19 <br />EXCAVATION NOTES <br />1. EXCAVATE TO ELEVATIONS, LINES AND GRADES INDICATED TO NOT MORE THAN 1/2—INCH ABOVE OR BELOW THAT <br />REQUIRED. <br />2. SLOPE SIDES OF EXCAVATION AS INDICATED OR COMPLY WITH LOCAL CODES AND ORDINANCES HAVING JURISDICTION, <br />WHICHEVER IS MORE STRINGENT. SHORE AND BRACE WHERE SLOPING IS NOT POSSIBLE BECAUSE OF SPACE <br />RESTRICTIONS OR STABILITY OF MATERIAL EXCAVATED. <br />3. STOCKPILE SATISFACTORY EXCAVATED MATERIALS AS REQUIRED FOR BACKFILL OR FILL. PLACE, GRADE AND SHAPE <br />STOCKPILES FOR PROPER DRAINAGE. LOCATE AND RETAIN SOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS. <br />4. DISPOSE OF EXCESS SOIL AND UNSUITABLE SOIL MATERIAL OFF —SITE AS DIRECTED. <br />SHORINGTRENCH <br />TEMPORARY SHORING OF TRENCHING FOR UTILITIES DUE TO POOR GROUND CONDITIONS AND HIGH GROUND WATER <br />CONDITIONS IS EXPECTED. PROVIDE SHORING BASED UPON GEOTECHNICAL REPORT LATERAL PRESSURES ON SHORING <br />WALLS. <br />STRUCTURAL ILL REQUIREMENTS <br />STRUCTURAL FILL SHALL BE GRAVEL BORROW CONFORMING TO WSDOT STANDARD SPECIFICATION 9-03.14(1) WITH THE <br />EXCEPTION THAT THE NO. 200 SIEVE SIZE PERCENT PASSING IS 5.0% MAX. IN LIEU OF 7.0 MAX. <br />OR <br />RECYCLED CRUSHED CONCRETE CONFORMING TO WSDOT SPECIFICATION FOR GRAVEL BORROW OR APPROVED EQUAL. <br />RECYCLED CRUSHED CONCRETE SHALL NOT BE INSTALLED BELOW THE ORDINARY HIGH WATER LEVEL OF THE <br />SNOHOMISH RIVER ADJACENT TO THE SITE OR WITHIN THE HIGHEST LEVEL OF THE SEASONAL GROUNDWATER <br />ELEVATION. <br />COMPACTION <br />GENERAL <br />WHERE SUBGRADE OR LAYER OF SOIL MATERIAL MUST BE MOISTURE CONDITIONED BEFORE COMPACTION, UNIFORMLY <br />APPLY WATER TO SURFACE OF SUBGRADE OR LAYER OF SOIL MATERIAL TO PREVENT FREE WATER APPEARING ON <br />SURFACE RUING OR SUBSEQUENT TO COMPATION OPERATIONS. REMOVE AND REPLACE OR SCARIFY AND AIR DRY, SOIL <br />MATERIAL THAT IS TOO WET TO PERMIT COMPACTION TO SPECIFIED DENSITY. SOIL MATERIAL THAT HAS BEEN <br />REMOVED BECAUSE IT IS TOO WET TO PERMIT COMPACTION MAY BE STOCKPILED OR SPREAD AND ALLOWED TO DRY. <br />ASSIST DRYING BY DISKING, HARROWING OR PULVERIZING UNTIL MOISTURE CONTENT IS REDUCED TO SATIFACTORY <br />VALUE. <br />THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT THE PREPARED AND APPROVED SUBGRADE FROM TRAFFIC, <br />WATER RUN—ON, STANDING WATER, OR OTHER DAMAGE. SUBGRADE THAT HAS BEEN OVER COMPACTED, SHALL BE <br />SCARIFIED TO A MINIMUM DEPTH OF EIGHT (B) INCHES AND RECOMPACTED, <br />PIPE/TRENCH BACKFILL TESTING/INSPECTION REQUIREMENTS <br />GEOTECHNICAL ENGINEER WILL EVALUATE THE ADEQUACY OF THE SUBGRADE SOILS AND IDENTIFY ANY AREAS NEEDING <br />FURTHER WORK, PERFORM IN —PLACE MOISTURE —DENSITY TESTS TO DETERMINE IF THE WORK IS BEING DONE IN <br />COMPLIANCE WITH THE COMPACTION SPECIFICATIONS AND THE INTENT OF THE RECOMMENDATIONS, AND ADVISE ON <br />ANY MODIFICATIONS TO PROCEDURE WHICH MIGHT BE APPROPRIATE FOR THE PREVAILING CONDITIONS. <br />GENERAL TRENCH EXCAVATION, PIPE BEDDING, AND TRENCH BACKFILLING SHOULD BE COMPLETED USING THE GENERAL <br />PROCEDURES DESCRIBED IN WSDOT STANDARD SPECIFICATIONS, SECTION 7-17, OR OTHER SUITABLE PROCEDURES <br />APPROVED BY THE PROJECT CIVIL ENGINEER, AS LONG AS IT MEETS OR EXCEEDS CITY STANDARDS.. <br />UTILITY PIPES SHOULD BE BEDDED IN SAND OR SMOOTH ROUNDED GRAVEL, SUCH AS SPECIFIED IN THE CITY OF <br />EVERETT TYPICAL TRENCH SCHEMATIC DETAILS, WSDOT STANDARD SPECIFICATIONS, SECTION 9-03.12(3) AS MODIFIED <br />FOR SANITARY SEWERS, OR AS RECOMMENDED BY THE MANUFACTURER, AS LONG AS IT MEETS OR EXCEEDS CITY OF <br />EVERETT STANDARDS. PIPE TO BE COVERED WITH BEDDING MATERIAL TO AT LEAST ONE FOOT ABOVE THE PIPE. <br />THIS BEDDING MATERIAL SHOULD BE LIGHTLY TAMPED INTO PLACE. BACKFILL PLACED ABOVE THE BEDDING MATERIAL <br />SHALL CONSIST OF STRUCTURAL FILL <br />PLACED IN LIFTS NOT EXCEEDING 10 INCHES IN LOOSE THICKNESS AND MECHANICALLY COMPACTED AS SPECIFIED <br />BELOW, OR AS MODIFIED BY THE ON —SITE GEOTECHNICAL ENGINEER, <br />COMPACTION CRITERIA: USING THE MODIFIED PROCTOR TEST (ASTM: D-1557) AS A STANDARD, STRUCTURAL FILL <br />USED FOR VARIOUS ONSITE APPLICATIONS SHALL BE COMPACTED TO THE FOLLOWING MINIMUM DENSITIES: <br />FILL APPLICATION MINIMUM COMPACTION <br />PIPE SUPPORT PAD 95 PERCENT OR IN <br />ACCORDANCE WITH <br />MANUFACTURERS SPECIFICATIONS <br />TRENCH BACKFILL — 4 FEET 90 PERCENT OR IN <br />OR DEEPER BELOW FINISH GRADE ACCORDANCE WITH <br />MANUFACTURERS SPECIFICATIONS <br />TRENCH BACKFILL — WITHIN 4 FEET 95 PERCENT <br />OF FINISH GRADE <br />SUBGRADE OBSERVATION AND TESTING REQUIREMENTS <br />REGARDLESS OF MATERIAL OR LOCATION, ALL STRUCTURAL FILL SHOULD BE PLACED OVER FIRM, UNYIELDING <br />SUBGRADES PREPARED IN ACCORDANCE WITH THE SITE PREPARATION SECTION OF THE GEOTECHNICAL REPORT. THE <br />CONDITION OF ALL SUBGRADES SHOULD BE OBSERVED BY GEOTECHNICAL ENGINEER BEFORE FILLING OR CONSTRUCTION <br />BEGINS. ALSO, FILL SOIL COMPACTION SHOULD BE VERIFIED BY MEANS OF IN —PLACE DENSITY TESTS PERFORMED <br />DURING FILL PLACEMENT SO THAT ADEQUACY OF SOIL COMPACTION EFFORTS MAY BE EVALUATED AS EARTHWORK <br />PROGRESSES. <br />WATER SETTLING AND JETTING OF BACKFILL MATERIAL ARE NOT ACCEPTABLE, MECHANICAL METHODS SHALL BE <br />UTILIZED FOR PLACEMENT AND COMPACTION OF A BACKFILL MATERIAL UNLESS OTHERWISE APPROVED IN WRITING BY <br />THE CITY OF EVERETT. <br />THE MINIMM ALLOWABLE TRENCH COMPACTION TESTING FREQUENCY ARE: <br />SHALLOW TRENCH ZONES (TRENCH DEPTH LESS THAN 6 FEET) SHALL BE A MINIMUM OF ONE (1) FIELD DENSITY TEST <br />FOR EVERY 100 LINEAL FEET OF TRENCH. SHOULD SOILS BE INCONSISTEN IN GRADATION AND HOE PACS ARE USED <br />FOR TRENCH COMPACTION, PROFESSIONAL JUDGMENT AND OBSERVATIONS BY THE DEVELOPERS'S GEOTECHNICAL <br />ENGINEER SHALL BE UTILIZED TO DETERMINE COMPACTION ACCEPTABILITY. <br />DEEP TRENCH ZONES (TRENCH DEPTH GREATER THAN 6 FEET), PROVIDE IN PLACE DENSITY TESTS AT MID TRENCH <br />DEPTH AND A SUBGRADE ELEVATION, MINUMUM OF ONE (1) FIELD DENSITY TEST AT EACH ELEVATION TEST PER 100 <br />LINEAL FEET OF TRENCH. THE CONTRACTOR SHALL PROVIDE A SAFE TRENCH FOR THE TESTING AGENCY PERSONNEL <br />TO PERFORM THE COMACTION TESTS. <br />UTILITY STRUCTURES SHALL HAVE A MINUMUM OFTWO (2) IN PLACE DENSITY TEST WITHIN BACKFILL AREA ADJACENT <br />TO EACH MANHOLE, CATCH BASIN, VAULT AND OTHER UTILITY STRUCTURES. <br />IF ADDITIONAL TESTING IS REQUIRED DUE TO FAILURE OF AREAS TESTED, THE CONTRACTOR SHALL PAY FOR SURCH <br />RETESTING BY THE OWNER'S TESTING AGENCY. <br />TRUCK NOT a 1' HEAVY COMPACTORPRESENCE OF THE cEOTECHNICAL <br />ENGINEER, DO NOT PROOF ROLL WET OR SATURATED SUBGRADES. LIMIT VEHICLE SPEED TO THREE MPH. ANY <br />LOCALIZED i OF •• i DISCLOSED DURING • i '1 OPERATION i i BE OVER <br />EXCAVATED TO A MINIMUM DEPTH OF 12 INCHES AND REPLACED WITH A SUITABLE STRUCTURAL FILL MATERIAL. ALL <br />STRUCTURAL BE COMPACTED ACCORDING TO THE RECOMMENDATIONS PROVIDED ABOVE. REPLACINGM <br />RECOMPACTING SOILS WILL BE INCIDENTAL TO FILL AND BACKFILL WORK. THE SOIL WILL BE RETESTED AND MUST <br />PASS,SUBSEQUENT PROOF i SPECIFICALLY,APE is SOILS UNDERLYING <br />PROGRESSING.SHOULD BE COMPACTED TO AT LEAST 95 PERCENT (BASED ON ASTM D-1557. SHOULD THE SUBGRADE SURFACE OF <br />THE PROOF ROLL TESTED AREA NOT DEFLECT, IT WILL BE CONSIDERED ACCEPTABLE AND WORK MAY CONTINUE <br />COMPACTION AND OBSERVATION: ALL B AND BASE COURSE MATERIAL SHOULD BE COMPACTED O AT LEAST <br />SHOULD95 PERCENT OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D-1557), AND ALL ASPHALT CONCRETE <br />`; D TO AT a 92 PERCENT OF A A i i i • <br />SHALL i i i C • COMPACTION iBEFORE OVERLYING LAYER PLACED. <br />FOR THE SUBBASEPAVEMENT COURSE,COMPACTION BEST OBSERVED BY aFREQUENT <br />w THE BASE METHODOLOGY OBSERVATIONS it HAND—PROBINARE MORE APPROPRIATE THa <br />DENSITY <br />ROADWAY.SUBBASE COURSE INPLACE DENSITY TESTING SHALL BE A MINIMUM OF FOUR TESTS PER 100 LINEAL FEET OF <br />THE DEVELOPER SHALL OBTAIN THE SERVICES OF A GEOTECHNICAL ENGINEER LICENSED IN THE STATE OF WASHINGTON <br />TO BE ONSITE FOR SOIL ACCOUNTABILITY AND COMPACTION DURING EXCAVATION ON A PART TIME OR FULL TIME <br />BASIS AS NECESSARY. THE CONTRACTOR SHALL FOLLOW GEOTECHNICAL RECOMMENDATION AS INCLUDED IN THE <br />GEOTECHNICAL REPORT BY THE MIGIZI GROUP DATED FEBRUARY 7, 2020, <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING ALL EXCAVATIONS. ALL WATER GENERATED FROM <br />DEWATERING OPERATIONS SHALL BE DESPOSED OR IN MANNER AND LOCATION APPROVED BY THE CITY OF EVERETT. <br />THE CONTRACTOR SHALL PREPARE A DEWATERING PLAN AND HAVE A AN ON—STIE MEETING WITH THE PUBLIC WORKS <br />'INSPECTORS TO GO OVER THE DEWATERING PLAN PRIOR TO TRENCHING. THE DEWATERING PLAN SHALL BE AVAILABLE <br />ON —SITE AT ALL TIMES AND UPDATED AS NEEDED TO REFLECT THE CONSTRUCTION CONDITIONS. THE DEWATERING <br />PLAN SHALL INCLUDE APPROPRIATE SHORING, BASED UPON SOIL CONDITIONS AND THE DEWATERING PROCESS. <br />SHORING SHALL CONFORM TO ALL SAFETY STANDARDS AS REQUIRED BY LOCAL AND STATE JURISDICTIONS. <br />ALL GROUNDWATER OR INCIDENTAL SURFACE RUNOFF COLLECTED SHALL BE DISCHARGED TO THE ON —SITE <br />STORMWATER SYSTEM FOLLOWING APPROPRIATE TREATMENT UNTIL CONSTRUCTION IS COMPLETE. <br />NO SEDIMENT, TURBID WATER, OTHER POLLUTANTS (HEAVY METALS, OIL SHEEN, ETC.) SHALL BE DISCHARGED TO THE <br />ON -SITE STORWATER SYSTEM. ANY TREATMENT OF COLLECTED WATER SHALL BE APPROVED BY THE DITY OF <br />EVERETT PRIOR TO DISCHARGE. <br />A LOG OF ALL DISCHARGED STORMWATER SHALL BE KEPT ON —SITE AT ALL TIMES DURING CONSTRUCTION. AT A <br />MINIMUM, THE LOG SHALL CONTAIN THE FOLLOING ITEMS: <br />a DATE DISCHARGED <br />® SOURCE OF WATER (VAULT, PIPE, ETC.) <br />® TYPE OF WATER DISCHARGED (GROUNDWATER, STORMWATER, ETC.) <br />® METHOD OF COLLECTION (PUMP TO TANK, ETC.) <br />a METHOD OF DISCHARGE (DRAIN FROM TANK, PUMPED DISCHARGE, ETC.) <br />® VOLLME OF WATER DISCHARGED <br />9 DISCHARGE LOCATION <br />® RECEIVING SYSTEM (ON —SITE STORM SYSTEM, SEWER, OFF —=SITE FACILITY, ETC.) <br />® DURATION OF DISCHARGE, <br />ANY STORWATER COLLECTED INTO A TRUCK SHALL NOT BE DISCHARGED TO THE STORWATER SYSTEM. <br />SITE EXPLORATIONS ENCOUNTERED GROUNDWATER SEEPAGE AT A DEPTH OF APPROXIMATELY 7 TO 10 FEET BELOW <br />EXISTING GRADE. THE MAJORITY OF THE SOILS ENCOUNTERED ON —SITE ARE SILTY, GRANULAR ALLUVIAL SOILS, WHICH <br />COULD POTENTIALLY BE WATER BEARING DURING WINTER MONTHS. THE CONTRACTOR SHOULD BE PREPARED TO DEAL <br />WITH THIS CONDITION. <br />FOR SHALLOW EXCAVATIONS ABOVE THE WATER TABLE, SHOULD GROUNDWATER BE ENCOUNTERED, IT IS ANTICIPATED <br />THAT AN INTERNAL SYSTEM OF DITCHES, SUMP HOLES, AND PUMPS WILL BE ADEQUATE TO TEMPORARILY DEWATER <br />EXCAVATIONS. FOR DEEPER EXCAVATIONS BELOW THE WATER TABLE, MORE EXTENSIVE DEWATERING EQUIPMENT, SUCH <br />AS WELL POINTS, COULD BE NECESSARY IN ORDER TO TEMPORARILY DEWATER EXCAVATIONS. THE APPROPRIATE <br />DEWATERING SYSTEM WILL BE DETERMINED BY THE CONTRACTOR DURING CONSTRUCTION, WHEN THE SPECIFIC <br />SUBGRADE CONDITIONS ENCOUNTERED iN THE PIPE TRENCH ARE DIRECTLY OBSERVABLE. CONTRACTOR SHOULD BE <br />PREPARED FOR MORE EXTENSIVE DEWATERING AT THAT TIME SHOULD IT BE NEEDED. <br />TV INSPECTION OF STORM AND SEWER PIPING <br />ALL NEW STORM AND SEWER MAINS WITHIN THE PUBLIC RIGHT--OF--WAY AND THOSE IN EASEMENTS TO BE MAINTAINED <br />BY THE CITY WILL BE SUBJECT TO A VISUAL INSPECTION WITH A TV CAMERA UNIT. THE CONTRACTOR SHALL <br />PERFORM THE TV INSPECTION AND PROVIDE A CD OF THE VIDEO TO EVERETT PERMIT SERVICES TO BE REVIEWED BY <br />THE CITY SEWER AND DRAINAGE DIVISION. ANY DEFICIENCIES NOTED BY THE TV CAMERA INSPECTION SHALL BE <br />CORRECTED TO THE STATISFACTION OF THE CITY UTILITIES DIVISION. <br />IT SHALL BE THE RESPONSIBILITY OF THE CONTACTOR TO FURNISH MATERIALS AND INSTALL MONUMENTS AND <br />CASTINGS IN ACCORDANCE WITH THE DRAWINGS AND WHERE DIRECTED BY THE ENGINEER. ALL SURVEY WORK SHALL <br />BE PERFORMED BY OR UNDER THE DIRECT SUPERVISION, OF A PROFESSIONAL LAND SURVEYOR (PLS) LICENSED IN THE <br />STATE OF WASHINGTON. MONUMENT AND MONUMENT CASE AND COVER SHALL BE SUPPLIED AND INSTALLED PER CITY <br />OF EVERETT STANDARD DRAWING 323 AND 324. EACH MONUMENT SHALL BE RECORDED ON THE CITY'S SURVEY <br />RECORD FORM AND SUBBMITTED WITH THE PROJECT AS—BUILTS. <br />SURVEYING, AS REQUIRED TO CONSTRUCT A GIVEN PROJECT PER THE APPROVED PLANS, SHALL BE FURNISHED BY <br />THE DEVELOPER AT NO EXPENSE TO THE CITY. IT IS REQUIRED THAT SURVEY STAKES BE SET FOR NEW CURB AND <br />GUTTER CONSTRUCTION, FOR BOTH HORIZONTAL AND VERTICAL CONTROL. ADDITIONALLY, ANY WATER, STORM DRAIN, <br />OR SANITARY SERWER MAINS WHICH ARE TO BE CONSTRUCTED IN EASEMENTS ARE TO HAVE SURVEY OFFSET STAKES <br />SET PRIOR TO STARTING WORK, AND ANY DEVIATION FROM THAT STAKED LINE MUST BE LEFT UNCOVERED AND <br />RESURVEYED TO REALIGN EASEMENT AS REQUIRED AND FOR CORRECTED AS —BUILT INFORMATION. <br />MONUMENTS SHALL BE LOCATED AT ALL CENTERLINE INTERSECCTIONS OF INTERSECTING STREETS. CURVED STREETS <br />SHALL BE MONUMENTED AT CENTERLINE PI'S (POINT OF INTERSECTION), IF IT FALLS WITHIN THE STREET PAVEMENT, <br />OTHERWISE THE PC (POINT OF CURVATURE) AND PT (POINT OF TANGENCY) OF THE CURVE SHALL BE MONUMENTED. <br />IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE SURVEYING REUIRED TO EXTABLISH OR PERPETUATE <br />LAND CONER MONUMENTATION AS MAY BE REQUIRED ON THE PROJECT. REFER TO THE CITY OF EVERETT 'DESIGN <br />AND CONSTRUCTION STANDARDS AND SPECIFICATIONS', VOLUME 1, SECTION 3-10.3,CONSTRUCTION REQUIREMENTS FOR <br />LAND CORNER SURVEYING, REPLACING AND RESTORING AN EXISTING OR OBLITERATED GLO CORNER(S), AND FILING <br />LAND CORNER RECORDS FOR THESE MONUMENTS, AND CERTIFICATION LETTER. IF UNACCEPTABLE ERRORS ARE FOUND <br />DUE TO ERRORS OR OMISSIONS BY THE CONTRACTOR'S SURVEY ACTIVITIES, THEN THE CONTRACTOR SHALL CORRECT <br />THESE ERRORS INCLUDING REMOVING AND REPLACING IMPROVEMENTS AND PAY ALL EXPENSES INCURRED BY THE CITY <br />INCLUDING THE RE —SURVEY. <br />PRIOR TO THE ACCEPTANCE OF THE WORK BY THE CITY OF EVERETT, THE CONTRACTOR SHALL FURNISH THE CITY <br />ENGINEER ONE NEATLY AND LEGIBLY MARKED SET OF THE CITY APPROVED, WET STAMPED PLOTTER PAPER DRAWINGS <br />OF SIGNIFICANT PERMANENT ITEMS SHOWING ANY AND ALL CHANGES IN THE FINAL LOCATIONS OF ALL ITEMS OF WORK <br />INCLUDING, BUT NOT LIMITED TO, CURB AND GUTTER, STORM DRAIN LINES, WATER LINES, SEWER LINES, CATCH BASINS, <br />MANHOLES, FIRE HYDRANTS, VALVES, NEW AND EXISTING UTILITIES AND ALL OTHER MISCELLANEOUS ITEMS INCLUDED IN <br />THE WORK. MARKING OF THE DRAWINGS SHALL REPRESENT ALL CHANGES, VERTICAL AND HORIZONTAL, AND BE DONE <br />AT THE TIME THE MATERIAL AND EQUIPMENT IS INSTALLED. PROVIDE THE CITY WITH A ONE HARD COPY OF THE <br />AS-BUILTS TURNED 1N WITH A CITY OF EVERETT PERMIT COUNTER TRANSMITTAL FORM. THE INSPECTOR WILL REVIEW <br />AND STAMP WITH RECORD DRAWING STAMP/INSPECTOR SIGNATURE. <br />AS -BUILT DRAWINGS SHALL BE CONSIDERED AN ITEM ON THE CONTRACTOR'S PUNCH LIST. <br />AFTER APPROVAL, THE CONSTRUCTION PERMIT CAN BE FINALED/CLOSED OUT. <br />WARRANTY BOND <br />A WARRANTY BOND IS REQUIRED i BE AAND THE SYSTEM <br />WILL i REMAINOWNER/CONTRACTOR'S <br />�ESPONSIBILITY DURING THE WARRANTY TIME PERIOD, AND IS THEN TURNEOVER TO THE CITY OF EVERETT FOR <br />OWNERSHIP AND MAINTENANCE OF ,,, OF i CONSTRUCTION <br />STANDARDS, CHAPTER 1 FOR MORE INFORMATION). <br />m <br />w <br />w <br />ui <br />0 <br />v <br />m <br />U) <br />CC C> <br />00 <br />cn <br />iZ <br />N <br />cn <br />0 <br />U) <br />C <br />J <br />0 <br />a <br />0 <br />0 <br />vi <br />121 <br />cn <br />® <br />cl <br />co <br />o <br />9 <br />co <br />w <br />V <br />z <br />0� <br />F- <br />U) <br />U) <br />w <br />U) <br />z <br />fn <br />a <br />wLU <br />o <br />CL <br />Ld <br />C <br />(L <br />�. <br />< <br />t. <br />r <br />< <br />I <br />4.. <br />is <br />Lo <br />m <br />�_„ <br />(o <br />_. <br />0Ld <br />o <br />} <br />,1 <br />x_ <br />g <br />r <br />( <br />miz <br />', <br />�! <br />dcn <br />4_" <br />£ <br />rr <br />• <br />If i.. <br />SHEET NO. <br />C002 <br />