ON <br />PLANS: <br />1. CORRUGATED POLYETHYLENE PIPE (CPEP) AND FITTINGS: SHALL BE DUAL WALL AND COMPLY WITH WSDOT <br />9-05.20 REQUIREMENTS. <br />2, STORM DRAINS SHALL BE INSTALLED PER DETAIL A2/C3.6 UNLESS OTHERWISE NOTED. <br />3. SEE DETAIL Al/C3.6 FOR TYPICAL UTILITY STRUCTURE INSTALLATION. <br />4. GRAVITY STORMWATER SYSTEM SHALL BE LOW PRESSURE AIR TESTED IN ACCORDANCE WITH WSDOT STANDARD <br />SPECIFICATION 7-04,3(1)F. AT THE OWNER'S DISCRETION, PIT DRAINS, MANHOLES, VAULTS OR OTHER ANCILLARY <br />PIPE SYSTEMS MAY BE HYDROSTATICALLY TESTING TO THE OWNER'S SATISFACTION (E.G. PLUG PIPES, FILL <br />STRUCTURE TO SET ELEVATION WITH WATER, AND OBSERVE WATER LEVEL DEVIATION OVER A SET PERIOD OF <br />TIME), <br />GENERAL UNDERGROUND UTILITY <br />1. PIPE BEDDING AND BACKFILL SHALL BE PER DETAIL A2/C3.6. <br />2. DETECTABLE MARKING TAPE SHALL BE INSTALLED ALONG THE FULL LENGTH OF EACH PROPOSED UTILITY. <br />DETECTION TAPE SHALL BE 2-INCH WIDTH (MINIMUM), CONTAIN A 15 MIL SOLID ALUMINUM CORE, BE A MINIMUM <br />OF 5.0 MIL OVERALL THICKNESS, AND BE SUITABLE FOR DIRECT BURY, THE TAPE SHALL BE COLOR CODED <br />ACCORDING TO AWWA AND CONTINUOUSLY IMPRINTED WITH THE TYPE OF UTILITY FOR EACH UTILITY SHOWN. <br />1. TOP OF FILTERRA UNIT SHALL MATCH TOP OF CURB ON EITHER SIDE. TRANSITION PAVING ALONG FLOWLINE PER <br />THROAT OPENING DETAIL B3/C3.8. <br />2, EACH UNIT SHALL BE CONSTRUCTED AT THE LOCATIONS AND ELEVATIONS ACCORDING TO THE SIZES SHOWN ON <br />THE APPROVED DRAWINGS. ANY MODIFICATIONS TO THE ELEVATION OR LOCATION SHALL BE AT THE DIRECTION OF <br />AND APPROVED BY THE ENGINEER. <br />3. IF THE FILTERRA IS STORED BEFORE INSTALLATION, THE TOP SLAB MUST BE PLACED ON THE BOX USING THE 2X4 <br />WOOD PROVIDED, TO PREVENT ANY CONTAMINATION FROM THE SITE. ALL INTERNAL FITTINGS SUPPLIED (IF ANY), <br />MUST BE LEFT IN PLACE AS PER THE DELIVERY. <br />4. THE UNIT SHALL BE PLACED ON A COMPACTED SUB -GRADE WITH A MINIMUM 6-INCH GRAVEL BASE MATCHING THE <br />FINAL GRADE OF THE CURB LINE IN THE AREA OF THE UNIT. THE UNIT IS TO BE PLACED SUCH THAT THE UNIT <br />AND TOP SLAB MATCH THE GRADE OF THE CURB IN THE AREA OF THE UNIT. COMPACT UNDISTURBED SUB -GRADE <br />MATERIALS TO 95% OF MAXIMUM DENSITY AT ±2% OF OPTIMUM MOISTURE. UNSUITABLE MATERIAL BELOW <br />SUB --GRADE SHALL BE REPLACED TO THE SITE ENGINEER'S APPROVAL, <br />5: OUTLET CONNECTIONS SHALL BE ALIGNED AND SEALED TO MEET THE APPROVED DRAWINGS WITH MODIFICATIONS <br />NECESSARY TO MEET SITE CONDITIONS AND LOCAL REGULATIONS. <br />6. ONCE THE UNIT IS SET, THE INTERNAL WOODEN FORMS AND PROTECTIVE MESH COVER MUST BE LEFT INTACT. <br />REMOVE ONLY THE TEMPORARY WOODEN SHIPPING BLOCKS BETWEEN THE BOX AND TOP SLAB. THE TOP LID <br />SHOULD BE SEALED ONTO THE BOX SECTION BEFORE BACKFILLING, USING A NONSHRINK GROUT, BUTYL RUBBER OR <br />SIMILAR WATERPROOF SEAL. THE BOARDS ON TOP OF THE LID AND BOARDS SEALED IN THE UNIT'S THROAT MUST <br />NOT BE REMOVED. THE SUPPLIER (AMERICAST OR ITS AUTHORIZED DEALER) WILL REMOVE THESE SECTIONS AT THE <br />TIME OF ACTIVATION. BACKFILLING SHOULD BE PERFORMED IN A CAREFUL MANNER, BRINGING THE APPROPRIATE <br />FILL MATERIAL UP IN 6" LIFTS ON ALL SIDES. PRECAST SECTIONS SHALL BE SET IN A MANNER THAT WILL RESULT <br />IN A WATERTIGHT JOINT. IN ALL INSTANCES, INSTALLATION OF FILTERRA UNIT SHALL CONFORM TO ASTM <br />SPECIFICATION C691 "STANDARD PRACTICE FOR INSTALLATION OF UNDERGROUND PRECAST UTILITY STRUCTURES", <br />UNLESS DIRECTED OTHERWISE IN CONTRACT DOCUMENTS. <br />7. EACH FILTERRA UNIT MUST RECEIVE ADEQUATE IRRIGATION TO ENSURE SURVIVAL OF THE LIVING SYSTEM DURING <br />PERIODS OF DRIER WEATHER. THIS MAY BE ACHIEVED THROUGH A PIPED SYSTEM, GUTTER FLOW OR THROUGH THE <br />TREE GRATE. <br />8. PROVIDE INLET PROTECTION AT FILTERRA CURB INLETS UNTIL STREET, CURB/GUTTER AND SIDEWALKS ARE PAVED. <br />ULTRATECH 9320 ULTRA GUTTER GUARD, 9" DIAMETER x 6' LONG, <br />9. FOR FILTERRA UNITS INSTALLED WITHIN SIGHT TRIANGLES, PLANTS MAY NOT EXCEED 30 INCHES IN HEIGHT, DWARF <br />FOUNTAIN GRASS (OR SIMILAR) SHALL BE THE FIRST CHOICE FOR INSTALLATION, <br />Permit #: PW1609-a013 <br />Site Address: 2320 RAILWAY AVE <br />Owner: ERT LLC <br />App. Date: 9/10/2018 <br />Description: CONSTRUCTION OF RAILWAY AVE ROAD <br />AND UTILITY IMPROVEMENTS <br />Reviewed By: Date: <br />Office Set Job Site Set Fire/Planning Set <br />REQUIREDI <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN <br />INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND <br />SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL <br />CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN <br />FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID <br />DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING <br />CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANCES REQUIRED <br />SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE <br />PROJECT <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR <br />LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO RIVER." <br />SEEDING <br />1. SEED MIXTURES SHALL BE PER THE "SEED MIXTURE FOR EROSION CONTROL" TABLE BELOW, AND SHALL <br />BE APPLIED AT THE RATE OF 80 LB. PER ACRE. <br />2, SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION AND OTHER <br />MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE. <br />3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE SEED BED WILL BE <br />NECESSARY (E.G. GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING). <br />4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT <br />TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS, AND SEDIMENT BASINS. <br />5. THE SEED BED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE ROUGHENING. <br />PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE. <br />6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS USED SHOULD <br />BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS. <br />7. SEED SHALL NOT BE USED IN AREAS SUBJECT TO WEAR BY CONSTRUCTION TRAFFIC. <br />B. APPLICABLE IN AREAS OF 10% OR LESS SLOPE FOR A MAXIMUM HORIZONTAL DISTANCE OF 100 FEET. <br />IN STEEPER AREAS (>10% SLOPE), USE MULCH, NETTING, OR OTHER TREATMENTS SPECIFICALLY <br />DESIGNED FOR STEEPER AND LONGER SLOPES. <br />SEED MIXTURE FOR EROSION CONTROL <br />NAME PROPORTIONS PERCENT PERCENT <br />BY WEIGHT PURITY GERMINATION <br />REDTOP (AGROSTIS ALBA) 10% 92% 65% <br />ANNUAL RYE (LOLIUM 40% 96% 90% <br />MULTIFLORUM) <br />CHEWING FESCUE (FESTUCA 40% 96% 90% <br />RUBRA COMMUTATA) <br />WHITE DUTCH CLOVER 10% 98% 90% <br />(TRIFOLIUM REPENS) <br />IRENCH SHORING <br />TEMPORARY SHORING F TRENCHING <br />R UTILITIES <br />UE TO POOR GROUND CONDITIONS <br />7 HIGH GROUND WATER <br />PROVIDE <br />s O i.. SHORING CONDITIONS IS EXPECTED. TTE B • l O GEOTECHNICAL <br />REPORT LATERAL - PRESSURES O li <br />ING <br />V) <br />z <br />0 <br />w <br />M <br />0 <br />u <br />N <br />WW <br />V) <br />V) <br />MR-91 <br />0 <br />o� <br />m <br />D <br />ca <br />a_ <br />U <br />J <br />0 <br />W <br />1010) <br />to <br />1 <br />�,. <br />1 <br />N ; <br />zuj <br />CL <br />0 <br />t2 <br />op <br />x <br />R <br />LLJ <br />M <br />D <br />r <br />Y <br />r <br />Ld <br />I <br />�N <br />